|
Preparation Of Design Documentation For The Construction Of Parkowa Street, Elsnera Square And Part Of Polna Street And Part Of Zagrodowa Street In Sidzina As Part Of The Task Construction Of Roads In Sidzina1. The Subject Of The Order Is: Development Of Comprehensive Design And Cost Estimate Documentation For The Construction Of Roads, Parking Spaces, Street Lighting And Water And Sewage Networks (Supplementing Missing Sections, Designing Connections At The Road Border) In Sidzina Along With Obtaining A Building Permit Or The Final Zrid Decision.2. The Preliminary Location Of The Roads Has Been Marked On The Overview Map. The Length Of The Road Sections To Be Designed Is Approximately 1.25 Km, I.E.: Ul. Park Part Plot No. 816 (Length Approx. 110 Meters) And Plot No. 817 (Approx. 540), Part Street Zagrodowa Plot No. 335 (Length Approx. 140 Meters), Part Street Polna, Plot No. 324 (Length Approx. 140 M) And Plac Elsnera Within The Scope Of The Plot In The Scope Of Plot No. 228 (Length Approx. 170 M), Plot No. 319 (Length Approx. 140 M), Plot No. 320 And Plot 321. 3. A Detailed Description Of The Subject Of The Order Is Included In The Annex To Swz No. 94. Scope Of The Subject Of The Order Includes, Among Others: 1) Obtaining All Information Necessary For The Proper Design Process, 2) Obtaining A Map For Design Purposes, 3) Obtaining The Necessary Arrangements And Opinions For The Implementation Of The Investment, 4) Obtaining The Necessary Technical Conditions And Arrangements Necessary To Submit A Complete Application For Obtaining A Decision To Authorize The Implementation Of A Road Investment, 5) Obtaining The Necessary Permits For The Implementation Of The Investment, Including: Water Permit, Permit For The Removal Of Trees And/Or Shrubs, Etc., If Required, 6) Preparation Of Data For The Development Of Real Estate Divisions, 7) Removal Of Conflicts With The Power Grid And The Sanitary And Storm Sewage System, 8) Preparation Of A Land (Plot) Development Design, 9) Preparation Of Main Projections, Possibly Other Necessary Sketches And Drawings Presenting The Adopted Design Solutions, 10) Preparation Of Complete Construction Documentation For All Industries, Including A Plot/Area Development Design, Architectural And Construction Design And Technical Design, In Four Copies In Paper Form, In One Copy In Electronic Form On A Cd-R In Word Or Pdf Format And One Copy In An Editable Form In Dwg Or Similar Format, 11) Development Of A Project For Permanent Target Traffic Organization, In Four Copies In Paper Form, In One Copy In Electronic Form On A Cd-R In Word Or Pdf Format And One Copy In Editable Form In Dwg Or Similar Format, 12) Preparation Of Investor Cost Estimates And Bills Of Quantities, Prepared In Accordance With The Currently Applicable Applicable Legal Regulations, In Two Copies In Paper Form And One Copy In Electronic Form On A Cd-R In Pdf Format And In The Norma Program In An Editable Version, Separately For Each Street, 13) Updating The
|