|
1.1 Engineer/Architect, Senior Level, Including Additional Charges:, 1.2 General Manager With Additional Charges:, 2.1 Supply And Placement Of Work Sign In Galvanized Sheet #26, Esp. 0.45 Mm, Plotted With Vinyl Adhesive, Affixed With 4.8X40 Mm Rivets, On Metal Structure Of Metalon 20X20 Mm, Special. 1.25 Mm, Including Support In Autoclaved Eucalyptus Painted With Pva Paint Two (2) Coats:, 2.2 Location Of Work With Template Of Boards Pointed Runs Every 2.00M, Reuse (2X), Including Monitoring Of Topographic Team To Mark Topographic Point:, 3.1 Construction Of Base And Sub-Base For Paving Soil With Lateritic Behavior (Sandy), With A Thickness Of 15 Cm - Excluding Excavation, Loading And Transport And Soil. Af_09/2024:, 01/12/2025 - 15:46:57, 01/12/2025 - 15:46:58, 3.2 Horizontal Excavation, Including Scarification On 2Nd Category Soil With Crawler Tractor (125Hp/Blade: 2, 70M3). Af_07/2020:, 3.3 Transport With 14 M Dump Truck, On Urban Road In Natural Bed (Unit: Txkm). Af_07/2020:, 4.1 Construction Of Base And Sub-Base For Paving Lateritic (Sandy) Soil, 4.2 Horizontal Excavation, 4.3 Transport With 14 M Dump Truck, 4.4 Pebbles Or Rolled Gravel (Type: Fine):, 5.1 Execution Of Paving On An Interlocking Floor, With Block Rectangular Natural Color Measuring 20 X 10 Cm, Thickness 8 Cm. Af_10/2022:, 6.1 Curb Guide, In Concrete With Fck 20Mpa, Pre-Molded, Mfc-01 Der-Mg Standard, Dimensions (12X16, 7X35)Cm, Excluding Gutter, Including Excavation, Piping And Transport With Removal Of Excavated Material (In Cacamba):, 6.2 Urban Concrete Gutter (Scu), Type 3, With Fck 15 Mpa, Width 50Cm With Slope Of 25%, Esp. 7Cm, Der-Mg Standard, Excluding Curb, Piling And Transport With Removal Of Excavated Material (In Cacamba):
|