|
Junior Construction Civil Engineer With Additional Charges, General Manager With Additional Charges., Supply And Placement Of Construction Sign In Galvanized Sheet #26, Esp.0, 45 Mm, Plotted With Vinyl Adhesive, Affixed With Rivets 4, 8X40 Mm, On Metal Structure Of Metalon 20X20 Mm, Esp. 1, 25 Mm, Including Autoclaved Eucalyptus Support Painted With Pva Paint Two (2) Coats, Removal Of Iron Grid, Removal Of Gutters And Flashings, Manually, Without Reuse. 11:51:02, 11/28/2025 - 11:51:25, 11/28/2025 - 11:51:45, 11/28/2025 - 11:51:56, Mechanized Concrete Demolition, Without Frame, With Electrical Equipment, Including Removal And Stacking, Excluding Removal Transport Of Demolished Material, Manual Removal Of Wooden Or Metallic Door Or Window Leaf, With Reuse, Exclusive Transportation And Removal Of Non-Reusable Removed Material, Demolition Of Mortars, In A Mechanized Way With A Hammer, Without Reuse. Af_09/2023, Demolition Of Ceramic Coating, Mechanized Using Commartelete, Without Reuse. Af_12/2017, Demolition Of Masonry For Any Type Of Block, In A Mechanized Way, Manual Excavation Of A Trench With A Depth Of Less Than Or Equal To 1.5M, Including Lateral Unloading, Shaping And Unshaping Of Board And Batten, Reuse (5X), Exclusive Shoring, Cutting, Bending And Assembly Of Ca-50 Steel, Diameter (6, 3Mm To 12.5Mm), Including Spacer, Bending And Assembly Of Ca-60 Steel, Diameter (4.2Mm To 5.0Mm), Including Spacer, Supply Of Structural Concrete, Prepared On Site, With Fck 25Mpa, Including Laying, Thickening And Finishing, Reinforced Concrete Block 20Mpa, Inclusive Ballast 5 Cm In Concrete 9 Mpa, Lateral Forms And Deformation, Masonry Sealing With Perforated Ceramic Brick, Esp. 14Cm, For Coating, Including Mortar For Laying, Protection Grid With 5/8 Square Iron Bar, 1/2 Round Bar Grille Gate And 1.1/4X3/16 Flat Bar Frame, Including Bolt, Padlock Holder And Hinges (Supply/Manufacture, Laying Of Steel Or Iron Metal Grating Or Gate, Exclusive Supply, Replacement Of Light Or Medium Wooden Door Leaves 90Cm Wide, Considering Reuse Of Material Af_12/2019, Removal And Reinstallation Of Wooden Frame, Exclusive Frame, Including Fixing Accessories: Nails And Cement Mortar, Hydrated Lime And Sand, For Sinking, Manual Leveling And Mechanized Ground Compaction With Vibration Plate, Exclusive Deforestation, Deforestation, Cleaning/Mowing The Land, Leveling Layer With Mortar, Mix 1:3 (Cement And Sand), 20Mm Width, Manual Application, Mechanical Preparation, Concrete Walkways E = 8 Cm, Fck = 15 Mpa City Hall Standard, Conventional Machined Concrete Floor With Fck 15Mpa, With Welded Mesh Ribbed Type Q 138, Polished Finish At Zero Level, 12Cm Wide, Including Supply, Laying, Densification, Excluding Expansion Joint, Plaster Applied To Masonry And Internal Concrete Structures, With 1:3 Mortar Mixer Prepared In Concrete Mixer 400L.Af_06/2014, Plastering With 138 Type Q 138 Mortar, Mixture 1:2:8 (Cement, Lime And Sand), 20Mm Spacer, Ceramic Coating For Internal Walls With Extra Enamelled Plates Of Dimensions 33X45 Cm Applied To The Entire Height Of The Walls.Af_02/2023_Pe, Manual Sanding On Walls To Remove Paint, Manual Sanding On Metal Surfaces To Remove Paint Ink And/O Ant Background
|