Concrete Repair Work – 2025-1004748_Munich Airport_Renovation C5 & 3Rd Network S6, N3 And S8. Main Services: Expanding Approx. 92M² Of Concrete Ceiling, Thickness Approx. 40 Cm Approx. 92 M² Expanding Hydraulically Bound Base Layer, Thickness Approx. 20 Cm Approx. 50M Of Slot Gutter Replacement (Existing Gutter 0.5M Wide, New Slotted Gutter 0.8M Wide) Approx. 740 M² Ads, D = 4 Cm Create (Ring Service Road) Approx. 410M² Create Ads, D = 4Cm (Asphalt Shoulder C5) Approx. 410M² Ats, D = 14Cm Create (Asphalt Shoulder C5) Approx. 70 Running Meters Of Concrete Separation Cuts, Cutting Depth Approx. 60 Cm, Predominantly Dowelled Or Anchored, Including Hgt Approx. 570 M³ Construction Traffic Areas - Gravel Base Layer Approx. 300 M² Construction Road - 10 Cm Ac-Tds: Remove Approx. 165 M² Of Concrete Ceiling, Thickness Approx. 40 Cm. Remove Approx. 165 M² Of Hydraulically Bonded Base Layer, Thickness Approx Remove, Store On The Side, Install Approx. 2,500 M² Of Topsoil Sow Approx. 1,600 M² Of Soil Transport To Interim Storage Approx. 3,000 T Of Soil Dispose Of Approx. 350 M³ Of Gravel Base Layer And Reinstall Approx. 850 M² Of Subsoil Deliver And Lay Out Approx. 150 M² Of Separating Tiles Approx. 65 M³ Of Concrete Ceiling C35/45, Lp Concrete, Exposure Class Xf4, Xm2, 14 Cm Produce Approx. 25 M² Ac32ts, D = 10 Cm Produce Approx. 650 M² Ac22bs, D = 8 Cm Produce Approx. 675 M² Ac11ds, D = 4 Cm Produce Approx. 3,325 M³ Cable Trenches / Shaft Excavations Up To 3.50 M Deep Create Approx. 440 M Cable Conduit Route / 24-Speed, Dn200 Pp-Hm, Including Molded Parts, Laid In Sections Approx. 1,400 M³ Concrete Casing For Empty Cable Conduit Route 3X8 / 4X6 Dn200 Approx. 970 M Earthing Strip Steel 30 X 3.5, Mat. No. 1.4571, Incl. Connector, Earthing System Test 5 Pcs Cable Duct, Rectangular Duct, Lxwxd I.L. 300X250x200 Cm, Including Shaft Cover 70 X 140 Cm And Shaft Equipment 2Nd Construction Phase - Construction Site Twy N3 / Production Of Cable Conduit Route Construction 2Nd Construction Phase: June 22Nd, 2026 - August 21St, 2026 Construction - 2Nd Ba / Sub-Area Cable Conduit Route Twy N3: 06/22/2026 - 07/24/2026 Construction - 2Nd Ba / Sub-Area, Adjacent Areas: 06/22/2026 - 08/21/2026 Main Services: Approx. 70 Running Meters Of Separating Cuts In Concrete, Cutting Depth Approx Approx. 40 Cm Approx. 165 M² Remove Hydraulically Bound Base Layer, Thickness Approx. 20 Cm Approx. 120 Running Meters Of Separating Cuts Asphalt, Cutting Depth Approx. 30 Cm Remove Approx. 70 M³ Of Bituminous Coverings, Expand In Layers Ac-Ds, Ac-Bs, Ac-Ts Remove Approx. 100 M³ Of Topsoil, Store It On The Side, Install Approx. 500 M² Of Topsoil Sowing Approx. 480 M³ Of Soil Transport Approx. 900 T Of Soil Dispose Of Approx. 210 M³ Of Gravel Base Layer And Reinstall Approx. 520 M² Of Subgrade Deliver Approx. 150 M² Of Separating Tiles, Lay Out Approx. 65 M³ Of Concrete Cover
|