Jetties – Comfort Of The Small Pier Of Sables D’Olonne. For The Different Parts Of The Works, The Work Consists Of: - Risberm: Rehabilitation Of The Berms Of The Pier Head And The Pier By Installing A New Anti-Sink Wall And Covering It With A Reinforced Concrete Slab; Injections To Fill The Voids Present In The Body Of The Berm And Implementation Of A Draining And Filtering Backfill Between The New And The Old Barrier Wall. - Jetty: Implementation Of Tight Tie Rods, In The Lower Part Of The Pier, On A Section Subject To Swelling (20 M); Rehabilitation Of The Facings The Creation Of Stringers On Micropiles Supporting The Weight Of The New Facings And The Installation Of New Prefabricated Facings On Each Side Of The Pier; - Bullnose: Repair Of Joints/Cracks On Masonry Facings; Injection To Fill The Voids Present In The Body Of The Pier Head And Reconstruction Of The Upper Slab In Reinforced Concrete. - Crest: Reconstruction Of The Upper Slab In Reinforced Concrete. - Abutment Of The Wooden Footbridge: Injections To Restore The Foundations Underpinning The Abutment Of The Footbridge. A Variant Offer At The Initiative Of The Candidates Specific To The Methods Of Execution Of The Work Is Authorized. This Variant Can Only Relate To The Drainage And Filtration System Planned At The Level Of The Berm. A Preparation Period Of 4 Months Is Planned For Spring 2026. The Work Will Be Interrupted During The Summer Of 2027.
Contact Information
Address
Hôtel du Département 40 rue du Maréchal Foch
Contact No.
0228858400
Email
secretariat.juridique@vendee.fr
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105459170
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.