|
Lot 1 - Local Construction Administration (Engineer And Supervisor), Lot 1 - Siding With Metallic Tile. Af_03/2024, Lot 1 - Rental Of Container 2, 30 Af_03/2022_Ps, Lot 1 - Conventional Lease Of Work, Using Template Of Pointed Running Boards Every 2.00M - 2 Uses. Af_03/2024, 11/27/2025 - 14:16:20, Lot 1 - Demolition Of Reinforced Concrete Slabs, Mechanized With A Hammer, Without Reuse. Af_09/2023, Lot 1 - Demolition Of Simple Concrete Floor, Lot 1 - Removal Of Accessories, Manually, Lot 1 - Removal Of Gutters And Flashings, Lot 1 - Demolition Of Perforated Block Masonry, Lot 1 - Demolition Of Mortars, Mechanically Using A Hammer, Lot 1 - Removal Of Windows, Lot 1 - Removal Of Doors, Lot 1 - Removal Of Fiber-Cement, Metallic And Ceramic Tiles, Mechanized, Using A Crane, Lot 1 - Removal Of Wooden Scissors, With Spans Greater Than Or Equal To 8M, Lot 1 - Removal Of Metallic Or Wooden Weft For Ceiling, Lot 1 - Removal Of Electrical Cables, With A Section Of Up To 2.5 Mm², Lot 1 - Removal Of Crockery, Lot 1 - Removal Of Light Fixtures, Lot 1 - Demolition Of Ceramic Coating, Lot 1 - Removal Of Wooden Flooring (Floor And Beam), Lot 1 - Loading, Maneuvering And Unloading Of Rubble In A 10 M³ Dump Truck - Loading With Excavator Hydraulic (0.80 M³ / 111 Hp Bucket) And Free Discharge (Unit: M3). Af_07/2020, Lot 1 - Transport With 10 M³ Dump Truck, On Urban Road In Natural Bed (Unit: M3xkm). Af_07/2020, Lot 1 - Mechanized Excavation For Crowning Block Or Footing With Backhoe Loader (Including Excavation For Placing Formwork). Af_01/2024, Lot 1 - Ballast With Granular Material (Crushed Stone No. 1 And Crushed Stone No. 2), Applied On Floors Or Slabs On Ground, Thickness Of **10 Cm**. Af_01/2024, Lot 1 - Manufacture, Assembly And Disassembly Of Shoe Formwork, In Sawn Wood, E=25 Mm, 4 Uses. Af_01/2024, Lot 1 - Insulated Shoe Frame, Baldrame Beam And Running Shoe Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Lot 1 - Block Frame, Insulated Footing, Baldrame Beam And Running Footing Using 12.5 Mm Ca-50 Steel - Assembly. Af_01/2024, Lot 1 - Concreting, Fck 25Mpa, With Use Of Pump And Launching, Densification And Finishing (Ref 96558), Lot 1 - Surface Waterproofing With Asphalt Emulsion, 2 Coats. Af_09/2023, Lot 1 - Mechanized Trench Backfilling With Hydraulic Excavator (Bucket Capacity: 0.8 M³/Power: 111 Hp), Width Up To 1.5 M, Depth From 1.5 To 3.0 M, With Soil (Without Replacement) Of 1St Category, With Percussion Soil Compactor. Af_08/2023, Lot 1 - Mechanized Excavation For Baldrame Beam Or Track Footing With Mini-Excavator (Including Excavation For Placing Formwork). Af_01/2024, Assembly And Disassembly Of Formwork For Baldrame Beam, Lot 1 - Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 5.0 Mm Ca-60 Steel - Assembly. Af_06/2022, Lot 1 - Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 6.3 Mm Ca-50 Steel - Montag
|