1.Introduction This Pci Has Been Prepared To Highlight Principle Health And Safety Issues Arising From The Proposed Fitting Out Of Careers Wales Barry, 49 Holton Rd, Barry Cf63 4Hf Regulation 4: (4) A Client Must Provide Pre-Construction Information As Soon As Is Practicable To Every Designer And Contractor Appointed, Or Being Considered For Appointment, To The Project. Regulation 11: (6) The Principal Designer Must— Assist The Client In The Provision Of The Pre-Construction Information Required By Regulation 4(4); And (B) So Far As It Is Within The Principal Designer’S Control, Provide Pre-Construction Information, Promptly And In A Convenient Form, To Every Designer And Contractor Appointed, Or Being Considered For Appointment, To The Project. Regulation 12: (3) The Principal Designer Must Assist The Principal Contractor In Preparing The Construction Phase Plan By Providing To The Principal Contractor All Information The Principal Designer Holds That Is 4 Of The Pci Relevant To The Construction Phase Plan Including— (A) Pre-Construction Information Obtained From The Client; Any Information Obtained From Designers Under Regulation 9(3)(B). The Principal Contractor Shall Use And Develop This Information As Part Of His Duties And Responsibilities Under The Cdm Regulations. Regulation 4(5): A Client Must Ensure That— (A) Before The Construction Phase Begins, A Construction Phase Plan Is Drawn Up By The Contractor If There Is Only One Contractor, Or By The Principal Contractor: ……. Regulation 12: (1) During The Pre-Construction Phase, And Before Setting Up A Construction Site, The Principal Contractor Must Draw Up A Construction Phase Plan Or Make Arrangements For A Construction Phase Plan To Be Drawn Up. (2) The Construction Phase Plan Must Set Out The Health And Safety Arrangements And Site Rules Taking Account, Where Necessary, Of The Industrial Activities Taking Place On The Construction Site And, Where Applicable, Must Include Specific Measures Concerning Work Which Falls Within One Or More Of The Categories Set Out In Schedule 3. This Document Should Be Read In Conjunction With The Associated Pci Information Referred To Within. Description Of Project The Refurbishment Of Part Of Careers Wales Barry, 49 Holton Rd, Barry Cf63 4Hf . The Works Will Consist Of: - Softstrip Supply & Install Floor Coverings Supply & Install Ceilings Supply & Install Partitions / Wall Lining / Doors Sets Supply & Install Timber Skirting Works Tape & Jointing Internal Decoration Electrical/ Small Power Fire Signage Lighting Ventilation Tea Point Glazed Manifestation Tiling Disabled Toilet Pack The Project Is Notifiable Under Cdm 2015. The Location Of The Site: 49 Holton Rd, Barry Cf63 4Hf Project Dates: Early December 2025 (Tbc) Proposed Completion: Early February 2025 (Tbc) Client: Careers Wales, Churchill House, Cardiff, Cf10 2Hh Principal Designer: To Be Appointed Designers By The Principle Contractor In Line With Careers Wales Requirements. Other Consultants / Designers: To Be Appointed By Principle Contractor Proposed Use Of Structure / Building: Under The Workplace (Health, Safety And Welfare) Regulation 1992 A Workplace Is Defined As Any Premises Or Part Of Premises Which Are Made Available To Any Person As A Place Of Work, And Includes: Any Place Within The Premises To Which Such Person Has Access While At Work; And Ii. Any Room, Lobby, Corridor, Staircase, Road Or Other Place Used As A Means Of Access From That Place Of Work Or Where Facilities Are Provided For Use In Connection With The Place Of Work Other Than A Public Road. The Site Will Be Deemed A Workplace Under The Aforementioned Regulations And Therefore Must Comply With The Provisions Of The Regulations Existing Records And Plans A List Of Available Information Relevant To This Project Can Be Found Within The Contract Documentation. It Should Be Noted That Any Record Drawings And Information Provided By The Client, Project Manager Or Design Team May Not Be Entirely Accurate Or Provide A Complete Record. The Principal Contractor Should Verify The Accuracy Prior To Commencing Work. All Principal Contractors Who Have Submitted An Interest To Tender For The Project Must Arrange A Site Visit To Survey And Measure The Site On A Date And Time Agreed By Careers Wales. Please Note Due To The Current Covid 19 Situation And To Keep Human Interaction To A Minimum Only Two Persons From Each Principle Contractor Are To A Attended The Pre-Planned Site Visit. Asbestos R&D Survey To Be Undertaken By The Principle Contractor Tenders For This Work Can Be Submitted In Welsh. Tenders Submitted In Welsh Will Not Be Treated Less Favourably Than Those Submitted In English. The Closing Dates For The Tender Will Be The Same For Those Submitted In Welsh And English. The Timetable For Responding To The Bids In Welsh Will Be The Same As Those Submitted In English
Contact Information
Contact Person
Mr Paul Powell
Address
Unit 4 Churchill House, 17 Churchill Way,
Contact No.
+44 2920846578
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105407175
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.