|
Painting Work – Zug / Painting Work. Painting Work Including Preparation Of The Substrates In The Interior And To A Small Extent In The Exterior Of The New Building Bt 3 And The Existing Components 1 And 2. Execution On Mineral Substrates (New And Existing Plaster, Exposed Concrete, Plasterboard) On Walls And Ceilings, Metal Substrates Of Frames And Door Leaves, Radiators And Pipes, Wooden Substrates (Roof Beams), As Well As Glazing Work On Exposed Concrete Walls And Ceilings. Execution On 4 Floors From Basement To Top Floor. Execution Height Mostly 3.70 M, In The Top Floor And Stairwells Up To 7.50 M. Overview Of Essential Individual Services With Quantities: Preparing Substrates: Protective Covers Approx. 250 M2, Masking Approx. 5800 M, Cleaning Interior Wall Including Filling Of Defects Approx. 8000 M2, Cleaning Ceilings Including Filling Of Defects Approx. 1400 M2, Filling The Entire Interior Wall Gk, Plaster, Concrete Approx. 600 M2, As Before, Each. Ceilings Approx. 100 M2, Surface Filling Of Stairwell Parapets Approx. 150 M2, Subsequent Filling Of Edges Approx. 90 M, Filling Of Joints Approx Width Approx. 100 M, Overhaul Coating Walls Approx. 1500 M2, Reveals, Supports Up To 30 Cm Wide Approx. 60 M, Reveals, Supports Up To 60 Cm Wide Approx. 40 M, Overhaul Coating Parapets Staircase Approx. 150 M2. Initial Coating Of Ceilings Approx. 600 M2, Overhaul Coating Of Ceilings And Staircases Approx. 450 M2, Initial Coating Of Skylight Coverings, Ceiling Aprons And Ceiling Supports And Casings Made Of Gk Approx. 500 M2. Retouching And Glazing Work On New Exposed Concrete Walls And Ceilings In 2 Stairwells, Self-Service Quality 2: Cleaning Wall Surfaces Approx. 1000 M2, Cleaning Ceiling Surfaces Approx. 200 M2, Cleaning Wall Surfaces With A Quick Concrete Cleaner Approx. 1000 M2, Cleaning Ceiling Surfaces With A Quick Concrete Cleaner Approx. 200 M2, Filling Damaged Areas Approx. 50 Pieces, Filling Edges And Joints Approx. 60 M, Retouching Of Defects With Glaze Approx. 200 M2, Leveling, Pigmented Glaze System With Thin Layer Paint For Concrete On A Sol-Silicate Basis As A Primer, 1St And 2Nd Glaze Coat On Walls Approx. 1000 M2, On Ceilings And Staircases Approx. 200 M2, Protective Glaze Clear Walls Approx. 1000 M2, Protective Glaze Clear Ceilings And Staircases Approx. 200 M2, Creating Sample Areas Approx. 8 Pieces. Painting Steel Frames As Initial Coating Approx. 80 Units, Initial Coating Of Steel Door Leaf Approx. 8 Units, Painting Steel Surrounding Frames As Overhaul Coating Approx. 28 Units, Initial Coating Of Steel Door Leaf Approx. 5 Units, Painting As Initial Coating Of Sheet Steel Stair Railing Approx. 180 M2, Painting Handrail As Initial Coating Approx. Painting Handrail As An Overhaul Coating Approx. 130 M, Painting Sprinkler Pipes As An Initial Coating Approx. 190 M, Painting Heating Pipes As An Initial Coating Approx. 20 M, As An Overhaul Coating Approx. 35 M, Overhaul Coating Panel Radiators Approx. 35
|