|
Construction Work - Adaptation Of The Building At Ul. Kartuska 32/34 In Gdańsk For The Needs Of The Gdańsk Benefits Center (Gcś) Along With Technical Infrastructure And Land Development.. 1. The Subject Of The Order Is The Implementation Of An Investment Task Entitled: Adaptation Of The Building At Ul. Kartuska 32/34 In Gdańsk For The Needs Of The Gdańsk Benefits Center (Gcś), Together With Technical Infrastructure And Land Development. 2. The Construction Work Covered By This Procedure Is Part Of The Project Entitled: Sustainable Rainwater Management Systems In Gdańsk, Submitted For Implementation Under European Funds For Infrastructure, Climate And Environment Program 2021-2027, Priority Fenx.01 Support For The Energy And Environment Sectors From The Cohesion Fund Co-Financed By The Cohesion Fund, Measure: Fenx.01.02 Adaptation Of Urban Areas To Climate Change, Project Type: Support For Sustainable Rainwater Management Systems With Green/Green-Blue Nature-Based Infrastructure/Solutions (Zni). 3. The Scope Of The Investment Includes The Construction Of A Storm Sewage System With A Retention Tank And A Pumping Station, Rain Gardens, As Well As A Road System With Parking Spaces, Sidewalks, Area Lighting, Elements Of Small Architecture And Greenery Development. In The Investment Area There Is A Sports Field Used By Children And Teenagers, Which Will Be Preserved. The Implementation Of The Project Aims To Improve The Functionality, Aesthetics And Safety Of Land Use, As Well As To Increase Its Retention Capacity And Ecological Character By Using Solutions Based On Sustainable Rainwater Management (Rain Gardens, Retention Reservoir, Greenery). 4. The Scope Of The Works Includes All Works, Activities And Works Necessary To Complete The Investment Task, Including In Particular The Following Elements: A) Demolition, Preparatory And Reconstruction Works, B) Construction Of Rain Gardens, A Retention Tank And Pumping Station, C) Stormwater Sewage Network, D) Area Lighting, E) Reconstruction And Construction Of Roads, Parking Spaces And Sidewalks, F) Area Marking, G) Dismantling Of The Existing Shelter Garbage Shelter, H) Delivery And Installation Of A New Garbage Shelter, I) Dismantling Of Existing Bicycle Racks And Their Installation In The Place Indicated By The Facility User, J) Delivery And Installation Of Benches And Waste Bins, K) Dismantling Of The Existing 34 M Long Fence And Installation Of A New 27 M Long Fence, L) In Terms Of Greenery: Cutting Down, Replanting And Planting, M) Dismantling Of The Existing Pylons For The Duration Of The Works And Their Installation After The Completion Of The Works In The Place Indicated By The User Of The Facility, N) Moving The Time Capsule To The Place Indicated By The User Of The Facility, O) Installation, Maintenance And Removal Of A One-Sided Information Board With Dimensions Of 120X60 Cm, After The Durability Period Of The Eu Project, Board Template (Annex No. Paved And Green Areas, S) Cleaning Works, Removal And Disposal
|