Construction Work – Reconstruction Of The Płonia Mała Pumping Station In Gdańsk. 1. The Subject Of The Order Is The Implementation Of The Investment Task Entitled: Reconstruction Of The Płonia Mała Pumping Station In Gdańsk. 2. The Construction Work Covered By This Procedure Is Part Of The Project Entitled: Sustainable Rainwater Management Systems In Gdańsk, Under The European Funds For Infrastructure, Climate And Environment Program 2021-2027, Priority Fenx.01 Support For The Energy And Environment Sectors From The Cohesion Fund Co-Financed By The Cohesion Fund, Measure: Fenx.01.02 Adaptation Of Urban Areas To Climate Change, Project Type: Support For Sustainable Rainwater Management Systems With The Participation Of Green/Green-Blue Infrastructure/Nature-Based Solutions. 3. The Subject Of The Investment Is The Reconstruction Of The System Of The Existing Rainwater Pumping Station Płonia Mała In Gdańsk And The Drainage Of Rainwater And Meltwater From The Existing Catchment Area Of The Pumping Station, And Then In The Future To Receive Rainwater From Ul. Elbląska. The Order Includes Replacement Of Pumping Equipment, Modernization And Automation Of The Pumping Station Control System, And Preparation Of The Pumping Station For The Future Reception Of Rainwater From Ul. Elbląska. The Investment Consists Of Elements In The Area Of The Current Płonia Mała Pumping Station And In A Fragment Of The Expansion Tank (Pump Canal A) As Well As Works In The Vicinity, Within The Embankment Of The Pleniewski Canal (Also Known As The Dzielka River) And The Canal Bed. 4. The Material Scope Of The Order Includes All Works, Activities And Works Necessary To Complete The Investment Task, Including The Following Elements: 1) Dismantling The Current Grating Chamber Together With The Suction Pipelines Between The Chamber And The Building Of The Existing Pumping Station; 2) Deepening The Expansion Tank With Shaping The Bottom; 3) Demolition Of The Existing Pressure Pipelines From The Existing Pumping Station; 4) Construction Of A Cleaning Machine - A Device For Mechanical Removal Of Screenings With A Hardened Storage Surface For A Container For Screenings; 5) Construction Of A New Pumping Station With A Reinforced Concrete Structure Along With New Drainage Pipelines; 6) Purchase And Installation Of Pumps Along With Their Commissioning And Start-Up, Pump Room Equipment; 7) Adaptation Of The Current Pumping Station Building Into A Control Room For The New Pumping Station And Cleaning Plant; 8) Construction Of A New Energy Supply System (New Power Pole With Power Line, Control In The Pumping Station, Area Lighting); 9) Disassembly Of The Old And Construction Of A New Maneuvering Area; 10) Disassembly Of The Existing Two-Pipe Shore Outlet; 11) Reconstruction Of A Fragment Of The Retaining Wall With Holes For The Passage Of Three Outlet Pipes; 12) Construction Of An Outlet Chamber On A Fragment Of The Flood Embankment Along With 3 Outlet Pipes; 13) Reconstruction Of A Fragment Of The Flood Embankment; 14) Construction Of Strengthening The Bottom Of The Pleniewski Canal; 15) Construction Of Linear Drainage; 16) Restoring Greenery; 17) Installation, Maintenance And Removal Of The Information Board After The Duration Of The Eu Project. 5.Contractor Under Rea
Contact Information
Contact No.
+48 583205100
Email
drmg@gdansk.gda.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105117801
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.