Feasibility Study, Advisory Service, Analysis – Nks Review Ii. Beat Specialist.Fel.Ell.. Short Name Of The Procedure: National Transport Strategy Major. Up. Ell. Long Name Of The Procedure: Revision Of The National Transport Infrastructure Development Strategy And Performance Of The Expert Tasks Of Phase Ii Subject Of The Procedure, Quantity: 1 Piece - For Individual Transport, Or Preparation Of A National Convergence Strategy (Nks 2050) For Passenger And Goods Transport, Supported By A Traffic Study Based On A Traffic Network Model, And Conducting The Related Strategic Environmental Assessment (Sec) Procedure In The European Union Regulatory Environment As Follows: The Purpose Of The Enterprise Agreement Is To Replace The Comprehensive, New National Convergence Strategy (Hereinafter: Nks2050) By Revising The Nks2014. Creation, Which, Taking Into Account The Current Domestic And International Mobility Needs Affecting The Domestic Network, Offers An Overall Transport Solution To Manage The Future, Forecasted Mobility Needs, While Making Suggestions For The Management Of Various Problems Affecting The Transport, All This In Addition To The Optimal Use Of The Resources Devoted To The Operation And Development Of The Transport System. The Task Of The Successful Bidder Is To Create A Computerized Overall Traffic Model For The Territory Of Hungary (Area 93,026 Km², Population 9.562 Million People Core Area: The Entire Population Of Hungary, Where The Traffic Investigation Affects Hungary In The Core Area. ) Ak Core Area Means The Area In Which The Substantive Traffic Investigation Took Place And Does Not Include The Related Border Areas, Which Are Only Used For The Construction Of The Model And Are Necessary To Conduct The Appropriate Investigations. The Main Tasks And Expected Results Of Strategy Creation: • Methodological Summary Document (Minimum 10 A4 Typed Pages) • Memorandum Of The Meeting Prepared By The Winning Bidder And Finalized By The Parties (A Non-Literal Reminder Of The Meeting Recording The Main Points Of The Meeting.) • Methodological Summary Of Traffic Modeling Product Definition Sheet (Minimum 10 A4 Typed Pages, Figures (Without) • Hypothesis Collection (Presentation Of At Least 500 Collected, Systematized, Evaluated Hypotheses (500 Hypotheses: Title, Content, Name Of Submitting Organization, Evaluation Of The Hypothesis, With Justification, Place Among The Organized Hypotheses) • Situation Evaluation (Situation Evaluation Report And Its Comprehensible Summary (In The Attachment: Presentation Of Swot Analysis) (Minimum Length 150 A4 Typed Pages, The Scope Of The Comprehensible Summary To Be Prepared As Part Of The Task Is 5-15 Typed Pages Of A4. In The Appendix: A Detailed Explanation Of The Proposals Included In The Swot Analysis In One Paragraph (Typically 1-5 Sentences/Paragraphs), As Well As The Supporting Materials) • Supported Swot Analysis: • Development Of A Vision Document (Maximum 1 A4 Typed Page) • Situation Evaluation Report: • Identification Of Strategic Goals: List Of Strategic Goals (Document Containing A List Of Strategic Goals, Which Are Prepared
Contact Information
Address
Than Károly Utca 3-5
Contact No.
+36 203124961
Email
szekely.agnes@kti.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105101972
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.