Architectural Design Services – Motor Train Maintenance Workshop Design. As A Result Of A Public Procurement Tender Successfully Conducted In 2024, Gysev Zrt. Decided To Purchase 11 Intercity Locomotives With Financing Under A Loan Agreement Concluded With The European Investment Bank, In Addition To The Guarantee Of The Hungarian State. The Designer Must Prepare The Detailed Plans Described In This Chapter Regarding The Establishment Of The Maintenance And Repair Base For Electric And Ic Locomotives, Regardless Of Whether Or Not The Given Construction Activity Is Considered An Activity Subject To A Construction Permit In The Current Legal Environment. It Is Necessary To Establish A Thermally Insulated Workshop For The Maintenance And Assembly Of Railway Vehicles With A Net Floor Area Of Approx. With Summary Technical Content: • Three Track Maintenance And Repair Hall • One Track Wash Hall (Two Parts Of The Building: Mercy Wash And Vehicle Wash Hall) • Workshops, Warehouses, Offices, Social Rooms • The Workshop Must Be Suitable For Repairing At Least 3 106 M Long Electric Locomotives At The Same Time. • The Main Characteristics Of The Track Network Providing Rail Service To The Workshop: O Planned Speed: Max. 20 Km/H O Planned Axle Load: 225 Kn O Planned Superstructure: Uic54 System Rails, New Reinforced Concrete Sleepers, Seamless Design O The Tracks In The Workshop Hall Are Designed With Shafts And Side Rails • For The Workshop Tracks - With The Exception Of The Railway Vehicle Maintenance And Assembly Workshop - The Construction Of An Overhead Line System Is Necessary Due To The Transformation Of The Track Network Of The Organizing Station Overhead Line Conversions. • Construction Of A New Street Lighting Network To Illuminate The Surroundings Of The Workshop, Conversion Of The Existing Street Lighting. • Conversion Of Fet System. • Necessary Transformation And Expansion Of Telecommunications Facilities. • Building The Utility Connections Of The Workshop Base, Protecting And Replacing The Utilities Running In The Area Affected By The Development As Necessary. • Construction Of Road Access, Internal Traffic Roads, Paving Within The Site, And Construction Of Parking Lots. The Designer Is Obliged To Perform The Following Tasks: 1. Preparation Of Archaeological Work Parts Erd - Preliminary Archaeological Documentation Since The Properties Are Affected By Archaeological Sites And The Project Is Considered A Major Investment, Preliminary Archaeological Documentation Must Be Prepared For The Building Permit Application. 2. Parts Of Work To Be Prepared (Draft, Permitting And Execution Plans) The Designer Must Prepare The Detailed Plans Described In This Chapter For The Establishment Of The Maintenance And Repair Base For Electric And Ic Locomotives, Regardless Of Whether Or Not The Given Construction Activity Is Classified As An Activity Subject To A Building Permit In The Current Legal Environment. The Plans Were Designed By M
Contact Information
Contact No.
+36 302564892
Email
juhasz.krisztina3@mavcsoport.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 105096729
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.