Tender For Fabrication And Associated Jobs In Apu Plants (Lpg-Iii, Gsu-14, Cfu-Iii & Chu-Iv) During Turn Around Jobs; 1 A-1 Group A - Pipeline Fabrication in LPG-III plant 2 3" CM-40-2102 V-409 REPLACEMENT IBR 3 V-409 STANDPIPE 4 C-402 NEAR STEAM TRAP REP 5 V-410 LG STAND 6 3" CL-40-1901-B1A 1.5" BY-PASS REPL LV-1901 BYPASS 7 2" P-40-1910-B1A REPLACEMENT LEF TO REBOILER DRAIN 8 LP STEAM HEADER END FLANGE REPLACEMENT 9 UV-1601B-DRAIN AND VENT REPLACEMENT 10 DRYER INLET/OUTLET SMALL BORE REPLACEMENT 11 LZ-E402 D2 INSTALLATION OF NEW THERMOWELL AND SMALL BORES 12 STEAM DRUM LEG 13 40-F-401 HEATER WINCH 14 REPLACEMENT OF INSTRUMENT AIR LINES 15 MP STEAM (BATTERY LIMIT) IBR 16 LP STEAM (BATTERY LIMIT) IBR 17 PSV NEW LINE (FLARE LOCATION) 18 REPLACEMENT OF E-405 COOLING WATER BYPASS LINE VALVE AND FLANGE 19 FABRICATION OF LTCS FLARE LINE PROPANE CONDENSER 20 MP STEAM MANIFOLD IBR 21 LP STEAM MANIFOLD IBR 22 LPG PLANT COMMON DRAIN POINT CHANGE 23 W. DRAIN PT BETWEEN NRV AND DISCHARGE VALVE OF SECONDARY OTS A/B/C 24 DRYER AREA SMALL BORE (A) REPLACEMENT 25 DRYER INLET LINE FT-PTS 26 SMALL BORE REPLACEMENT IN RPV AND DPV AREA 27 SUPPLY OF TEST RINGS OF LPG-III VAPORIZER 28 Group A - Pipeline Fabrication in CFU-III plant (Existing Line Replacement) 29 INSTRUMENT AIR-EXISTING LINE REPLACEMENT 30 FT-1202 1/2" TAPING REPLACEMENT 31 X-2602 A/B DPT REPLACEMENT 32 FT-1203 1/2" TAPING REPLACEMENT 33 REPLACEMENT OF LV-1305 ISOLATION VALVE 34 26-PDT-1422 REPLACEMENT IN BAKSET FILTER 35 ATMOSPHERIC STEAM COND -TOP FLANGE REPLACEMENT 36 H2S SAMPLE POINT 37 OFF GAS SAMPLE POINT (NACE) 38 REPLACEMENT OF 14" IBR FLANGE AT B/L 39 Group A - Pipeline Fabrication in CFU-III plant (New Fabrication) 40 N2 CBD DRUM V-2610 41 SERVICE WATER CBD DRUM V-2610 42 REPLACEMENT OF GASKET, STUD/NUTS MP STEAM LINE STUBS & OTHER JOBS (OSBL) 43 INSTALLATION OF VALVE IN LPG COOLER (26-E-2606) 44 INSTALLATION OF GATE VALVE & DRAIN (26-E-2605) 45 2" PRESSURIZED STEAM LINE 46 BATTERY LIMIT LP STEAM LINE JOB 47 BATTERY LIMIT STEAM CONDENSATE LINE 48 Group A - Pipeline Fabrication in GSU-14 plant (New Fabrication) 49 FT-SMALL BORE 50 SAMPLE POINT FOR AMINE SOLUTION 51 SAMPLE POINT FOR ACID 52 PHE PLATFORM STEAM LINE CONDENSATE LINE 53 STEAM DRUM LEG 54 RE-BOILER STEAM CONDENSATE OUTLET (A/B) 55 REPLACEMENT OF FLANGE IN 14 FV 1602/03 56 PHE LEAN SIDE DRAIN POINT FOR VAPOUR RELEASE 57 PHE RICH IN SMALL BORE REPLACEMENT 58 REPLACEMENT OF INST AIR LINES IN GSU-14 59 SUPPLY OF TEST RINGS OF GSU-14 E-1401 60 Group A - Pipeline Fabrication in CHU-IV plant (Existing Line Replacement) 61 INSTRUMENT AIR 62 STEAM DRUM LEG 63 REPLACEMENT OF SERVICE WATER LINES 64 Group B - Structural fabrication in CHU-1V plant 65 Requirement of working platform for X-401 A/B & Prefilter of X-401A/B. 66 Partial replacement of hand railing 67 Support needed for FT 68 Group B - Structural fabrication in CFU III plant 69 Replacement of hand railing 70 Requirement of platform for operational use 71 Replacement of hand railing 72 Replacement of platform support (Tapered Beam) 73 Requirement of platform for operational use 74 Replacement of platform support (Tapered Beam) 75 Group B - Structural fabrication in LPG-III plant 76 Replacement of hand railing 77 Replacement of platform support (Tapered Beam) 78 Replacement of platform support (Tapered Beam) 79 Replacement of platform support (Tapered Beam) and concrete base 80 Replacement of concrete base 81 Requirement of platform for operational use 82 Requirement of platform for operational use (PSV isolation) 83 Requirement of platform for operational use 84 Group B - Structural fabrication in GSU-14 plant 85 Replacement of ejector line 86 Requirement of support replacement of fuel gas line 87 Requirement to replace drain line of pump 88 Requirement of platform for operational use(X-1404) 89 Requirement of steam trap basket 90 Requirement of line supports bracket for P-1402 to C-1402 91 Replacement of concrete base 92 Requirement of platform for operational use 93 Replacement of drain line of V-1403 94 Replacement of hose station support for V-1403 95 Replacement of Seal pot stand bracket of P-1408 96 Replacement of discharge line support for P-1408 97 Replacement of Seal pot stand bracket of P-1407 98 Replacement of discharge line support for P-1407 99 Replacement of Seal pot stand bracket of P-1406 100 Replacement of discharge line support for P-1406 101 Replacement of hand railing platform for T-1401 102 Replacement of stand pipes of switches 103 Replacement of pipe line supports 104 Replacement ofworking platform of manhole cover of V-1409 105 Replacement of hand railing of V-1409 106 Replacement of top platform of V-1409 107 Replacement of top platform and hand railing of T-1402 108 Replacement of stand pipes of switches of T-1402 109 Replacement of stand pipes T-1402(LT) 110 Replacement of stand pipes T-1402(LT) 111 Small Bores 112 Material Cost - Small Bores 113 Service Cost - Small Bores 114 Supply Of Blinds 115 Supply of Blinds (As per SOW) 116 Repair of Demister Pads & Cold Box Strainers 117 Repair of Demister Pads 118 Repair of Cold Box Strainers 119 Quoted Tender Value, GST inclusive in Figures 120 Quoted Tender Value, GST inclusive in Words
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 104842367
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.