|
Executive Project For Concrete Structure (Including Foundation), Executive Electrical And Logic Project, Executive Project For Hydro Sanitary Facilities, Executive Project For Spda, Executive Project For Medical Gases, 14/11/2025 - 15:21:15, Executive Project For Fire Prevention And Fighting, Supply And Placement Of Construction Plate In Galvanized Sheet #26, Esp. 0.45Mm, Dimension (3X1.5)M, Plotted With Vinyl Adhesive, Affixed With 4.8X40mm Rivets, On 20X20mm Metal Structure, Special. 1.25Mm, Including Support In Autoclaved Eucalyptus Painted With Two (2) Pva Paints, Fixed Protective Siding For Closing Work In Plywood Sheet, Esp. 12Mm, With Module Size Of (110X220)Cm, Including Latex Paint (Pva) With Two (2) Coats, Exclusive Opening For Gate, Land Cleaning, Including Weeding, Raking With A Distance Of Up To Twenty (20) Meters And Controlled Burning, Temporary Connection With Air Energy Input, Cemig Standard, Installed Load Of 15, 1Kva Up To 30Kva, Three-Phase, With Underground Output, Including Pole, Meter Box, Circuit Breaker, Busbar, Grounding And Accessories, Temporary Water Connection For Site, Including Hydrometer And Easel For Water Measurement - Main Entrance, In Galvanized Steel Dn 20Mm (1/2) - Dealership Standard, Work Lease With Template Of Running Boards Pointed Every 2.00M, Reuse (2X), Including Topographic Team Monitoring To Mark Topographic Point, Construction Shed For Deposit And Type-Ii Tooling, Internal Area 25, 41M2, Made Of Resin Plywood, Including Furniture (Medium-Sized Project, Effective 30 To 60 Men), Der-Mg Standard, Mobilization, Transport Of Personnel And Demobilization Of Work, Manual Excavation Of Trench With A Depth Of Less Than Or Equal To 1.5M, Manual Backfilling Of Trench, Loading Of Material Of Any Nature On Truck - Mechanical, Transport Of Material Of Any Nature On Truck 2 Km ≪ Dmt ≪= 5 Km (Within The Urban Perimeter), Manual Drilling Of Auger Type Pile, Including Clearance, Exclusive Frame, Structural Concrete, Transport And Removal Of Excavated Material, Manual Piping At The Bottom Of A Trench With Socket, Excavation Exclusive, Lean Concrete, Mixture 1:3:6, Prepared In A Concrete Mixer, Without Structural Function, Shaping And Unshaping Of Resin Plywood, Reuse (3X) (Foundation), Cutting, Bending And Assembly Of Ca-50/60 Steel, Supply Of Structural Concrete, Pumped Machined, With Fck 25 Mpa, Including Laying, Thickening E, Reuse (3X), Excluding Propping, Pre-Molded Slab, Exposed, Including Capping E = 4 Cm, Sc= 200 Kg/M2, L = 4.00 M, Lintel In Structural Concrete For Spans Above 150Cm, Prepared On Site With Concrete Mixer, Control A, With Fck 20 Mpa, Cast In Situ, Including Frame, Masonry Sealing With Perforated Ceramic Brick, Esp. 9Cm, For Cladding, Including Mortar For Laying, Masonry For Sealing With Ecological Brick, Esp. 10Cm, With Apparent Finish, Including Mortar For Laying, Drywall, Division Between Dry Areas Of The Same Unit (St/St), Esp. 115 Mm, Including Mountings, Guides And Accessories, Exclusive Thermal/Acoustic Insulation, Swallow Gray Granite Partition E = 3 Cm, Including Chromed Brass Hardware, Holed Brick Partition Wall With Height 250Cm, With 16X9cm Pillars Every 250Cm, Reinforced Concrete Footing 30X20cm And Drip Pan, Plastered And Latex Painted, Included
|