|
1. Name And Subject Of The Order: Construction And Equipment Of The Senior Day Home In Wielopole. 2. The Subject Of The Order Includes: 2.1. Preparation Of Design Documentation, Bill Of Quantities, Technical Specifications For The Execution And Acceptance Of Works,2.2. Obtaining Approval Of The Design Documentation In Terms Of Compliance With The Functional And Utility Program,2.3. Obtaining All Legally Required Arrangements, Opinions And Decisions Necessary To Obtain A Permit To Perform Construction Works, 2.4. Obtaining A Decision On A Building Permit And/Or Reporting The Intention To Perform Works On Behalf Of The Ordering Party, Acting On The Basis Of The Granted Power Of Attorney, 2.5. Execution Of Construction Works Specified In The Design Documentation Prepared By The Contractor And Approved By The Ordering Party, 2.6. Submitting All Notifications And Obtaining All Legally Required Arrangements, Acceptances And Decisions Enabling The Commencement Of Use Of The Constructed Facilities And Equipment (Including Decisions On The Use Permit Or Certificates/Information On The Lack Of Objections To The Commencement Of Use Of The Facility). 3. The Scope Of The Contract In The Field Of Construction Works Includes In Particular: 3.1. Construction Of The Building Of The Day Care Home For Seniors With All Necessary Installations Inside And Outside The Building, 3.2. Construction Of The Village Community Center Building With All Necessary Installations Inside And Outside The Building, 3.3. Construction Of A Recreational And Educational Shelter Near The Community Center, Equipped With Electrical Installations, Including Monitoring, 3.4. Construction And Equipment Of An Outdoor Gym With Elements Of Street Work Out And A Playground Equipped With Outdoor Lighting And Monitoring, 3.5. Installation Of Park Benches, Garbage Bins And Information Boards, Bicycle Racks, 3.6. Construction And Reconstruction Of Hardened Surfaces Around Exits, 3.7. Construction Of Technical Infrastructure (Connections, Networks, Devices, Installations, Including A Tight Evaporation Tank For Rainwater And Meltwater As An Element Of The Internal Stormwater Drainage Network), 3.8. Construction Of A Silence Zone Near The Evaporation Tank, In The Form Of A Leveled And Stabilized Surface Made Of Lawn Grids, 3.9. Construction Of Local Hardening Of The Area Constituting Entrances, Driveways, Parking Spaces, Recreational Paths, Fire Route, Etc. 3.10. Preparatory Works: Demolition And Dismantling Of Objects And Devices Colliding With The Investment, Cutting Down Trees And Bushes). 3/11. Reconstruction Of Biologically Active Surfaces And Planting Of Medium And High Greenery Elements, 3.12. Construction Of External Lighting And Cctv Monitoring Installations, 3.13. Delivery And Assembly Of Necessary Devices And Equipment For Designed And Constructed Facilities.4. Characteristic Parameters Determining The Size Of The Facility Or The Scope Of Construction Works (Planned Dimensions And Areas Accord
|