Road Construction Works – Design And Construction Of The S17 Piaski - Hrebenne Expressway, Section Implementation No. 2: Łopiennik Junction (Without The Junction) - Krasnystaw Północ Junction (Without The Junction). The Subject Of The Order Is The Design And Construction Of A Section Of The S17 Expressway On The Piaski - Hrebenne Route. The Beginning Of The Section Was Assumed At Local Km 0+000.00 (In Accordance With The Design Documentation At The Steś Ii Stage With Elements Of The Program Concept For The Project Entitled: Design And Construction Of The S17 Piaski - Hrebenne Expressway, Implementation Section No. 2: Łopiennik Junction (Without The Junction) - Krasnystaw Północ Junction (Without The Junction), And The End At Local Km Approx. 9+235.64. The Above Section Is Located In The Lublin Voivodeship, In The Krasnystaw District, In The Communes Of Łopiennik Górny And Krasnystaw. The Scope Of The Order Includes The Performance Of All Necessary Works For The Proper Functioning Of The Expressway, In Accordance With Applicable Legal Regulations, Standards And Standards (Wis) Of The Minister Responsible For Transport And The Orders Of The General Director Of National Roads And Motorways. Research, Obtain On Behalf Of And On Behalf Of The Ordering Party The Necessary Opinions And Technical Conditions, All Arrangements, Permits, Permits, Decisions And Approvals Necessary For The Execution Of The Contract In Accordance With The Ordering Partys Requirements And The Contract Conditions, Perform Construction Works And Obtain, On Behalf And On Behalf Of The Ordering Party, Decisions On The Use Permit For The Entire Scope Of The Investment. The Order Involves The Performance Of Design Works, Obtaining Decisions Authorizing The Commencement Of Construction Works And Their Implementation In The Scope Of: Expressway, Reconstruction Of Existing Roads In The Scope Of Collision With The Planned Road. Expressway, Construction Of Additional Roadways, Construction Of Technological Strips For The Purpose Of Maintaining The Expressway, Engineering Structures Along The Expressway And Along Roads Intersecting With The Expressway, Culverts, Roads Intended For Pedestrian And Bicycle Traffic, Drainage System Of The Road Body, Drainage Network, Drainage Devices, Relocation Or Reconstruction And Strengthening Of River And Watercourse Beds, Construction Of Environmental Protection Devices, Acoustic Screens, Anti-Glare Screens, Animal Crossings, Related Infrastructure Not Related To The Road, Traffic Organization And Road Safety Devices, Traffic Management System, Road Lighting, Road Fencing, Demolition Works, Cutting Down Trees, Planting Greenery, Preparing The Necessary Documentation And Then Obtaining The Required Decisions Allowing For The Proper Use Of The Subject Of The Order. The Ordering Party Reserves The Obligation For The Contractor To Personally Perform Key Tasks, I.E. The Surface Of The Main Route, Including The Production And Installation, And The Execution Of The Remaining Layers Of The Surface Structure Above The Native Soil (Excavation) Or Embankment (Embankment), With Excluding The Supply Of Materials And Services. In Relation To Key Tasks Reserved For Personal Performance By The Contractor, The Contractor Cannot Rely On The Capabilities Of The Entity Providing The Resources, On The Basis Of
|