|
Lot 1 - Local Administration (According To Tcu 2622/2013 - 3.49% To 8.87%), Lot 1 - Conventional Lease Of Work, Using Template Of Pointed Running Boards Every 2.00M - 2 Uses. Af_03/2024, Lot 1 - Supply And Installation Of Workplate With Galvanized Sheet And Wooden Structure. 360X180cm, Lot 1 - Rental Of Metallic Facade Type Scaffolding, Pieces Approximately 1.20 M Wide And 2.0 M High, Including Diagonals In 6.00 M, Height 2.50 M, With 1 Toilet, For Office, Complete, Without Internal Partitions (Not Including Mobilization/Demobilization), 10/11/2025 - 13:31:41, 10/11/2025 - 13:48:51, 30 X 4. 30 M, For Toilet, With 3 Basins, 4 Showers, 1 Sink And 1 Urinal (Not Included Mobilization/Demobilization), Lot 1 - Demolition Of Holed Block Masonry, Manually, Without Reuse Af_09/2023, Lot 1 - Removal Of Windows, Lot 1 - Demolition Of Simple Concrete Floor, Lot 1 - Excavation. Mechanized For Crowning Block Or Footing With Backhoe (Including Excavation For Placing Formwork Af_01/2024, Lot 1 - Ballast With Granular Material, Applied To Crowning Blocks, Thickness Of *10 Cm*. Af_01/2024, Lot 1 - Manufacturing, Assembly And Dismantling Of Formwork For Crowning Block, In. Lumber, E=25 Mm, 4 Uses. Af_01/2024, Lot 1 - Block Frame Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Lot 1 - Concreting Of Crowning Block Or Baldrame Beam, Fck 30 Mpa, Using A Pump - Laying, Densifying And Finishing. Af_01/2024, Lot 1 - Surface Waterproofing With Asphalt Emulsion, 2 Coats. Af_09/2023, Assembly And Disassembly Of Formwork For Baldrame Beam, Lot 1 - Block Frame, Insulated Footing, Baldrame Beam And Running Footing Using 12.5 Mm Ca-50 Steel - Assembly. Af_01/2024, Lot 1 - Block Frame Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Lot 1 - Ballast With Granular Material (Crushed Stone N.2), Applied To Floors Or Slabs On Ground, Thickness Of *5 Cm*. Ribbed, Ca-60, Q-196, (3, 11 Kg/M2), Wire Diameter = 5, 0 Mm, Width = 2, 45 M, Mesh Spacing = 10 Af_09/2021, Lot 1 - 1:4 Mixture Mortar (In Volume Of Cement And Medium Wet Sand) For Subfloor, Mechanical Preparation With 400 L Concrete Mixer. Af_08/2019, Lot 1 - Assembly And Disassembly Of Rectangular Pillar Formwork And Similar Structures, Simple Right Foot, 4 Uses. Af_09/2020, Lot 1 - Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 12.5 Mm Ca-50 Steel - Assembly. Af_06/2022, Lot 1 - Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 5.0 Mm Ca-60 Steel - Assembly. Lot 1 - Concreting Of Pillars, Fck = 25 Mpa, Densification And Finishing Af_02/2022_Ps, Lot 1 - Frame Of Pillar Or Beam Of Conventional Reinforced Concrete Structure Using 10 Ca-50 Steel, Lot 1 - Concreting Of Beams And Slabs, Fck=25 Mpa, For Solid Or Ribbed Slabs In Use Of Pump - Launching, Thickening And Finishing.Af_ 02/2022_Ps, Lot 1 - Unidirectional Precast Slab, Bi-Supported, Ceramic Filling, Conventional Joist, Total Slab Height (Filling+Cover) = (8+6), C25 Concrete - Armadu
|