Heating, Ventilation And Air-Conditioning Installation Work – Kgr 410 Wastewater, Water, Gas Systems. The Existing Buildings Are Two Identical Mur Small Schools (Mobile Teaching Units). These Are Assigned To The Konrad Wachsmann School. Both Mur Buildings Were Built As Three-Story Buildings With No Basement Between 1993 And 1995. The Approximate Dimensions Of The H-Shaped Floor Plans Are Each Approx. 27.34 X 23.42 M. The Construction Was Carried Out Using Prefabricated Construction, Consisting Of Wall Panels And Ceiling Panels In Large Panel Construction. The Mur Buildings Are Accessible Via The West Facades. The Main Entrance Takes You Directly To The Respective Stairwell. The Stairwell Accesses The Ground Floor, The 1St Floor And The 2Nd Floor. The Rooms On Each Level Are Accessed Via Large Corridors. The Surrounding Walls Of The Stairwells And The Flights Of Stairs Are Solid. All Existing Drinking (Cold, Warm, Circulation) As Well As Dirty Water Pipes And Sanitary Objects In The Components To Be Renovated Will Be Dismantled. Drainage Takes Place In The Separation System. An External Rain Drainage System Will Be Installed On Site. The Interface To The San Civil Engineering Trade Is The Connection To The Underground Pipes/Standpipe. The Existing Internal Rw Drainage System Will Be Completely Dismantled And An External Rw Drainage System Will Be Installed On Site. All Dirty Water Pipes Will Be Laid According To The Location Of The New Furnishings. For This Purpose, The Underground Wastewater Lifting System For Building Part No. 11 Must Be Renewed And The Sw Underground Pipes Below The Floor Slab Must Be Upgraded With Inliners. In The Outdoor Area, The Dirty Water Underground Pipes Will Be Replaced With Inspection/Cleaning Shafts Up To The Berlin Wasserbetriebe House Box/Transfer Shaft. The Rw House Connection And Transfer Shaft Remains Intact Even After The Infiltration System Has Been Constructed And Is Used As A Throttle Inlet. The Sanitary Equipment Is Carried Out In Accordance With The “Guidelines For The Renovation Of Schools” And In Accordance With The Standards Of Public Building Or The Clients Specifications. A Din Dvgw-Tested Stainless Steel Pipe System With Press Fittings Is Used For The Irrigation Pipes. The Tw Connection Is Made To The Respective Existing Earth Lines In The Ha Rooms In Mur 11 And 13. The Supply Comes From The Central Tw-Ha In The Main School Building. On The Ground Floor, The Further Laying Of The Pipe Installations Takes Place At The Height Of The Standard Openings And The Existing Routes. The Social Rooms Will Have Suspended Ceilings In Accordance With The Architects Plans. New Toilet Rooms Will Be Built For Students And Staff. A New Teaching Kitchen Is Also Being Built In Mur 11. An Outdoor Tap Point For The Outdoor Area Is Planned At The Mur 11 Building In The School Garden Area Or In The Teaching Kitchen Building. Otherwise, The Removal Takes Place From The Floor-Flush Technical Rooms With External Access. A Teaching Kitchen Will Be Built On The Ground Floor Of House 11. Four Teaching Routes Are Planned For This Purpose.
Contact Information
Address
Marzahn-Hellersdorf 12591 Berlin
Contact No.
000
Email
zv.marzahn-hellersdorf@vergabeberlin.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 104321059
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.