|
Construction Work – Construction Of A Swimming Pool With The Necessary Infrastructure In Olsztyn – Stage Ii And Stage Iii. 1. The Subject Of The Order Is: Construction Of A Swimming Pool With The Necessary Infrastructure In Olsztyn - Stage Ii And Stage Iii 2. The Scope Of Construction Works To Be Performed Within Stage Ii And Iii Of The Task Includes, Among Others: - Construction Of Connections To The Building - Water And Sewage, Gas, Electricity Connection; - Construction Of An Internal Gas Installation, - Construction Of A Retaining Wall - The Scope Of The Retaining Wall Is Shown In The Attached Map Of Stage I - Execution Of Construction Works Related To The Installation Of Internal Sanitary And Electrical Installations, - Construction Of A Rainwater Tank, - Delivery And Installation Of Stainless Steel Swimming Pool Basins, - Delivery And Installation Of Three Pieces Of Jacuzzi Bathtubs Along With The Installation, - Delivery And Installation Of Swimming Pool Water Treatment Technology, - Construction Of A Parking Lot, Internal Road, - Construction Of A Ramp Driveway To The Basement, - Finishing Works On Floors, Walls And Ceilings, Suspended Ceilings, Acoustic Panels; - Finishing The External Façade Of The Building, - Carrying Out Outdoor Construction Works, I.E. Construction Of External Rainwater Drainage Systems, Construction Of A Parking Lot, Sidewalks, Waste Collection Area, Construction Of A Covered Space For Bicycles, Electric Scooters, Leveling The Area, Sowing Grass, Planting Ornamental Plants, Installation Of The Indoor Swimming Pool In Olsztyn Sign Above The Main Entrance To The Building In The Form Of Illuminated 3D Letters, Installation Of Esok; - Equipping The Building With The Necessary Equipment In Accordance With The Purpose Of The Rooms, Enabling The Proper Functioning Of The Building; - Training Of Employees In The Proper Operation Of The Facility, In Particular In The Operation Of Swimming Pool Water Treatment Technology, Cogeneration System, Etc. Note The Subject Of The Order Does Not Include: - Construction Of The Shell Of The Indoor Swimming Pool Building (Stage I - Completed Shell Shell Not Covered By The Subject Of The Order), - Delivery And Installation Of Wellness Zone Equipment. Execution And Delivery Of Stainless Steel Swimming Pool Basins Along With Workshop Drawings Of Their Assembly And Agree On The Study With The Ordering Party - The Ordering Party Informs That In The Scope Of Stage Ii Of The Construction Works, The Contractor Is Obliged To Familiarize Himself With The Completed Elements Of The Completed Works Construction. The Ordering Party Allows The Contractor To Remove The Effects Of The Construction Works Referred To Above And Re-Perform Them By The Contractor. In Such Case, The Dismantling And Re-Execution Of The Construction Works Will Be Carried Out Within The Framework Of The Remuneration Referred To In §7, Section 1 Of The Annex No. 12 To The Swz And Within The Deadline Referred To In §2 Storey
|