|
Tenders are invited for Development and Asphaltization Works on the rn2, Mbanga - Lualaba River Section (206.5 Km) in 2x2 Lane with Reservation of Fiber Optic and Electrical Energy Infractures. Lot 1: Section Mbanga (PK 0+000) Maloba (100 km), including the construction of a 153 m long bridge over the Lomami River, with an execution period of 36 months. The main works to be carried out under Lot 1 are: i. Site installation ii. Earthworks (embankments and cuttings): 2,593,516 m³ iii. Natural gravel for foundation layer: 608,650 m³ iv. Crushed gravel or soil-cement for base layer: 473,420 m³ v. Bituminous concrete for the wearing course: 110,270 m³ vi. Concrete for engineering and drainage structures: 11,573 m³ vii. Reinforcing steel for reinforced concrete: 1,315,383 kg viii. Length of masonry-lined ditches: 128,700 m ix. Length of culverts: 2,000 m x. Length of bored piles with a diameter of 100 cm: 3,000 m Lot 2: Section Maloba (PK100+000) Lualaba River (PK 205+700), with an execution period of 36 months. The main works to be carried out under Lot 2 are: i. Site installation ii. Earthworks (embankments and cuttings): 2,772,993 m³ iii. Natural gravel for foundation layer: 630,758 m³ iv. Crushed gravel or soil-cement for base layer: 490,301 m³ v. Bituminous concrete for the wearing course: 114,033 m³ vi. Concrete for engineering and drainage structures: 17,350 m³ vii. Reinforcing steel for reinforced concrete: 1,945,761 kg viii. Length of masonry-lined ditches: 135,980 m ix. Length of culverts: 2,200 m x. Length of bored piles with a diameter of 100 cm: 3,770 m Lot 3: Bridge of 714 m in length over the Lualaba River (PK 205+700 PK 206+500), with an execution period of 24 months. The main works to be carried out under Lot 3 are: i. Site installation ii. Earthworks (embankments and cuttings): 24,511 m³ iii. Natural gravel for foundation layer: 560 m³ iv. Crushed gravel or soil-cement for base layer: 448 m³ v. Bituminous concrete for the wearing course: 112 m³ vi. Concrete for engineering structures: 18,277 m³ vii. Reinforcing steel for reinforced concrete: 2,305,398 kg viii. Length of bored piles with a diameter of 100 cm: 7,000 m ix. Steel for metal framework: 3,153,429 kg [Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.] Tender Link : http://celluleinfra.org/index.php/appel-d-offres/offres-en-cours
|