Cutting The Vegetation Layer With A Bulldozer, 1 Group Of Gr., To Add, Excavating 1.25 M3 Of 2 G Of Soil With An Excavator And Loading It Into Dump Trucks., Dump Truck, 20 T Transport Distance - 3 Km. 1St Class Cargo, Execution Of Works At The Site Of Soil Spillage, Soil Group: 2-3, 1.25 M3 Of 2 G Of Soil Should Be Excavated With An Excavator And Thrown Aside, , Pressing 2-Gr Of Soil With A Bulldozer To A Distance Of 10 M., Add (Extra 30M), Excavating 1.25 M3 Of 3 G Of Soil With An Excavator And Loading It Into Dump Trucks., 1.25 M3 Of 3 G Of Soil Should Be Excavated With An Excavator And Thrown Aside, Bulldozer 3Rd Group Earth Pressure. 10M Away, Add (Additional 20 M), Compaction Of The Soil With Soil Compactors With Free-Falling Plates, The Thickness Of The Compacted Layer: 50 Cm (The Bottom Of The Pond Tank V=26254, 8 M3 Of Water Supply Through A Pipe, The Working Time Of The Pump Is 120 Mash-Hours, The Area Of The Bottom Of The Tank S=23400 M2)
Contact Information
Contact Person
Yusif Hüseynov
Address
Bakı şəhəri, Moskva prospekti 69a
Contact No.
+994 55 225 12 31
Email
yusif.huseynov@toom.gov.az
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 103571535
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.