|
1. The Subject Of The Order Is The Delivery Of A Tent Hall With Dimensions Of 20.00 X 30.00 M, Including Assembly At The Municipal Stadium In Ropczyce, At Ul. Mickiewicza 56.2. The Scope Of The Order Includes: 1/ Delivery Of A Tent Hall With The Following Properties: A) Dimensions Of The Hall In Plan: 20.00X30.00 M, B) Height Of The Halls Side Wall: Min. 3.50 M,C) Gable Roof, Roof Slope Inclination Approx. 22°,D) Hall Structural Elements (Columns, Transoms, Purlins) Made Of Aluminum And Steel,E) Hot-Dip Galvanized Steel Connectors, Hall Bracing Elements, Ties, Struts, Tension Profiles, Roof Tensioners, Steel,F) Assembly Pins Made Of Fi 25 Rod Ribbed; Or Other Assembly System Allowing The Hall Structure To Be Secured On An Asphalt Or Concrete Surface, G) Roof And Wall Covering Made Of White Pvc Material With A Grammage Of 680 G/M2 With A Flame Retardancy Certificate F4900 Broof (T1) En 13501-5 Or Equivalent, H) Two Curtain-Type Sliding Gates Constituting Part Of The Covering, With Dimensions Approx. 4.90 X 2.70 M (Width X Height) Each, I) Must Meet Applicable Regulations Regarding Safety Of Construction And Use, Fire Protection, Hygienic And Sanitary Requirements, Ergonomics, Energy Efficiency, Occupational Health And Safety And Other Requirements Required For This Type Of Facilities, 2/ Providing Documentation Confirming The Facilitys Compliance With Applicable Regulations And Approval For Use, Including Declarations, Approvals And Certificates.3/ Providing Instructions For Assembly, Disassembly, Use, And Operating Conditions Prepared In Polish (Including, For Example, Indication Of The Permissible Maximum Thickness Of The Snow Layer On The Roof).4/ Preparation Of A Technical Design Of The Hall Along With The Designers Declaration On The Preparation Of A Technical Design Regarding The Construction Project In Accordance With Applicable Regulations, Principles Of Technical Knowledge, Etc., And A Statement That The Facility Does Not Will Pose A Threat To The Safety Of People Or Property.5/ Preparation Of Documentation Necessary For Reporting Under Art. 29 Section 1 Point 7 Of The Construction Law (Consolidated Text: Journal Of Laws Of 2024, Item 725) Of The Intention To Build A Building That Does Not Require A Building Permit And For The Implementation Consisting In The Construction Of A Temporary Tent Hall With Dimensions Of 20.0 X 30.0 M On The Plot With Registration Number 1893/3 In Ropczyce.6/ First Assembly Of The Tent Hall Along With User Training In This Regard.7/ First Dismantling Of The Hall Tent Along With User Training In This Regard - Until March 15, 2026.3. The Ordering Party Has A Paved Area With An Area Adapted To The Dimensions Of The Hall, Along With The Necessary Supplies For Assembly And A Place For Unloading From The Trailer And Assembly Of The Halls Elements On The Square.4. Place Of Installation Of The Tent Hall: Paved Area (Asphalt Surface) Below The Field Stand At The Municipal Stadium In Ropczyce At Ul. Mickiewicza 56. The S
|