|
Lot 1 - Provisional Water And Sewer Connection, Lot 1 - Provisional Energy Input, Lot 1 - Supply And Installation Of Galvanized Slate Plate And Wood Structure. Af_03/2022_Ps, Lot 1 - Shop With Wood Plywood. Af_03/2024, Lot 1 - Container Late 2, 30 X 4, 30 M, Alt. 2, 50 M, For Sanitary, With 3 Basins, 4 Showers, 1 Washbag And 1 Mictorio (Does Not Include Mobilization/Demobilization), 09/23/2025, 30 X 6.00 M, Without Internal Partitions (Not To Sanitary Mobilization/Demobilization), Lot 1 - Container Warehouse, 2, 40 X 6, Simple Standard, Without Coating And Without Internal Partitions And Without Sanitary, For Use In Construction Site, Lot 1 - Conventional Work Lease, Using Pimped Running Board Jigs Every 2, 00M - 2 Uses. Af_03/2024, Lot 1 - Mechanized Cleaning Of Vegetable Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0, 20 M), With Treadmill Tractor. Af_03/2024, Lot 1 - Ornamental Tree Planting With A Change Height Greater Than 2.00 M And Less Than Or Equal To 4.00 M. Af_07/2024, Lot 1 - Tree Cut And Tree Clipping With Trunk Diameter Greater Than Or Equal To 0, 20 M And Less Than 0, 40 M. Af_03/2024, Lot 1 - Removal Of Reminiscent Tree Trunk With Diameter Greater Than Or Equal To 0, 40 M And Less Than 0, 60 M. Af_03/2024, Lot 1 - Loading, Maneuver And Discharge Tulk 10 M - Hydraulic Excavator Load (0, 08 M / 111 Hp) And Free Discharge (Unit M3). Af_07/2020, Lot 1 - Transport With 10 M Tilting Truck, In Paved Urban Road, Dmt Up To 30 Km (M3xkm Unit). Af_07/2020, Lot 1 - Local Administration, Lot 1 - Horizontal Excavation On 1St Category Soil With Treadmill Tractor (170Hp/Blade 5, 20M3). Af_07/2020, Lot 1 - Execution And Compaction Of Landfill Body (95 Energy Of The Normal Proctor) With Predominantly Sandy Soil 15Cm Thickness - Exclusive Material, Excavation, Load And Transport. Af_09/2024, Lot 1 - Mechanized Excavation For Crowning Block Or Shoe With Backhoe (Including Excavation For Molding). Af_01/2024, Lot 1 - Mechanized Excavation For Baldrame Beam Or Shoe Running With Mini -Slave (Including Excavation For Molding). Af_01/2024, Lot 1 - Background Preparation With Width Less Than 1, 5 M (Natural Soil Hit). Af_08/2020, Lot 1 - Manual Ditches, With Percussion Soil Compactor. Af_08/2023, Lot 1 - Fabrication, Assembly And Disassembly Of Crown Block, Sawed Wood, E25 Mm, 4 Uses. Af_01/2024, Mounting And Disassembly Of Baldrame Beam, Lot 1 - Block Frame Using 5 Mm Ca -60 Steel - Assembly. Af_01/2024, Lot 1 - Block Frame Using 6, 3 Mm - Assembly Ca -50 Steel. Af_01/2024, Lot 1 - Block Frame Using 8 Mm Ca -50 Steel - Assembly. Af_01/2024, Lot 1 - Block Frame Using 10 Mm Ca -50 Steel - Assembly. Af_01/2024, Lot 1 - Assembly Of Cross -Section Piles, Diameter 5, 0 Mm. Af_09/2021_Ps, Diameter 6, 30 Mm. Af_09/2021_Ps, Lot 1 - Pile Armor Assembly, Diameter 10, 12, 5 Mm. Af_09/2021_Ps, Lot 1 - Isolated Shoe Frame, Baldrame Beam And Shoe Running Using 5 Mm Ca -60 Steel - Assembly. Af_01/2024, Baldrame Beam And Shoe Running Using 6 Ca-50 Steel, Baldrame Beam And Running Shoe Using 8 Mm Ca-50 Steel-Assembly. Af_01/2024, Baldrame And Sa Beam
|