Quotation are invited for Replacement of Control Panel and Water Pump Systems at Dewa Various Locations. REPLACEMNT OF DAMAGED PUNPS AS PER ATTACHED SPECIFICATION AT RUWAYAHGARAGE# DEWA-CONFIDENTIALJOB SPECIFICATION # REPLACEMENT OF CON TROL PANEL AND WATER PUMP SYSTEMSAT DEWA VARIOUS LOCATIONS1.GENERALTHIS SCOPE OF WORK OUTLINES THE REQUIREMENTS FOR THE REPLACEMENT, CONTROL PANEL MODIFICATION, AND RE-COMMISSIONING OF WATER PUMP SYSTEMSAT MULTIPLE DEWA FACILITIES. THE WORKS AIM TO ENSURE UNINTERRU PTED WATERSUPPLY, RESTORE FULL FUNCTIONALITY, AND OPTIMIZE PUMP SYSTEM OPERATIONSIN LINE WITH DEWA MAINTENANCE STANDARDS.2.INTRODUCT IONTHE OBJECTIVE IS TO:#REPLACE TWO DAMAGED GRUNDFOS PUMPS AT DEWA RUWAYAH GARAGE.#MODIFY THE PUMP CONTROL PANELS AT THREE (3) DEWA LOCATIONS, CONVERTINGCONTROLLOGIC FROM PLC WITH TRANSDUCER OPERATION TO PRESSURE SWITCHOPERATION FOR IMPROVEDRELIABILITY AND SIMPLIF IED OPERATION.3.SCOPE OF WORK3.1 LOCATION 1: DEWA RUWAYAH GARAGEEQUIPMENT: GRUNDFOS WATER PUMP SCOPE:#DISCONNECT AND REMOVE THE TWO DAMAGED PUMPS.#SUPPLY AND INSTALL NEW GRUNDFOS PUMPS WITH MATCHING SPECIFICATIONS.#RECONNECT EXISTING PIPING, ELECTRICAL WIRING, AND MOUNTINGS.#PERFORM ALIGNMENT, INSULATION RESISTANCE TESTING, AND FULL FUNCTIONALTESTING.PUMP SPECIFICATION:#MOTOR POWER: 5.8 KW#QUA NTITY: 2 NOS#ENCLOSURE: IP55 OR HIGHER#BRAND: GRUNDFOS (SAME OR APPROVED EQUIVALENT)DEWA-CONFIDENTIAL3.2 LOCATION 2: DEWA COMPLEX MO SQUEEQUIPMENT: WATER BOOSTER PUMP SET SCOPE:# MODIFY EXISTING CONTROL PANEL.# REMOVE PLC AND TRANSDUCER-BASED CONTROL SYSTEM.# INSTA LL NEW PRESSURE SWITCH-BASED OPERATION LOGIC.# TEST AND CALIBRATE FOR OPTIMAL PRESSURE CUT-IN/CUT-OUT RANGE.# ENSURE PROTECTION FEAT URES (OVERLOAD, DRY RUN, PHASE FAILURE) REMAINFUNCTIONAL.3.3 LOCATION 3: STAFF ACCOMMODATION # FAMILY BLOCKEQUIPMENT: WATER BOOSTER PUMP SET SCOPE:# MODIFY CONTROL PANEL AS FOLLOWS: A) CONVERT FROM PLC TRANSDUCERCONTROL TO PRESSURE SWITCH OPERATION. B) RECONFIGURE PANEL LOGIC TOENABLE #BOOSTER TO TRANSFER PUMP# TRANSFORMATION.# REPLACE OR REWIRE INTERNAL COMPONENTS AS REQUIRED FOR NEW OPERATIO NMODE.# VALIDATE OPERATION SEQUENCE AND PROTECTION FEATURES.3.4 LOCATION 4: STAFF ACCOMMODATION # BACHELOR BLOCKEQUIPMENT: WATER BOO STER PUMP SET SCOPE:# MODIFY THE CONTROL PANEL FROM PLC WITH TRANSDUCER LOGIC TO PRESSURESWITCH-BASED OPERATION. Qty: 2 MODIFY EXISTING CONTROL PANEL AS PER ATTACHED SPECIFICATION AT DEWACOMPLEX MOSQUE# Qty: 1 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2412501508)/$value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 102283807
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.