|
Lot 1 - Supply And Installation Of Workplate With Galvanized Plate And Wood Structure. Af_03 / 2022_Ps, Lot 1 - Mobilization / Demobilibilization Of Singeer, Lot 1 - Metallic Scaffolding Type Fachadeiro, Approximately 1, 20 M Width And 2, Including Diagonals In X, Connection Bars, Shoes And Other Items Needed To Assemble (Not Installation), Lot 1 - Mounting And Disassembly Fachairo, With Metal Floor, For Buildings With Multiple Floors (Exclusive Scaffolding And Cleaning). Af_03/2024, Lot 1 - Container Late 2, 30 X 6, 00 M, Alt. 2, 50 M, With 1 Sanitario, For Office, Complete, Without Internal Partitions (Not Included Mobilization/Demobilization), 19/09/2025, 30 X 4, 30 M, To Sanitary, W/5 Basins, 1 Lavatorus And 4 Mictorios Mobilization/Demobilization), For Sanitary, With 3 Basins, 4 Showers, 1 Laundry And 1 Mictorio (Does Not Include Mobilization/Demobilization), Lot 1 - Polyethylene Water Box, 3000 Liters - Supply And Installation. Af_06/2021, Lot 1 - Circular Septic Tank, In Precast Concrete, Internal Diameter 1, 10 M, Internal Height 2, Useful Volume 2138, 2 L (For 5 Contributors). Af_12/2020, Lot 1 - Water Measurement Easel Kit - Individualized Entry, In Cpvc Dn 28 Mm (1), For 1 Meter - Supply And Installation (Exclusive Hydrometer). Af_03/2024, Lot 1 - Electric, Air, Three -Phase, With Built -In Box, 10 Mm2 Cable And Din 50A Circuit Breaker (Not Included The Concrete Pole). Af_07/2020, Lot 1 - Fiber Glass Guardhouse 1, 05 X 1, 05 X 2, 20M Sbc, Lot 1 - Wood Plates, With 04 Modules, With Dimensions Of 3, 00 X 3, 00M Each, Hútil0, 90, Intended For Storage Of Solid Waste Classes 1, 2, 3, 4, Lot 1 - Lot 1 - Lot 1 - Lot 1 - Lot 1 - Lot 1 - Lot 1 Water And Sewage Monthly Consumption, Lot 1 - Local Administration, Lot 1 - Art, Lot 1 - Demolition / Waste Management Program, Lot 1 - Vegetation Cover Report (Suppression), Lot 1 - Project As Built, Lot 1 - Use, Maintenance And Operation Manual, Lot 1 - Window Removal, Manually, Without Reuse. Af_09/2023, Lot 1 - Demolition Of Pierced Block Masonry, Lot 1 - Removal Of Metal And Ceramic Fiber Cement Tiles, Lot 1 - Wooden Plot Removal For Roofing, Lot 1 - Ceramic Coating Demolition, Lot 1 - Manual Cleansing On Hoeed Ground. Af_03/2024, Lot 1 - Tree Cut And Tree Clipping With Trunk Diameter Greater Than Or Equal To 0, 40 M And Less Than 0, 60 M. Af_03/2024, Lot 1 - Load, Maneuver And Discharge In Tick Truck 6 M - Hydraulic Excavator Load (0, 08 M/111 Hp) And Free Discharge (M3). Af_07/2020, Lot 1 - Demolition Of Slabs, In Reinforced Concrete, Mechanized With Hammer, Lot 1 - Transport With 6 M Tilting Truck, In Paved Urban Road, Dmt Up To 30 Km (M3xkm Unit). Af_07/2020, Lot 1 - Demolition And Transportation Of Existing Metal Reservoir, Lot 1 - Conventional Lease Of Work, Using Pimped Running Board Template Every 2.00M - 2 Uses. Af_03/2024, Lot 1 - Manual Excavation For Crowning Block Or Shoe (Including Excavation For Formal Placement). Af_01/2024, Lot 1 - Skinny Concrete Ballast, Applied To Crown Blocks Or Shoes. Af_01/2024, Lot 1 - Shoe Concreting, Fck 30 Mpa, Using Jerica - Launch, Densification And Finishing. Af_01/2024, Lot
|