We have identified 61 global wet mix macadam tenders from the public procurement domain worldwide. View the latest global tenders for wet mix macadam from Africa, the Americas, Asia, Australia, Europe, the Middle East, and other countries. Find global tender information, RFPs, RFQs, ICBs, bidding contracts, and invitations to bid for wet mix macadam tenders published by various government departments, the World Bank, the United Nations, multilateral funding agencies, military, defense, and private companies across the world.
Tender For Providing And Laying, Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam (Wmm) Specification Including Premixing The Material With Water At Omc In Mechanical Mix Plant Carriage To Mixed Material By Tipper To Site Laying In
Tender For Earth Work Excavation For Foundation In Hard Stiff Clay, Stiff Black Cotton, Hard Red Earth, Shales Murram, Gravel,Stoney Earth And Earth Mixed With Small Size Boulders Ss.20B And Sand, Silt Or Other Loose Soil, Wet Sand,Or Silt Not Under
Tender For Earth Work Excavation For Foundation In Hard Stiff Clay, Stiff Black Cotton, Hard Red Earth, Shales Murram, Gravel,Stoney Earth And Earth Mixed With Small Size Boulders Ss.20B And Sand, Silt Or Other Loose Soil, Wet Sand,Or Silt Not Under
Tender For Providing And Laying, Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam (Wmm) Specification Including Premixing The Material With Water At Omc In Mechanical Mix Plant Carriage To Mixed Material By Tipper To Site Laying In
Tender For Earth Work Excavation And Deposting On Bank With An Intial Lead Of 10M& Initial Liftm Of 2M In Hard Siff Clay , Stiff Black Cotton , Hard Red Earth Shales , Murram , Gravel, Stoney Earth And Earth Mixed With Small Size Boulders And Hard
Tender For Earth Work Excavation For Foundation In Hard Stiff Clay, Stiff Black Cotton, Hard Red Earth, Shales Murram, Gravel,Stoney Earth And Earth Mixed With Small Size Boulders Ss.20B And Sand, Silt Or Other Loose Soil, Wet Sand,Or Silt Not Under
Tender For Advance Patch Work 45Mm Providing Advancve Patch Work Using 50Mm Consolidated Thickness By Using 1 M3 Of 45Mm Irc Metal With 44Kg Of Bittumen Per 1 M3 Of Metal For Pre Mixing For Existing Surface Advance Patch Work Including Cost And Conv
Tender For Earth Work Excavation For Foundation In Hard Stiff Clay, Stiff Black Cotton, Hard Red Earth, Shales Murram, Gravel,Stoney Earth And Earth Mixed With Small Size Boulders Ss.20B And Sand, Silt Or Other Loose Soil, Wet Sand,Or Silt Not Under
Tender For Earth Work Excavation And Deposting On Bank With An Intial Lead Of 10M& Initial Liftm Of 2M In Hard Siff Clay , Stiff Black Cotton , Hard Red Earth Shales , Murram , Gravel, Stoney Earth And Earth Mixed With Small Size Boulders And Hard
Tender For Earth Work Excavation For Foundation In Hard Stiff Clay, Stiff Black Cotton, Hard Red Earth, Shales Murram, Gravel,Stoney Earth And Earth Mixed With Small Size Boulders Ss.20B And Sand, Silt Or Other Loose Soil, Wet Sand,Or Silt Not Under