Operation, Maintenance And Upkeep Of The 6 Mld Water Supply Scheme & Associated Electromechanical Equipment And Routine And Preventive Maintenance Of Dg Sets, Pumps & Motors And Water Distribution Network Of Kinfra Hi-Tech Park, Kalamassery For A Period Of3 Years.- 1 Part -Aengaging Qualified, Experienced Plant Operator ( Wtp ) 1Each / Shift ( Male ) - ( Total - 1 Shift Per Day ) 2 First Year 3 Second Year 4 Thrid Year 5 Engaging Qualified, Experienced Pump Operator – For Intake Well Site– 1 Each / Shift ( Men ) - 1 Shift / Day 6 First Year 7 Second Year 8 Thrid Year 9 Engaging Qualified, Experienced Helpers ( Male ) – For Wtp 1 Each / Shift ( Men ) - 1 Shifts Perday 10 First Year 11 Second Year 12 Thrid Year 13 Sweepersforsweeping Andcleaningoffloors, Walls, Roofsetcofwtp. ( Half Day ) 14 First Year 15 Second Year 16 Thrid Year 17 Engaging Qualified, Experienced Chemist ( Wtp - Hi-Tech ) 18 First Year 19 Second Year 20 Thrid Year 21 Engaging Qualified, Experienced Pipeline Fitter For Intake Well Site & Wtp ( Men ) 22 First Year 23 Second Year 24 Thrid Year 25 Engaging Qualified Experienced Electrician For Electrical Repair Works ( Men ) 26 First Year 27 Second Year 28 Thrid Year 29 Engaging Qualified, Experienced Plumber / Fitter - Foro & M Activities At Hi-Tech, Wss ( Men ) 30 First Year 31 Second Year 32 Thrid Year 33 Engagingmen Labourers As And When Required For Work Such As Dewatering Trenches Manually , Cleaning Water Weeds In Water Bodies Infront Of Intakes Etc, And Miscellaneousworkas Per The Directions Of Kinfra Hi-Tech Park. 34 First Year 35 Second Year 36 Thrid Year 37 Part- Blifting And Carefully Removing Rcc / Heavy Duty Ci Cover Slabs Of Manhole Chambers For Sluice Valves, Air Valves, Scour Valves Etc. Of The Pipelines Removing The Silt Deposit, If Any, Includingcleaning The Body Of The Valves Chamber Etc. And Replacing The Rcc Cover Slabs After The Work Carefully Without Any Damage Including Seating The Slabs In Cm 1:5 To Lines And Levels Etc. 38 First Year 39 Second Year 40 Thrid Year 41 Earth Work Excavation By Mechanical Means ( Hydraulic Excavator ) / Manual Means In Foundation Trenches Or Drains ( Not Exceeding 1.5M In Width Or 10 Sqm Or On Plan ) , Including Dressing Of Sides And Ramming Of Bottoms, Lift Upto 1.5M , Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed, Within A Lead Of 50 M.All Kinds Of Soil 42 First Year 43 Second Year 44 Thrid Year 45 Filling Available Excavated Earth ( Excluding Rock ) In Trenches, Plinth, Sides Of Foundations Etc. In Layers Not Exceeding 20 Cm In Depth, Consolidating Each Deposited Layer By Ramming And Watering, Lead Up To 50 M And Lift Up To 1.5 M. 46 First Year 47 Second Year 48 Thrid Year 49 Filling With Contractors Own Gravelly Soil / Sandincluding Loading, Unloading, And Stacking For Measurements And Filling In Trenches, Plinth, Sides Of Foundations Etc. In Layers Not Exceeding 20 Cm In Depth, Consolidating Each Deposited Layer By Ramming And Watering, Lead Up To 50 M And Lift Up To 1.5 M. 50 First Year 51 Second Year 52 Thrid Year 53 Cutting Tarred Surface Of The Road And Disposal Of Debris As Per Direction Of Kinfra Hi-Tech Park 54 First Year 55 Second Year 56 Thrid Year 57 Cuttingdi Pipes Perpendicular To The Axis Of The Pipe In Trenches Using Di Pipe Cutters Wherever Required Without Causing Damages To The Pipe For 350Mm Di 58 First Year 59 Second Year 60 Thrid Year 61 Cuttingdi Pipes Perpendicular To The Axis Of The Pipe In Trenches Using Di Pipe Cutters Wherever Required Without Causing Damages To The Pipe For 300Mm Di 62 First Year 63 Second Year 64 Thrid Year 65 Cuttingdi Pipes Perpendicular To The Axis Of The Pipe In Trenches Using Di Pipe Cutters Wherever Required Without Causing Damages To The Pipe For250 Mm Di 66 First Year 67 Second Year 68 Thrid Year 69 Cuttingdi Pipes Perpendicular To The Axis Of The Pipe In Trenches Using Di Pipe Cutters Wherever Required Without Causing Damages To The Pipe For 200Mm Di 70 First Year 71 Second Year 72 Thrid Year 73 Cuttingdi Pipes Perpendicular To The Axis Of The Pipe In Trenches Using Di Pipe Cutters Wherever Required Without Causing Damages To The Pipe For 150Mm Di 74 First Year 75 Second Year 76 Thrid Year 77 Dismantling The Damagedd.I. / C.I Pipes After Taking Out The Pipes Manually / Mechanical Means Breaking Lead Caulked Joints / Removing And Stacking Rubber Rings As The Case May Be Of Pipes And Specials At Site Within 50 M Lead As Per The Direction Of Engineer In Chargefor 350Mm Di 78 First Year 79 Second Year 80 Thrid Year 81 Dismantling The Damagedd.I. / C.I Pipes After Taking Out The Pipes Manually / Mechanical Means Breaking Lead Caulked Joints / Removing And Stacking Rubber Rings As The Case May Be Of Pipes And Specials At Site Within 50 M Lead As Per The Direction Of Engineer In Chargefor 300Mm Di 82 First Year 83 Second Year 84 Thrid Year 85 Dismantling The Damagedd.I. / C.I Pipes After Taking Out The Pipes Manually / Mechanical Means Breaking Lead Caulked Joints / Removing And Stacking Rubber Rings As The Case May Be Of Pipes And Specials At Site Within 50 M Lead As Per The Direction Of Engineer In Chargefor 250 Mm Di 86 First Year 87 Second Year 88 Thrid Year 89 Dismantling The Damagedd.I. / C.I Pipes After Taking Out The Pipes Manually / Mechanical Means Breaking Lead Caulked Joints / Removing And Stacking Rubber Rings As The Case May Be Of Pipes And Specials At Site Within 50 M Lead As Per The Direction Of Engineer In Chargefor 200Mm Di 90 First Year 91 Second Year 92 Thrid Year 93 Dismantling The Damagedd.I. / C.I Pipes After Taking Out The Pipes Manually / Mechanical Means Breaking Lead Caulked Joints / Removing And Stacking Rubber Rings As The Case May Be Of Pipes And Specials At Site Within 50 M Lead As Per The Direction Of Engineer In Chargefor 150Mm Di 94 First Year 95 Second Year 96 Thrid Year 97 Laying S&S Centrifugally Cast ( Spun ) / Ductile Iron Pipes Conforming To Is: 8329 ( Excluding Cost Of Pipe ) For 350Mm Di 98 First Year 99 Second Year 100 Thrid Year 101 Laying S&S Centrifugally Cast ( Spun ) / Ductile Iron Pipes Conforming To Is: 8329 ( Excluding Cost Of Pipe ) For 300Mm Di 102 First Year 103 Second Year 104 Thrid Year 105 Laying S&S Centrifugally Cast ( Spun ) / Ductile Iron Pipes Conforming To Is: 8329 ( Excluding Cost Of Pipe ) For 250 Mm Di 106 First Year 107 Second Year 108 Thrid Year 109 Laying S&S Centrifugally Cast ( Spun ) / Ductile Iron Pipes Conforming To Is: 8329 ( Excluding Cost Of Pipe ) For 200Mm Di 110 First Year 111 Second Year 112 Thrid Year 113 Laying S&S Centrifugally Cast ( Spun ) / Ductile Iron Pipes Conforming To Is: 8329 ( Excluding Cost Of Pipe ) ) For 150Mm Di 114 First Year 115 Second Year 116 Thrid Year 117 Provindingjoints To Centrfuifugallydi Pipes Including Testing Of Jointsby Providing Lead Caulked Joints To Spun Iron Or C.I. Pipes And Specials Including Testing Of Joints But Excluding The Cost Of Pig Lead And Jointing Materialsfor 350Mm Di 118 First Year 119 Second Year 120 Thrid Year 121 Provindingjoints To Centrfuifugallydi Pipes Including Testing Of Jointsby Providing Lead Caulked Joints To Spun Iron Or C.I. Pipes And Specials Including Testing Of Joints But Excluding The Cost Of Pig Lead And Jointing Materials ) For 300Mm Di 122 First Year 123 Second Year 124 Thrid Year 125 Provindingjoints To Centrfuifugallydi Pipes Including Testing Of Jointsby Providing Lead Caulked Joints To Spun Iron Or C.I. Pipes And Specials Including Testing Of Joints But Excluding The Cost Of Pig Lead And Jointing Materials ) For 250 Mm Di 126 First Year 127 Second Year 128 Thrid Year 129 Provindingjoints To Centrfuifugallydi Pipes Including Testing Of Jointsby Providing Lead Caulked Joints To Spun Iron Or C.I. Pipes And Specials Including Testing Of Joints But Excluding The Cost Of Pig Lead And Jointing Materials ) For 200Mm Di 130 First Year 131 Second Year 132 Thrid Year 133 Provindingjoints To Centrfuifugallydi Pipes Including Testing Of Jointsby Providing Lead Caulked Joints To Spun Iron Or C.I. Pipes And Specials Including Testing Of Joints But Excluding The Cost Of Pig Lead And Jointing Materials ) For 150Mm Di 134 First Year 135 Second Year 136 Thrid Year 137 Providing Flanged Joints Toc.I. / D.I. Pipes And Specials, Including Testing Of Joints Excluding Cost Of Jointing Materials For 350Mm Di 138 First Year 139 Second Year 140 Thrid Year 141 Providing Flanged Joints Toc.I. / D.I. Pipes And Specials, Including Testing Of Joints Excluding Cost Of Jointing Materialsfor 300Mm Di 142 First Year 143 Second Year 144 Thrid Year 145 Providing Flanged Joints Toc.I. / D.I. Pipes And Specials, Including Testing Of Joints Excluding Cost Of Jointing Materials For 250 Mm Di 146 First Year 147 Second Year 148 Thrid Year 149 Providing Flanged Joints Toc.I. / D.I. Pipes And Specials, Including Testing Of Joints Excluding Cost Of Jointing Materials For 200Mm Di 150 First Year 151 Second Year 152 Thrid Year 153 Providing Flanged Joints Toc.I. / D.I. Pipes And Specials, Including Testing Of Joints Excluding Cost Of Jointing Materials For 150Mm Di 154 First Year 155 Second Year 156 Thrid Year 157 Providing Push On Joints To Di Pipes Including Testing Of Joints Using Rubber Rings For 350Mm Di 158 First Year 159 Second Year 160 Thrid Year 161 Providing Push On Joints To Di Pipes Including Testing Of Joints Using Rubber Rings For 300Mm Di 162 First Year 163 Second Year 164 Thrid Year 165 Providing Push On Joints To Di Pipes Including Testing Of Joints Using Rubber Rings For 250 Mm Di 166 First Year 167 Second Year 168 Thrid Year 169 Providing Push On Joints To Di Pipes Including Testing Of Joints Using Rubber Rings For 200Mm Di 170 First Year 171 Second Year 172 Thrid Year 173 Providing Push On Joints To Di Pipes Including Testing Of Joints Using Rubber Rings For 150Mm Di 174 First Year 175 Second Year 176 Thrid Year 177 Providingmechnical Joint Using Drum Collar For 350Mm- 200Mm D.I. Pipes And Specials, Including Testing Of Joints Excluding Cost Ofdrum Collar Jointing Materials: 178 First Year 179 Second Year 180 Thrid Year 181 Dismantling The Existing Sluice Valvesfrom The Pipeline By Cutting And Removing The Rusted Nuts And Bolts, Disassembling The Valve Using Necessary Chain Pulley Block, Taking Out The Spindle, Shutter Etc., Cleaning The Shutter, Shutter Groove With Sharp Chisel And Emrine Cloth, Applying Grease And Removing Old Packing Etc And Resetting And Assembling The Valve With New Packing Leather And Gland Packing Rope, Nuts And Bolts Including Servicing, Greasing And Resetting The Valve In The Pipeline. 182 First Year 183 Second Year 184 Thrid Year 185 Dismantling The Existing Foot Valveof Motor / Pumps Upto 49 Hp, Taking It Out From The Tank Using Necessary Chain Pulley Block, And Rectifing Leakages Including Replacement Of Flaps And Resetting The Valveand Relaying Into The Tank 186 First Year 187 Second Year 188 Thrid Year 189 Rectification Of Leakages / Breakage In 200 Mm - 150Mm Pvc Pipelinesby Exposing The Pipeline, Cutting And Dismantling The Damaged Pipe, Laying And Jointing New Pipe Bit Using Cid Joint / Coupling, Solvent Cement After Making Socket At Both The Ends Of Pipe If Necessary Etc, Including Protecting The Sides Of The Trenches, Bailing Out Water, Controlling The Valves, Testing The Pipe Line, Back Filling Etc As Per The Direction Of Engineer - In - Charge, Excluding Earthwork Excavation And Filling Which Will Be Paid Seperately. ( Material Cost Not Include ) 190 First Year 191 Second Year 192 Thrid Year 193 Rectification Of Leakages / Breakage In 150 Mm - 110 Mm Pvc Pipelinesby Exposing The Pipeline, Cutting And Dismantling The Damaged Pipe, Laying And Jointing New Pipe Bit Using Cid Joint / Coupling, Solvent Cement After Making Socket At Both The Ends Of Pipe If Necessary Etc, Including Protecting The Sides Of The Trenches, Bailing Outwater, Controlling The Valves, Testing The Pipe Line, Back Filling Etc As Per The Direction Of Engineer - In - Charge, Excluding Earthwork Excavation And Filling Which Will Be Paid Seperately. ( Material Cost Not Include ) 194 First Year 195 Second Year 196 Thrid Year 197 Rectification Of Leakages In 110 Mm - 40Mm Pvc Pipelines By Exposing The Pipeline, Cutting And Dismantling The Damaged Pipe, Laying And Jointing New Pipe Bit Using Cid Joint / Coupling, Solvent Cement After Making Socket At Both The Ends Of Pipe If Necessary Etc, Including Protecting The Sides Of The Trenches, Bailing Outwater, Controlling The Valves, Testing The Pipe Line, Back Filling Etc As Per The Direction Of Engineer - In - Charge, Excluding Earthwork Excavation And Filling Which Will Be Paid Seperately. ( Material Cost Not Include ) 198 First Year 199 Second Year 200 Thrid Year 201 Loading Heavy Dismantled Parts Of Components, Pipes And Specials And Other Materials Etc. Carefully Into Lorries And Transporting The Sameaupto 5 Km Distance And Unloading And Stacking The Materials At The Destination Including Hire To Lorry, Wire Rope, Pully Etc. 202 First Year 203 Second Year 204 Thrid Year 205 Loading Heavy Dismantled Parts Of Components, Pipes And Specials And Other Materials Etc. Carefully Into Lorries And Transporting The Sameabove 5 Km Distance Upto 10Km And Unloading And Stacking The Materials At The Destination Including Hire To Lorry, Wire Rope, Pully Etc. 206 First Year 207 Second Year 208 Thrid Year 209 Loading Heavy Dismantled Parts Of Components, Pipes And Specials And Other Materials Etc. Carefully Into Lorries And Transporting The Sameabove 10Km Distance Upto 20Km And Unloading And Stacking The Materials At The Destination Including Hire To Lorry, Wire Rope, Pully Etc. 210 First Year 211 Second Year 212 Thrid Year 213 Loading Heavy Dismantled Parts Of Components, Pipes And Specials And Other Materials Etc. Carefully Into Lorries And Transporting The Sameabovebeyond 20Km Distanceand Unloading And Stacking The Materials At The Destination Including Hire To Lorry, Wire Rope, Pully Etc. 214 First Year 215 Second Year 216 Thrid Year 217 Empty Chlorine Cylinder To Tcc And Refilling Chlorine Cylinder ( 18 Km ) Including Loading & Unloading , Stacking At Both Ends. ( Upto 3 Cylinders In One Load ) 218 First Year 219 Second Year 220 Thrid Year 221 Dismantling Carefully Motor Of 75 Hp Vertical Turbine Pump Set From The Stool Without Damaging The Motor By Detaching Cable Connection, Earthing, Couplers Etc… And Taking Out From The Pump House Using Necessary Chain Pulley Blocks And Refixing The Same After Reparing ( Repair Cost Not Included ) 222 First Year 223 Second Year 224 Thrid Year 225 Dismantlingcarefully Motor Of 75 Hp Vertical Turbine Pump Set From The Stooland Store In The Pump Housewithout Damaging The Motor By Detaching Cable Connection, Earthing, Couplers Etc And Dismantling Carefully The 75 Hpv T Pump, Without Damaging The Same By Detaching The Column Pipe, Driving Shaft, Spider Bushes, Impellers, Bearing / Bushes Etc... And Taking Out From The Pump House Using Necessary Chain Pulley Blocks And Refixing The Same After Reparing. ( Repair Cost Not Included ) 226 First Year 227 Second Year 228 Thrid Year 229 Dismantling Carefully The Motor Of Various Capacityfrom25hp Upto / Or 60 Hp From The Bed Of Pump Set / Blowers By Detaching Cable Connections, Couplers, Foundation Bolts Etc... Complete Without Damages To The Same And Taken Out From Pump House Using Necessary Chain Pulley Blocks And Refixing The Sameafter Reparing 230 First Year 231 Second Year 232 Thrid Year 233 Dismantling Carefully The Motor Of Various Capacityfrom5 Hp Upto 24Hp From The Bed Of Pump Set / Blowers By Detaching Cable Connections, Couplers, Foundation Bolts Etc... Complete Without Damages To The Same And Taken Out From Pump House Using Necessary Chain Pulley Blocks And Refixing The Sameafter Reparing 234 First Year 235 Second Year 236 Thrid Year
|