Repairs To The T3 Shed- ( Part A ) - 1 Removing And Clearing Away Corrugated Ac Sheets In Roof Including Ridges, Hips, Gutters, Barge Board, Etc. Complete. 2 Removing Old Broken Shutter And Cutting The Shutters With Gas Cutting, Loading The Scrap In The Vehicle, Unloading The Same In The Mm Baina Store, Including Cost Of Transport, Loading Unloading, Gas Cutting Etc. All Tools, Plant, Labour. Etc. Complete. 3 Supplying Of Corrugated Pvc Sheet Of 3.00M X 1.00M, Min 1.0 Mm Thickness.. Etc. Complete. 4 Fixing Of Corrugated Asbestos In T3 Shed Roofing Including Cutting / Metering, Drilling Holes, Fixing With Necessary Gi Bolts, Gi Nut, Bitumen Washers, Marking The Roofing Sheets.. Etc. Complete 5 Supplying And Fixing A.C. Barge Boards Including Drilling Holes, Necessary Gi Bolts, Nuts, Washers. Etc. Complete. 6 Supplying And Fixing Ac Plain Adjustable Ridges Including Drilling Holes, Necessary G.I. Bolts, Nuts, G.I. And Bitumen Washers, Etc. All Labour And Materialetc. Complete 7 Cleaning Of Rain Water Down Take Pvc / Ci Pipes Of 150Mm / 110Mm / 100Mm Diameterand Rcc Valley Gutters Of 40Cm ( Approx. ) Wide Of T3 Shed Roofincludingdisposing Of Cleaned Material , Etc. Complete. 8 Cleaning Of Ac Valley Gutters Of 40Cm ( Approx. ) Wide Of T3 Shed Roof Includingdisposing Of Cleaned Material, Etc. Complete 9 Providing And Fixing Turbo Ventilators On Acsheet Roof Of T3 Shed, Of 600Mm Diameter ( 24 ) With Base Sheet Of 1.0M X1.50M ( Approx ) Including Cutting Existing Ac Sheet To Required Size And Shape Fitting The Base Sheet With Necessary Screws / Nut Bolts Etc. Including Fixing Ventilators To The Base Sheet Etc. All Tools, Plants, Labour, Materials Etc. Complete. 10 Constructing Masonry In Super Structure Using Precast Cement Concrete Solid Blocks Having A Crushing Strength Of Not Less Than 35Kg. / Cm2 ( 28 Days Curing ) With A Mix Not Leaner Than ( 1:5:10 ) In Cement Mortar ( 1:6 ) Including Providing Specially Moulded Blocks At Junctions & Corners, Curing Etc. All Labour & Material Etc. Complete. 11 Providing & Fixing Shuttering For The Lintels, Continuous Lintels Etc. Of Any Size And Shape Including Cleaning, Oiling, Closing, Gaps, Removing Shuttering After Concreting, Provisions Of Necessary Props, Bracings And Other Supports Etc. All Labour And Material Etc. Complete 12 Rcc ( 1:11 / 2:3 ) Mix Using 20Mm Graded Black Trap Stone Metal Out Of Quarried Boulders As Coarse Aggregate In Columns Of Any Size And Shape, Including Mixing, Placing, Consolidating, Vibrating, Levelling, Curing Etc. But Excluding The Cost Of Shuttering And Reinforcement. All Labour & Material Etc. Complete. 13 Providing And Fixing Reinforcement With Torsteel Conforming To Is:1786 Or Equivalent Including Cutting, Bending, Tying Grills, Placing In Position, Holding In Position During Concreting Etc. Including Cost Of Binding Wire. Alllabour & Material Etc. Complete 14 Providing And Fixing P.V.C.Pipe 110Mm Diafor Rain Water Down Take Including Cutting The Pipes Of Required Size, Placing In Position Etc. Including Cleaning The Opening Of Pipes After De Shuttering Etc.All Tools, Plants, Labour And Materials Etc. Complete. 15 Plastering With C.M. ( 1:5 ) 15Mm Thick In Two Coats For External Surfaces ( Backing Coat Of 10Mm & Finishing Coat Of 5Mm ) Including Patches, Bays, Bands, Fluting, Scaffolding And Cleaning Of All Dirt, Raking Out Joints, Hacking, Scrubbing, Chamfers, Beading, Curing, All Lifts Etc. All Labour & Material Complete 16 Fabrication Of Ms Door With 65X65x6mm Box Section Frame, 65X65x6mm Diagonal Angles ( Shutter Frame To Match With The Existing Door Pattern ) , Covering The Door Shutter Frame With 3.15 Mm Thick Ms Plate, Including Fixing The Sheet To The Angle With Self-Driving Screws, Fixing Two Parallel Angles Of Size 65X65x6mm In Floor With Necessary Hold Fasts, Guide Plate At Bottom 10Mm Thick 20Cm Width, Repairs To The Pulleys, Door Handle With 16Mm Diameter Ms Bar, Oiling And Greasing Of The Shutter, Including One Coat Of Zinc Chromite Primer And Two Coats Of Synthetic Enamel Paint Etc. Including Cost Of Alllabour, Materials, Tools, Plants, Hydra / Crane Etc. Complete. ( Ms Door Of Size 5.0 M X5.50 M ) 17 Supplying And Filling River Sand In The Area Between Protection Wall For Column And For All Columns In T3 Shed With Fresh Water River Sand. All Tools, Plants, Labour, Materials Etc. Complete. ( For All Columns, Approximate Quantity 6M3 ) 18 Credit For Taking Away Dismantled Materials Including Transporting And Taking Away By Giving Credit To The Port Etc. Complete.
|