Execution Of Contract Towards Improvement Works And Allied Works Of Kadayanallur Division.- 1 Normal Ground- Excavation Of Pole Pits ( 1.25M * 0.5M*1.5M ) For 7.5M, 8M Rcc / Psc Poles 2 Normal Ground- Erection Of 7.5M, 8M Rcc / Psc Poles 3 Rocky Ground- Excavation Of Pole Pits ( 1.25M * 0.5M*1.5M ) For , 7.5M, 8M Rcc / Psc Poles 4 Rocky Ground- Erection Of7.5M, 8M Rcc / Psc Poles 5 Normal Ground- Excavation Of Pole Pits ( 1.25M * 0.6M*1.83M ) For 9M & 9.14M Rcc / Psc Poles 6 Normal Ground- Erection Of 9M & 9.14M Rcc / Psc Poles 7 Rocky Ground- Excavation Of Pole Pits ( 1.25M * 0.6M*1.83M ) For 9M & 9.14M Poles 8 Rocky Ground- Erection Of 9M & 9.14M Rcc / Psc Poles 9 Normal Ground- Excavation Of Pole Pits ( 1.25M * 0.5M*1.5M ) For Rsj Pole 36 10 Normal Ground- Erection Of Rsj Pole 36 11 Rocky Ground- Excavation Of Pole Pits ( 1.25M * 0.5M*1.5M ) For Rsj Pole 36 12 Rocky Ground- Erection Of Rsj Pole 36 13 Transporting Of Poles From Road Side To Pole Pit -, 7.5M, 8M Rcc / Psc Pole 14 Transporting Of Poles From Road Side To Pole Pit - 9M, 9.14M, Rcc / Psc Pole 15 Transporting Of Poles From Road Side To Pole Pit - Rsj 36 Pole 16 Loading And Unloading Of Poles -7.5M, 8M, Rcc / Psc Pole 17 Loading And Unloading Of Poles - 9M, 9.14M Rcc / Psc Pole 18 Loading And Unloading Of Poles - Rsj Pole 36 19 Loading And Unloading Of Line Materials 20 Concreting Of Poles As Per Board Standards ( 2*2*5 ) . The Materialsuch As Cement, Sand, Jelly, Etc., Have To Be Supplied By The Contractor ( Cement Concrete Mix 1:4:8 Using 40Mm Hard Broken Stone Including Cost Of Labour Charges.For Placing Transporting Of Sant, Jally, From Box And Water Curing For 14 Days Etc, . ) 21 Coping Of Pole ( 0.6M*0.6M*0.35M ) 22 Concreting Of Stay ( O.3M * 0.3M * 1.5M ) Including Materials Except Cement 23 Coil Earthing Per Pole & Pole Earthing 24 Normal Ground- Excavation Of Stay Pit ( 1.00M * 0.5M*1.5M ) With Transporting Of Materials To Site ( For Stay Set ) 25 Normal Ground- Erection Of Stay Set 26 Rocky Ground- Excavation Of Stay Pit ( 1.00M * 0.5M*1.5M ) With Transporting Of Materials To Site ( For Stay Set ) 27 Rocky Ground- Erection Of Stay Set 28 Fixing Of V & Channel Cross Arm 3.5 Including Transporting Of Materials From Road Side To Site 29 Fixing Of Lt 3Phase Cross Arm Including Transporting Of Materials From Road Side To Site 30 Fixing Of Lt 1Phase Cross Arm Including Transporting Of Materials From Road Side To Site 31 Fixing Of Ht Lt Ti Fitting Including Transporting Of Materials From Road Side To Site 32 Erection Of Ht Side Arm With Stud Including Transporting Of Materials From Road Side To Site 33 Erection Of Lt Side Arm With Stud Including Transporting Of Materials From Road Side To Site 34 Fixing Of Insulator ( Per Location ) Including Transporting Of Materials From Road Side To Site 35 Fixing Of Tapping Channel X Arm 36 Fixing Of 11 Kv Strain Disc 37 Ht Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site-For 7 / 2.59 Acsr ( 1Span / Wire ) 38 Ht Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site-For 7 / 3.35 Acsr ( 1Span / Wire ) 39 Ht Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site-For 7 / 4.09 Acsr ( 1Span / Wire ) 40 For Ht Line Clear Works For For 7 / 2.59 Acsr ( 1Span / Wire ) 41 For Ht Line Clear Works For For 7 / 3.35 Acsr ( 1Span / Wire ) 42 For Ht Line Clear Works For For 7 / 4.09 Acsr ( 1Span / Wire ) 43 Lt Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site- For 7 / 2.59 Acsr 44 Lt Lines - Stringing, Sagging, Binding Including Transporting Of Materials From Road Side To Site- For 7 / 3.35 Acsr 45 For Lt Line Clear Works For For 7 / 2.59 Acsr ( 1Span / Wire ) 46 For Lt Line Clear Works For For 7 / 3.35 Acsr ( 1Span / Wire ) 47 Split Neutral Guarding 48 Flat Guarding 49 Erection Of Transformer / Dismantling Upto 200Kva 50 Erection Of Feeder Cable With Open Type Fuse Unit Per Feeder 51 Erection Of Feeder Cable With Open Type Fuse Unit - For Each Addl Feeder 52 Erection Of Feeder Cable -Bus Bar Arrangement With Open Type 53 Loading & Unloading Of Distribution Transformer Below 250Kva 54 Erection Of Centre Support ( Incl. Concrete ) 55 Alteration Of Clamps 56 Drilling Less Than 23Mm Holes Per Hole / Slatted Hole 57 Cutting Of Channel 58 Cutting Of Flat 59 Cutting Of Angle 60 Rsj Pole Cuttiing 61 Lt-Changing Of Pin Point To Cut Point 62 Ht-Changing Of Pin Point To Cut Point 63 Erection Of Service Connection Materials- Single Phase 64 Erection Of Service Connection Materials- Three Phase 65 Dismantling Of Deteriorated Poles With Concrete In Damaged Condition Including Grill Separation Etc., 66 Dismantling Of Poles Without Concrete In Damaged Condition Including Grill Separation Etc., 67 Providing Jumpering At Cut Point 68 Tree Clearance In Ht Or Lt Location- For Ordinary Tree Clearance And Throng Bushes & Trees 69 For Coconut Trees 70 For Palmrah Trees 71 Set Right Of Leaning Of Ht Pole Or Lt Pole Including X Arm, Ti Fittings 72 Resagging Of Conductor Of 7 / 2.59 73 Resagging Of Conductor Of 7 / 3.35 74 Resagging Of Conductor Of 7 / 4.09 75 Erection Of Tapping Structure ( Double Pole ) Complete As Per Tneb Standard Including Painting 76 Erection Of Distribution Transformer Double Pole Structure Complete As Per Tneb Standard Including Painting, Feeders Arrangrment, Colour Washing Of Rcc Poles Etc.. Fixing Of Poles Type To Be Unit Ht / Lt Las And Jumpering 3 Nos Earth Pits With Earth Trough Except Erection Of Distribution Transformer. 77 Erection Of 11 Kv Single Pole Structure Including Erection Of Dt Complete As Per Tneb Standard Including Painting, Feeders Arrangrment, Colour Washing Of Rcc Poles Etc.. Fixing Of Poles Type To Be Unit Ht / Lt Las And Jumpering 3 Nos Earth Pits With Earth Trough Except Erection Of Distribution Transformer. 78 Dismantling Of Stay Set Complete Including Stay Rod 79 Dismantling Of Stay Set Complete Without Stay Rod 80 Dismantling Of Conductor Of 7 / 2.59 Including Transporting The Conductors To The Nearest Road Side And Stocking In Coils 81 Dismantling Of Conductor Of 7 / 3.35 Including Transporting The Conductors To The Nearest Road Side And Stocking In Coils 82 Dismantling Of Conductor Of 7 / 4.09 Including Transporting The Conductors To The Nearest Road Side And Stocking In Coils 83 Dismantling Of Transformer Structure Materials Complete Set And Transporting The Same From The Location To The Road Side 84 Dismantling Of V Cross Arm 85 Dismantling Of 3 Phase X Arm 86 Dismantling Of Single Phase X Arm 87 Dismantling Of Ht / Lt Ti Fitting 88 Dismantling Of Ht Pin Insulators 89 Dismantling Of Lt Pin Insulators 90 Dismantling Of Strain Disc 91 Dismantling Of Tapping / Guarding Channel X Arm 92 Hiring Of Jcb 93 Hiring Of Crane 94 Exceeding 1 Hour For Every Hour 95 Transporting Of Charges Of Dt / Line Materials Using Private Vehicle Upto 20 Km ( Up And Down ) 96 Beyond 20 Km For Every Km

Key Dates

Contract Date 03 Nov 2022

Contact Information

Company Name
Awarded Bids List
S.No Bid Number Bidder Name Awarded Currency Awarded Value
1 569609 HARIHARAN CONSTRUCTIONS INR 250000.00
Contract Value 250,000