Contract Award Notice |
|
TRR | 8557163 |
Organization | Dakshinanchal Vidyut Vitran Nigam Limited |
Tender No | 12/EDC-I(M)/2022-23 |
Funded By | Self-Funded |
Country | India , Southern Asia |
Contract Value | 199,493 |
Work Detail |
Proposed Work For Maintenance And Replacement Of Damaged 11Kv / Lt Line At Various Places In The Jurisdiction Of E.D.D.-Ist, Mathura.- 1 Carriage Of 8.5 Mtrs. Long Pcc Pole From 132 Kv Store Center Mathura To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. ( Distance 00-70Kms. ) 2 Carriage Of 9 / 11 Mtrs. Long St / 9 Mtrs. Long Pcc Pole From 132 Kv Store Center Mathura To Site Of Work Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. ( Distance 00-70Kms. ) 3 Carriage Of Line Material I.E. Conductor, G.I. Wire Tpmo Stay Rod, Disc Insulator, Cross Arm, Angle Channel And Other Required Material From Store Center At 132 Kv Substation Mathura To The Site Of Work Including Loading And Unloading Of Material At Both Ends. 4 Carriage Of 11 Kv Xlpe Cable Size 3X70 Sq.Mm. Cable Form Store Center Mathura Including Cost Of Shifting Of Drum From Inside Of Store, Removing Of Cable From Drum And Re-Rolling Of Extra Removed Cableincluding Loading & Unloading At Both Ends. 5 Carriage Of Lt Single Core Lead 1X1000 Sq.Mm. Form Store Center Mathura Including Cost Of Shifting Of Drum From Inside Of Store, Removing Of Cable From Drum And Re-Rolling Of Extra Removed Cableincluding Loading & Unloading At Both Ends. 6 Replacement Of 8.5 Mtrs. Long Damaged Pcc Pole By Opening Of All Existing Accessories And Conductor From Damaged Pole Properly And Removal Of Damaged Pole And Erect The New Pole At Same Place Including Fixing Of All Existing Accessories And Conductor On The New Pole Etc. As Per Direction Of Supervising Engineer. It Including The Cost Of All Labour, T&P Etc. ( Including Carriage Of Damaged Pole To Other Place ) Required For Proper Completion Of Work. 7 Replacement Of 9 / 11 Mtrs. Long St / 9 Mtrs. Long Pcc Damaged Pole By Opening Of All Existing Accessories And Conductor From Damaged Pole Properly And Removal Of Damaged Pole And Erect The New Pole At Same Place Including Fixing Of All Existing Accessories And Conductor On The New Pole Etc. As Per Direction Of Supervising Engineer. It Including The Cost Of All Labour, T&P Etc. ( Including Carriage Of Damaged Pole To Other Place ) Required For Proper Completion Of Work. 8 Erection Of Single Pole Structure On 8.5 Mtrs Long Pcc Pole Including Fitting Of All Relevant Accessories As Per Respo Norms. 9 Dismantling Of Existing Damaged Double Pole Structure On 8.5 Mtrs. Long Pcc Pole By Opening All Relevant Accessories. 10 Erection Of Double Pole Structure On 8.5 Mtrs. Long Pcc Pole By Digging Of Pits. Opening And Fitting Of All Relevant Accessories As Per Respo Norms. 11 Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. 12 Installation Of Stay Set With Grouting And Nuzzling Etc. As Per Respo Drawing / Norms Along With All Routine Material To Be Used For Such Works. 13 Removal Of Acsr Weasel Conductor Existing Conductor From Damaged Line / Pole Including Opening Of Jumpers Etc As Per Requirement Of Site And As Per Direction Of Supervising Engineer. 14 Removal Of Acsr Dog / Raccon Conductor Existing Conductor From Damaged Line / Pole Including Opening Of Jumpers Etc As Per Requirement Of Site And As Per Direction Of Supervising Engineer. 15 Removal Of Arial Bunch Conductor 3X50 Sq Mm. Existing Conductor From Damaged Line / Pole Including Opening Of Jumpers Etc As Per Requirement Of Site And As Per Direction Of Supervising Engineer. 16 Removal Of Arial Bunch Conductor 3X95 / 120 Sq Mm. Existing Conductor From Damaged Line / Pole Including Opening Of Jumpers Etc As Per Requirement Of Site And As Per Direction Of Supervising Engineer. 17 Laying, Sagging And Stringing And Jumpering / Binding Etc. Ofnew &Old Acsr Weasel Conductor In 11 Kv / Lt Lines As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work 18 Laying, Sagging And Stringing And Jumpering / Binding Etc. Ofnew &Old Acsr Dog / Raccon Conductor In 11 Kv / 33Kv Lines As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work 19 Laying, Sagging And Stringing And Jumpering / Binding Etc. Ofnew &Old Arial Bunch Conductor 3X50 Sq Mm. In Lt Lines As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work 20 Laying, Sagging And Stringing And Jumpering / Binding Etc. Ofnew &Old Arial Bunch Conductor 3X95 / 120 Sq Mm. In Lt Lines As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work 21 Laying Of 11 Kv Xlpe Cable Size 3X70 Sq.Mm. In The Trench / G.I Pipe / Hdpe Pipe And Re-Dressing Of Trench After Laying Of Xlpe Cablefor Proper Completion Of Work As Per Direction Of Supervising Engineer. 22 Laying Oflt Single Core Lead 1X1000 Sq.Mm. From T / F To Lt Line Single Pole Structure For Proper Completion Of Work As Per Direction Of Supervising Engineer. 23 Fixing Of 11 Kv Cable Indoor / Outdoor Jointing Kit Of Size 3X120 / 3X185 Sq.Mm Outdoor Including Removal Of Insulation, Semi-Conductor Of The Cable End And Filling Of Cable Box Complete Work As Per Direction Of Supervising Engineer. 24 Re-Sagging Of Loose 11 Kv. / L.T. Line As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T&P Etc Required For Proper Completion Of Work. 25 Re-Sagging Of Arial Bunch Conductor Size 3X50 / 95 / 120 Sq Mm Lines As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T&P Etc Required For Proper Completion Of Work. 26 Body And Neutral Earthing Of 250 / 400 Kva Transformers By Digging Pits 6” Dia Up To 3 Mtr Deep Including Inserting Lowering 80Mm Dia G.I. And Insert 50Mm G.I. Pipe Chemical Filled Pipe ( Pipe In Pipe Earthing ) I.S.I. Mark B-Grade Connecting With G.I. Flat 50X6 Mm Power Transformer To 80Mm Dia G.I. Pipe And Filling Of Chemical Mixture Around The G.I. Pipe Up To 3Mtr. Including Making Of Chamber. 27 Dismentling And Re- Mounting Of 25 / 63 Kva Transformer On The Double Pole / Plinth Structures And Connections Thereof. 28 Replacement Of 11 Kv / Lt Jumphers 29 Replacement Of 11 Kv X-Arms By Opening Of Damaged Accessories From The Pole Structure & Fitting Of New Accessories 30 Replacement Of 11 Kv Pin Insulators With Pin By Opening Of Damaged Accessories From The Pole Structure & Fitting Of New Accessories 31 Replacement Of 11 Kv Disc Insulator With Fitting With Pin By Opening Of Damaged Accessories From The Pole Structure & Fitting Of New Accessories 32 Replacement Of Lt Shackle Insulator By Opening Of Damaged Accessories From The Pole Structure & Fitting Of New Accessories 33 Replacement Of Lt Pin Clamp By Opening Of Damaged Accessories From The Pole Structure & Fitting Of New Accessories 34 Replacement Of Stay Clamp By Opening Of Damaged Accessories From The Pole Structure & Fitting Of New Accessories 35 Replacement Ofx-Arms Clamp By Opening Of Damaged Accessories From The Pole Structure & Fitting Of New Accessories 36 Re-Nuzzling Of Old Stay Set By Opening Old Binding For Better Straightening Of Pole And Re-Sag The Existing Conductor Of H.T / L.T Line Properly As Per Direction Of Supervising Engineer. 37 Straightening Of 8.5 / 09 / 11 Mtr. Long Pcc / St / Rail Pole Tilted Poleat Various Places By Straighteningof Pole Including The Cost Of Labour , T&P Charges Required For Proper Completion Of Work. 38 Construction Of T Pole / Section Pole For 11Kv / Lt Line On The Erected / New Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Including The Cost Of All Labor, T&P & Grouting Etc. Required For Proper Completion Of Work 39 Chopping Of Tree Branches To Clear The Line Route To Give 02 Meter Horizontal And Vertical Clearance To The Line Including Cost Of Labour T&P Etc. |
Key Dates |
|
Contract Date | 19 Sep 2022 |
Contact Information |
||||||||||||||||||||||||||||||||||||||||
View Notice Now...Login with your Social Account for Instant Access to this notice
|