Subscribe     Pay Now

For The Work Against Sanctioned Package No. 58 / 2022-23, 59 / 2022-23, 61 / 202...


Contract Award Notice

TRR 8541502
Organization Purvanchal Vidyut Vitaran Nigam Limited
Tender No 23/EUDC(G)/2022-23
Funded By Self-Funded
Country India , Southern Asia
Contract Value 578,848

Work Detail

For The Work Against Sanctioned Package No. 58 / 2022-23, 59 / 2022-23, 61 / 2022-23, 62 / 2022-23 And 63 / 2022-23 ( Under Deposit Scheme ) Under Electricity Urban Distribution Division-I / Iv, Gorakhpur- 2 Loading, Unloading And Safe Carriage Of Following Materials From Store Centre, Gorakhpur To Je Dump Store And Je Dump Store To Work Site With Proper Stacking :- 3 63 Kva Transformer 4 St Pole 11 Mtr Long 5 11 Kv Cross Arm 6 Ms Top Channel ( 125X65x2240 ) Mm 7 Ms Angle ( Dropper ) 100X50x2028x Mm 8 Ms Angle 75X75x6x2028 Mm With Clamp & Bolts & Nut ( T / F Base ) 9 11 Kv Pin Insulator With Pin 10 11 Kv Dise Insulator With Fitting 11 Acsr Weasel Conductor 12 11 Kv Fuse Set 13 Stay Complete ( Stay Rod 16X1800 Mm Stay Wire 5 Kg Stay Clamp Bolt & Nuts ) 14 Earthing Complete 15 Ms Channel 125X65x1300 Mm ( T-Off ) 16 F Bracket With Nuts & Bolts 17 Supply Offollowing Material / Fitting Complete In All Respect :- 18 Cross Arm Holding Clamp With Nuts & Bolts 19 Clamps For T-Off Withbolts & Nuts 20 Holding Clamp For Top Dropper Channel Fuse Set Etc With Nuts & Bolts 21 Nuts & Bolts Of Different Sizes 22 Cu Z Clamp 23 Al Lugs 24 The Excavation Of 2 No Foundation Pit Of Size 750Mmx450mm And Having Depth Of 1 / 6Th Of The Full Length Of The Pole. Fabrication & Erection Of Double Pole With Fixing Of Necessary Clamps & Accessories ( Top Channel, Dropper Angle Etc. ) As Per Required. All Required Materials Such As Holding Clamp / Stp Clamp, Nuts & Bolts Off Size Etc Will Be Provided By The Contractor.Grouting Of Pole In Cc 1:4:8 ( Cement, Sand & 40 Mm Brick Ballast ) , Grouting Will Be Done In The Block Ofsize 450X450 Mm X Depth Upto Ground Level And Backfilling Of Pits With Mud Completely And Leveling Etc ( Material Provided By Contractor ) .Making Plinth Around Pole Height 300 Mm Above Ground Level With Top 100 Mm Is Kept Tapered So That No Rainwater Gets Accumulated On The Top. All Work Will Be Done As Per Respo Norms & Relevent Is Specification. 25 The Excavation Of 1 No Foundation Pit Of Size 750Mmx450mm And Having Depth Of 1 / 6Th Of The Full Length Of The Pole. Fabrication & Erection Of Pole With Fixing Of Necessary Clamps & Accessories ( Top Channel, Dropper Angle Etc. ) As Per Required. All Required Materials Such As Holding Clamp / Stp Clamp, Nuts & Bolts Off Size Etc Will Be Provided By The Contractor.Grouting Of Pole In Cc 1:4:8 ( Cement, Sand & 40 Mm Brick Ballast ) , Grouting Will Be Done In The Block Ofsize 450X450 Mm X Depth Upto Ground Level And Backfilling Of Pits With Mud Completely And Leveling Etc ( Material Provided By Contractor ) .Making Plinth Around Pole Height 300 Mm Above Ground Level With Top 100 Mm Is Kept Tapered So That No Rainwater Gets Accumulated On The Top. All Work Will Be Done As Per Respo Norms & Relevent Is Specification. 26 Painting Of Pole By Double Coating Aluminum & Red Oxide Paint. Paint Will Beprovided By Contractor 27 Earthing Of St Pole By Ms Earthing Rod & 6 Swg Earthing Wire As Per Respo Norms. 28 Erection And Grouting Of Stay In Cc Ratio 1:4:8 Of Cement, Sand And Stone Ballast Including Cost Of Grouting Material With Nozelling And Binding Of Stay Wire ( Complete Work ) 29 Laying, Stringing, Sagging, Binding And Jumpering Of Acsr Weasel Conductor For Lt / Ht Line With Fixing Of Lt Clamps / Other Clamps, Shackle Insulator And Nuts&Bolts Off Size As Per Required. 30 Erection Offuse Set 31 Chemical Earthing Of Transformer ( Body+Neutral ) As Per Is Code 3043 - 1987 Specification ( Materials Will Be Provided By Contractor ) 32 Fabrication, Errection, Commissioning & Testing Of63 Kva T / F On Double Pole With All Accessories Including Make Its Lt And Ht Connection. All Necessary Materials Such As Holding Clamp, Al.Lugs ( Confirming To Is 8309 ) , Z Clamp, Nuts & Bolts Will Be Supplied By The Contractor. 33 Fo|Qr Uxjh; Forj.K [ K.M&Izfke Xksj [ Kiqj Ds Vurxzr Tek ;Kstuk Esa Lohd`R Isdst La [ ;K 59@2022&23 ¼Jh , 0Ds0 Flag Oklrs Hkkjrh; , ;Jvsy Fy0 ] IzKkur Vkoj ] Vªkaliksvzuxj ] Xksj [ Kiqj Ds Hkkj O`F ) Ds Mijkur Vko;D Fo|Qrhdj.K Dk Dk;Z½ Ds Dk;Ksz Dks Lseh Vuzdh Ds Vk / Kkj Ij Djk;S Tkus Gsrq Dk;Z Dk Fooj.K %& 34 Loading, Unloading And Safe Carriage Of Following Materials From Store Centre, Gorakhpur To Je Dump Store And Je Dump Store To Work Site With Proper Stacking :- 35 11 Kv Xlpe 3X70sq Mm 36 Jointing Kit For 11 Kv Xlpe 3X70 Sq Mm 37 11 Kv Ct ( 20 / 5A ) 38 11 Kv Ct / Pt Metering Pole Mounting Unit ( 20 / 5A ) 39 11 Kv Electronic Tvm Meter 40 Supply Offollowing Material / Fitting Complete In All Respect :- 41 Holding Clamps With Nuts & Bolts 42 Nuts & Bolts Of Different Sizes 43 G.I Pipe 4 Dia 44 Laying And Dressing Of Under Ground 11 Kv Xlpe 3X70 Sq Mm By Digging Method Using Bricks And Sand Etc As Per Resspo Norms. 45 Errection Of 11 Kv Xlpe Cable 3X70mm² Jointing Kit With Complete Work 46 Erection Of 11 Kv Ct & 11 Kv Ct / Pt Pole Mounting Unit With 11 Kv Tvm Meter 47 Earthing Of Ppmc 48 Earthing Of Ct Unit 49 Fo|Qr Uxjh; Forj.K [ K.M&Prqfkz Xksj [ Kiqj Ds Vurxzr Tek ;Kstuk Esa Lohd`R Isdst La [ ;K 61@2022&23 ¼15Osa Forr Vk;Ksx Ds Vurxzr Okmz La0 07 ] Jkirhuxj I=Dkjiqje Esa Feuh Uydwi Ds U;S La;Kstu Dk Dk;Z½ Ds Dk;Ksz Dks Lseh Vuzdh Ds Vk / Kkj Ij Djk;S Tkus Gsrq Dk;Z Dk Fooj.K %& 50 Loading, Unloading And Safe Carriage Of Following Materials From Store Centre, Gorakhpur To Je Dump Store And Je Dump Store To Work Site With Proper Stacking :- 51 25Kva Transformer 52 St Pole 11 Mtr Long 53 11 Kv Cross Arm 54 Ms Top Channel ( 125X65x2240 ) Mm 55 Ms Angle ( Dropper ) 100X50x2028 Mm 56 Ms Angle 75X75x6x2028 Mm With Clamp & Bolts & Nut ( T / F Base ) 57 11 Kv Pin Insulator With Pin 58 11 Kv Dise Insulator With Fitting 59 Acsr Weasel Conductor 60 11 Kv Fuse Set 61 Stay Complete ( Stay Rod 16X1800 Mm Stay Wire 5 Kg Stay Clamp Bolt & Nuts ) 62 Earthing Complete 63 Lt Pvc Cable 3.5X35 Sq Mm 64 F Bracket With Nuts & Bolts 65 Supply Offollowing Material / Fitting Complete In All Respect :- 66 Cross Arm Holding Clamp With Nuts & Bolts 67 Holding Clamp For Top Dropper Channel Fuse Set Etc With Nuts & Bolts 68 Nuts & Bolts Of Different Sizes 69 Cu Z Clamp 70 Al Lugs 71 The Excavation Of 2 No Foundation Pit Of Size 750Mmx450mm And Having Depth Of 1 / 6Th Of The Full Length Of The Pole. Fabrication & Erection Of Double Pole With Fixing Of Necessary Clamps & Accessories ( Top Channel, Dropper Angle Etc. ) As Per Required. All Required Materials Such As Holding Clamp / Stp Clamp, Nuts & Bolts Off Size Etc Will Be Provided By The Contractor.Grouting Of Pole In Cc 1:4:8 ( Cement, Sand & 40 Mm Brick Ballast ) , Grouting Will Be Done In The Block Ofsize 450X450 Mm X Depth Upto Ground Level And Backfilling Of Pits With Mud Completely And Leveling Etc ( Material Provided By Contractor ) .Making Plinth Around Pole Height 300 Mm Above Ground Level With Top 100 Mm Is Kept Tapered So That No Rainwater Gets Accumulated On The Top. All Work Will Be Done As Per Respo Norms & Relevent Is Specification. 72 The Excavation Of 1 No Foundation Pit Of Size 750Mmx450mm And Having Depth Of 1 / 6Th Of The Full Length Of The Pole. Fabrication & Erection Of Pole With Fixing Of Necessary Clamps & Accessories ( Top Channel, Dropper Angle Etc. ) As Per Required. All Required Materials Such As Holding Clamp / Stp Clamp, Nuts & Bolts Off Size Etc Will Be Provided By The Contractor.Grouting Of Pole In Cc 1:4:8 ( Cement, Sand & 40 Mm Brick Ballast ) , Grouting Will Be Done In The Block Ofsize 450X450 Mm X Depth Upto Ground Level And Backfilling Of Pits With Mud Completely And Leveling Etc ( Material Provided By Contractor ) .Making Plinth Around Pole Height 300 Mm Above Ground Level With Top 100 Mm Is Kept Tapered So That No Rainwater Gets Accumulated On The Top. All Work Will Be Done As Per Respo Norms & Relevent Is Specification. 73 Painting Of Pole By Double Coating Aluminum & Red Oxide Paint. Paint Will Beprovided By Contractor 74 Earthing Of St Pole By Ms Earthing Rod & 6 Swg Earthing Wire As Per Respo Norms. 75 Erection And Grouting Of Stay In Cc Ratio 1:4:8 Of Cement, Sand And Stone Ballast Including Cost Of Grouting Material With Nozelling And Binding Of Stay Wire ( Complete Work ) 76 Laying, Stringing, Sagging, Binding And Jumpering Of Acsr Weasel Conductor For Lt / Ht Line With Fixing Of Lt Clamps / Other Clamps, Shackle Insulator And Nuts&Bolts Off Size As Per Required. 77 Fabrication, Errection, Commissioning & Testing Of25 Kva T / F On Double Pole With All Accessories Including Make Its Lt And Ht Connection. All Necessary Materials Such As Holding Clamp, Al.Lugs ( Confirming To Is 8309 ) , Z Clamp, Nuts & Bolts Will Be Supplied By The Contractor. 78 Errection Offuse Set 79 Chemical Earthing Of Transformer ( Body+Neutral ) As Per Is Code 3043 - 1987 Specification ( Materials Will Be Provided By Contractor ) 80 Fo|Qr Uxjh; Forj.K [ K.M&Izfke Xksj [ Kiqj Ds Vurxzr Tek ;Kstuk Esa Lohd`R Isdst La [ ;K 62@2022&23 ¼15Osa Forr Vk;Ksx Ds Vurxzr Tydy Fohkkx Uxj Fuxe Okmz La0 69 ] Iqfyl Ykbu Xksj [ Kiqj Esa 15 Fd0ok0 Ds Uydwi Fo|Qrhdj.K Dk Dk;Z½ Ds Dk;Ksz Dks Lseh Vuzdh Ds Vk / Kkj Ij Djk;S Tkus Gsrq Dk;Z Dk Fooj.K %& 81 Loading, Unloading And Safe Carriage Of Following Materials From Store Centre, Gorakhpur To Je Dump Store And Je Dump Store To Work Site With Proper Stacking :- 82 11 Kv Xlpe Cable 3X185sq Mm 83 25Kva Transformer 84 St Pole 09 Mtr Long 85 11 Kv Top Channel 86 11 Kv Dropper Angle 87 11 Kv Cable Jointing Kit 88 11 Kv Fuse Set 89 11 Kv Tpmo Set 90 Earthing Complete 91 11 Kv S / S Base Angle 92 Lt Pvc Cable 4X16 Sq Mm 93 Supply Offollowing Material / Fitting Complete In All Respect :- 94 Clamps For Top Dropper Angle Etc With Nuts & Bolts 95 Nuts & Bolts Of Different Sizes 96 Al Lugs 97 G.I Pipe Dia 4 Inch 98 Hdpe Pipe Dia 150 Mm Pn6 Pe8 99 The Excavation Of 2 No Foundation Pit Of Size 750Mmx450mm And Having Depth Of 1 / 6Th Of The Full Length Of The Pole. Fabrication & Erection Of Double Pole With Fixing Of Necessary Clamps & Accessories ( Top Channel, Dropper Angle Etc. ) As Per Required. All Required Materials Such As Holding Clamp / Stp Clamp, Nuts & Bolts Off Size Etc Will Be Provided By The Contractor.Grouting Of Pole In Cc 1:4:8 ( Cement, Sand & 40 Mm Brick Ballast ) , Grouting Will Be Done In The Block Ofsize 450X450 Mm X Depth Upto Ground Level And Backfilling Of Pits With Mud Completely And Leveling Etc ( Material Provided By Contractor ) .Making Plinth Around Pole Height 300 Mm Above Ground Level With Top 100 Mm Is Kept Tapered So That No Rainwater Gets Accumulated On The Top. All Work Will Be Done As Per Respo Norms & Relevent Is Specification. 100 The Excavation Of 1 No Foundation Pit Of Size 750Mmx450mm And Having Depth Of 1 / 6Th Of The Full Length Of The Pole. Fabrication & Erection Of Pole With Fixing Of Necessary Clamps & Accessories ( Top Channel, Dropper Angle Etc. ) As Per Required. All Required Materials Such As Holding Clamp / Stp Clamp, Nuts & Bolts Off Size Etc Will Be Provided By The Contractor.Grouting Of Pole In Cc 1:4:8 ( Cement, Sand & 40 Mm Brick Ballast ) , Grouting Will Be Done In The Block Ofsize 450X450 Mm X Depth Upto Ground Level And Backfilling Of Pits With Mud Completely And Leveling Etc ( Material Provided By Contractor ) .Making Plinth Around Pole Height 300 Mm Above Ground Level With Top 100 Mm Is Kept Tapered So That No Rainwater Gets Accumulated On The Top. All Work Will Be Done As Per Respo Norms & Relevent Is Specification. 101 Painting Of Pole By Double Coating Aluminum & Red Oxide Paint. Paint Will Beprovided By Contractor 102 Earthing Of St Pole By Ms Earthing Rod & 6 Swg Earthing Wire As Per Respo Norms. 103 Laying Of Hdpe Pipe 150 Mm Diameter For Laying Of 11 Kv 3X185 Sq Mm Xlpe Cable By Horizontal Drilling Method. The Hdpe Pipe Shall Be Of Pe 80 Grade With Pressure Rating Pn6 Conforming To Is 4984 / 1995 And Shall Have Wall Thickness Of 6.20 To 7.10 Mm ( Hdpe Pipe 150Mm Dia With Elbow And Socket For 11 Kv Cable Will Be Supplied By Contractor ) 104 Laying And Dressing Of Under Ground 11 Kv 3X185 Sq Mm Xlpe Cable Into Hdpe Pipe By Horizontal Drilling Method As Per Respo Norms. The Depth Of Horizontal Drilling Shall Be Between 2 To 3 Meters Or As Per Site Required. 105 Fabrication, Errection, Commissioning & Testing Of25 Kva T / F On Double Pole With All Accessories Including Make Its Lt And Ht Connection. All Necessary Materials Such As Holding Clamp, Al.Lugs ( Confirming To Is 8309 ) , Z Clamp, Nuts & Bolts Will Be Supplied By The Contractor. 106 Errection Of 11 Kv 3X185 Sq Mm Xlpe Cable Jointing Kit With Complete Work 107 Erection Of Tpmo & Fuse Set 108 Chemical Earthing Of Transformer ( Body+Neutral ) As Per Is Code 3043 - 1987 Specification ( Materials Will Be Provided By Contractor ) 109 Fo|Qr Uxjh; Forj.K [ K.M&Izfke Xksj [ Kiqj Ds Vurxzr Tek ;Kstuk Esa Lohd`R Isdst La [ ;K 63@2022&23 ¼14Osa Forr Vk;Ksx Ds Vurxzr Tydy Fohkkx Uxj Fuxe Okmz La0 30 Egsok ] Flf ) Fouk;D ] Dkyksuh ] Pdjk Vooy ] Xksj [ Kiqj Esa Feuh Uydwi Gsrq 5 Fd0ok0 Ds La;Kstu Gsrq Fo|Qrhdj.K Dk Dk;Z½ Ds Dk;Ksz Dks Lseh Vuzdh Ds Vk / Kkj Ij Djk;S Tkus Gsrq Dk;Z Dk Fooj.K %& 110 Loading, Unloading And Safe Carriage Of Following Materials From Store Centre, Gorakhpur To Je Dump Store And Je Dump Store To Work Site With Proper Stacking :- 111 Lt Abc ( 3X50+1X35+1X16 ) Sq.Mm 112 Supply Offollowing Material / Fitting Complete In All Respect :- 113 Distribution Box With Clamp ( Distribution Box Shall Be Made From 20 Swg Crca Sheet By Deep Drown Method With Powder Coating & Size Of Box Shall Be 418 Mm X 300Mm X 120 Mm ( Roof Of The Box Shall Be Tapered On Both Sides To Drain The Rain Water ) 114 Clamp For Distribution Box 115 Lt Insulation Piercing Connector For Line To Line Jumpering In Case Of Tapping 116 Insulated Dead End Clamp With I Hook 117 Insulated Suspension Clamp With I Hook 118 Lt Pvc Insulated 1X35 Sq.Mm Cable 119 Nuts & Bolts 120 Laying, Stringing, Sagging, Binding And Jumpering Of Abc ( 3X50+1X35+1X16 ) Sq.Mm. Cable Of Lt Line With Fixing Of Distribution Box With Clamp, Insulated Dead End Clamp With I Hook, Suspension Clamp With I Hook ( Insulated ) , Lt Insulated Piercing Connector, Xlpe 1X35 Sq.Mm. Al. Cable For Enerzing Db, Xlpe 1X16 Sq.Mm. Al. Cable For Giving Connection To Street Light And Nuts&Bolts Off Size By The Contractor.

Key Dates

Contract Date 19 Sep 2022

Contact Information

Company Name
Awarded Bids List
S.No Bid Number Bidder Name Awarded Currency Awarded Value
1 2954411 M/s Arya Construction INR 578848.00
Contract Value 578,848
Contract Date 19 Sep 2022

View Notice Now...

Login with your Social Account for Instant Access to this notice


Tell us about your Product / Services,
We will Find Tenders for you