Providing And Installing Playground Equipment In Children Park At Cmpdi, Ri-Iv, Jaripatka Nagpur ( Fy 2022-2023 ) -2 Providing, Installation Of Play Ground Equipment Toddler Swing With Following Specification: I ) Top Bar Shall Bemade Up Of 50 Nb Gi Pipe , The Length Of The Bar Shall Be2.8 M Long, Ii ) Center Support Shall Be Made Up Of 100Nb Gi Pipe. Iii ) Special Design Pipe Plans Hold Casting Assembly With Noiseless And Smooth Momentbearing.Iv ) . Round Cobalt Coated Short Link Chain Of 8Mm Diameter Electric Butt Welded As Per Isi: 2429, Which Can Carry A Weight Of 400 Kg. Chain Shall Be Ofrubberised Coated S.S.S-Hook V ) Seat Shall Be Made Up Of Rubber With Non-Skid Surface With Nylon Lining In Sandwich Pattern, Belt Seat Should Be 13Mm Thick. S.S. Triangular Hook Is Moulded In Belt In Such A Way That It WonT Project From The Top Surface Of The Belt Seats, Vi ) Palm Tree Made Up Of Lldpe Plastic Shall Be Fixed On Centre Pipe For Aesthetic Purpose. Vii ) All Welded Joints Should Be Properly Grounded And Coated With An Epoxy Sealant For Rust Resistance. All Sharp Edges And Cornersshould Be Grounded Before Painting. Powder Coat Should Be Done By First Coat Of Primer40-50 Micron Thickness And Top Coat Of Pure Polyester Powder With 70- 80 Micron Thickness. The Rates Shall Be Inclusive Of Cost Of All Materials ( Including Sand, Cement, Etc ) , Labour , Civil Works For Fixing, Appropriate Foundation, Transportation At Site, Etc And One Year Free Maintenance Of The Equipment From The Date Of Completion. The Equipment Should Be Approved By Engineer In Charge Before Installation At Site. Pictures Enclosed For Reference. 3 Providing, Installation Of Play Ground Equipment Double Swingwith Following Specification: I ) Top Bar Shall Be Made Up Of 50 Nb G.I B-Class Pipe Having 2 Sets Of Bearing Assembly & Profile Plate At End. The Length Of Top Bar Should 2.8M Long. Ii ) Junction Box Shall Be Designed In Such A Way, So As To Fix 2 No’S Of Leg Pipe Which Shall Be Made Up Of 40 Nb G.I Pipes, In An Angle To Give Stability To Swing. The Leg Pipe Should Be 2900 Mm Long. Iii ) Special Design Nylon Pipe Clamps Should Be Provided For Smooth And Noiseles Movement. Iv ) Ss 304 Grade Chain Shall Be Used For Connecting Rubber Belt Seat With Bearing Assembly. V ) Seat Shall Be Of Rubber With Non-Skid Surface With Nylon Lining In Sandwich Pattern.Belt Seat Should Be 13 Mm Thick. S.S. Triangular Hook Is Moulded In Belt In Such A Way That It WonT Project From The Top Surface Of The Belt Seats.The Rates Shall Be Inclusive Of Cost Of All Materials ( Including Sand, Cement, Etc ) , Labour , Civil Works For Fixing, Appropriate Foundation, Transportation At Site, Etc And One Year Free Maintenance Of The Equipment From The Date Of Completion. The Equipment Should Be Approved By Engineer In Charge Before Installation At Site. Pictures Enclosed For Reference. 4 Providing, Installation Of Play Ground Equipment Seating Merry Go Round With Following Specification: I ) The Platform Shall Consist Of Non-Skid Type Aluminium Chequered Plate Of 14 Swg. All Welded Joints Should Be Properly Grounded And Coated With An Epoxy Sealant For Rust Resistance.Ii ) All Sharp Edges And Cornersshould Be Grounded Before Painting. Powder Coat Done By First Coat Of Primer40-50 Micron Thickness And Top Coat Of Pure Polyester Powder With 70- 80 Micron Thickness. Iii ) The Ring On Which The Chequered Plate Is Based Should Be Made Out Of 25 Nb G.I Pipes B-Class Isi Mark And The Support Below The Chequered Plate Should Be Of 40 X 40 X 5 And 25 X 25 X 5 G.I Angle. The Platform Frame Should Be 25 X 5 And 40 X 5 Ms Angle With Handrails Of 20 Nb G.I Pipes. Iv ) The Whole Structure Shall Be Mounted On Heavy-Duty Bearing Shaft Permanently Lubricated With Water Sealant. The Stand Should Be Of 80 Nb G.I Pipes. The Foundation Frame Fabricated With 40 X 40X 5 Angle. V ) Seat Shall Be Made Up Of Fibre Reinforcement Plastic And Railing Of 25 Nb & 20 Nb G.I Pipe Bclass Isi Mark. The Rates Shall Be Inclusive Of Cost Of All Materials ( Including Sand, Cement, Etc ) , Labour , Civil Works For Fixing, Appropriate Foundation, Transportation At Site, Etc And One Year Free Maintenance Of The Equipment From The Date Of Completion. The Equipment Should Be Approved By Engineer In Charge Before Installation At Site. Pictures Enclosed For Reference. 5 Providing, Installation Of Play Ground Equipment Deluxe Multiseater See Saw With Following Specification: I ) See Saw Lever Shall Be Made Up Of 80 Nb Gi B-Class Pipes With Lever Length 2550 Mm Long. Lever Ends Shall Be Covered With Gi Pipe End Cap. Ii ) Seat Should Be Of Lldpe Plastic With Inbuilt Handle And Stand Of 80 Nb Gi B-Class Pipes. Pedestal Bearing Should Be Given For Smooth And Noiseless Movement Of See Saw Lever. Iii ) Bearing Should Be Covered With Nylon Cover.The Rates Shall Be Inclusive Of Cost Of All Materials ( Including Sand, Cement, Etc ) , Labour , Civil Works For Fixing, Appropriate Foundation, Transportation At Site, Etc And One Year Free Maintenance Of The Equipment From The Date Of Completion. The Equipment Should Be Approved By Engineer In Charge Before Installation At Site. Pictures Enclosed For Reference. 6 Providing, Installation Of Play Ground Equipment Multi Play Fun System- Special With Following Specification: A ) I ) The Trapezium Platform Shall Be Made Up Of The Gi Sheet 14 Swg. The Vertical Platform Support Pipes Shall Be Of 80 Nb Powder Coated Gi Pipes.Ii ) The Slide Entry Should Be Made Up Of 20 Nb Powder Coated Gi Pipe Mounted On 80 Nb And 20 Nb Nylon Clamp. Flange Width Of Platform Should Be 75 Mm. Iii ) 20 Mm X 3 Mm Dimples Should Be Embossed On Platform For Antiskid Surface. Stiffeners Made Up Of 14 Swg Gi Sheet Shall Be Provided Below Platform For Additional Safety. B ) Pipe Ladder 7 Ht.: I ) The Ladder Shall Be Made From 25 Nb Gi Pipes / ‘B’ Class Pipes And Should Have A Suitable Reinforcement To Maintain Strength And Avoid Bending. Ii ) The Top Surface Of The Ladder Should Be In Such Way That It Does Not Allow Any Kind Of Skiddy Movement.C ) 2 No.S Frp Wave Slide 7 Ht.: I ) The Wave Slide Chute Shall Be Made Up Of Fibre Reinforced Plastic Having Shell Thickness Of 5Mm, 10 Feet Long With Landing Module Parallel To The Ground. Ii ) The Backside Of The Slide Shall Be Coated With 3 Layers Of Resin For Smooth Finish And Should Be Supported By2 Small-H Of 25Nb Gi Pipe. Iii ) Ladder ( 1 Nos ) Main Frame Shall Be Made Up Of 25 Nb B Class Isi Make Gi Pipe & Hand Rail Of 20 Nb B Class Isi Make Gipipe. 4 Triangle Steps Should Be Provided For Easy Climbing Which Shall Be Made From 16 Swg Gi Sheet. D ) Frp Spiral Slide 7H: I ) Spiral Slide Chute Shall Be Made Up Of Fiber Reinforce Plastic Having Shell Thickness Of 4 Mm. The Back Side Of The Slides Is Surface Mat With Phanthom Effect Slide Is Supported On 80 Nb Center Support Gipipe. Landing Module Should Be Supported With 15 Nb Pipe.E ) Roto Crosss Railing Shall Be Made In Lldpe, Rotational Molding Process. I ) The Railing Should Be Supported By 20Nb Gi Pipes With Nylon Clamps.Ii ) All Welded Joints Should Be Properly Grounded And Coated With An Epoxy Sealant For Rust Resistance. All Sharp Edges And Cornersshould Be Grounded Before Painting. Powder Coat Should Be Done By First Coat Of Primer40-50 Micron Thickness And Top Coat Of Pure Polyester Powder With 70- 80 Micron Thickness. The Rates Shall Be Inclusive Of Cost Of All Materials ( Including Sand, Cement, Etc ) , Labour , Civil Works For Fixing, Appropriate Foundation, Transportation At Site, Etc And One Year Free Maintenance Of The Equipment From The Date Of Completion. The Equipment Should Be Approved By Engineer In Charge Before Installation At Site. Pictures Enclosed For Reference. 7 Providing, Installation Of Play Ground Equipment 7 Ht Net Rock Climber With Following Specification: I ) Net Rock Climber Frame Shall Be Made Up Of 40 Nb Gi B-Class Pipe With Net Made Up Of 19 Dia Pp Rope. Ii ) Ball Clamps And Rock Holds Shall Be Made Up Of Nylon And Rock Climber Shall Be Made Up Of Frp Having Inbuilt M.S Angle Frame. Iii ) All Welded Joints Should Be Properly Grounded And Coated With An Epoxy Sealant For Rust Resistance. All Sharp Edges And Cornersshould Be Grounded Before Painting. Powder Coat Should Be Done By First Coat Of Primer40-50 Micron Thickness And Top Coat Of Pure Polyester Powder With 70- 80 Micron Thickness. The Rates Shall Be Inclusive Of Cost Of All Materials ( Including Sand, Cement, Etc ) , Labour , Civil Works For Fixing, Appropriate Foundation, Transportation At Site, Etc And One Year Free Maintenance Of The Equipment From The Date Of Completion. The Equipment Should Be Approved By Engineer In Charge Before Installation At Site. Pictures Enclosed For Reference. 8 Providing, Installation Of Play Ground Equipment Balancing Bridge With Following Specification: I ) Balancing Bridge Side Frame Shall Be Made Up Of 40 Nb G.I Pipe With Side Support Made Up Of 40 Nb G.I Pipe. Ii ) 9 No Of Float Made Up Of Lldep Plastic Shall Be Fixed On 12 Mm Dis Wire Rope. Iii ) All Welded Joints Should Be Properly Grounded And Coated With An Epoxy Sealant For Rust Resistance. All Sharp Edges And Cornersshould Be Grounded Before Painting. Powder Coat Should Be Done By First Coat Of Primer40-50 Micron Thickness And Top Coat Of Pure Polyester Powder With 70- 80 Micron Thickness. The Rates Shall Be Inclusive Of Cost Of All Materials ( Including Sand, Cement, Etc ) , Labour , Civil Works For Fixing, Appropriate Foundation, Transportation At Site, Etc And One Year Free Maintenance Of The Equipment From The Date Of Completion. The Equipment Should Be Approved By Engineer In Charge Before Installation At Site. Pictures Enclosed For Reference. 9 Providing, Installation Of Play Ground Equipment Family Swing With Following Specification: I ) The Length Of Top Bar Shall Be 2.8M Long. Junction Box Should Be Designed In Such A Way, So As To Fix 2 No. Of Leg Pipe Made Up Of 40 Nb G.I Pipes In An Angle To Give Stability To Swing. Ii ) The Length Of Leg Pipe Should Be 2900 Mm. Special Design Pipe Plans Hold Casting Assembly With Noiseless And Smooth Momentbearing. Iii ) Round Cobalt Coated Short Link Chain Of 8 Mmdiameter ( Electric Butt Welded ) As Per Isi: 2429, Which Can Carry A Weight Of 400 Kg Shall Be Provided. The Chain Should Be Rubbrised. Iv ) S.S S-Hook Shoulde Be Used To Hang Chain In Rubber Belt. V ) Foot Rest & Back Rest Should Be Of 14 Guage G.I Strip, Swing Attached Pipebmade Up Of 40 Nb G.I Pipe & Special Designed Heavy Duty Bush & Ball Bearing Should Be Provided For Smooth Functioningof The Swing.Vi ) All Welded Joints Should Be Properly Grounded And Coated With An Epoxy Sealant For Rust Resistance. All Sharp Edges And Cornersshould Be Grounded Before Painting. Powder Coat Should Be Done By First Coat Of Primer40-50 Micron Thickness And Top Coat Of Pure Polyester Powder With 70- 80 Micron Thickness. The Rates Shall Be Inclusive Of Cost Of All Materials ( Including Sand, Cement, Etc ) , Labour , Civil Works For Fixing, Appropriate Foundation, Transportation At Site, Etc And One Year Free Maintenance Of The Equipment From The Date Of Completion. The Equipment Should Be Approved By Engineer In Charge Before Installation At Site. Pictures Enclosed For Reference. 10 Total Impact Of Gst For The Purpose Of Ctc
|