Contract Award Notice |
|
TRR | 7702340 |
Organization | Irrigation And Flood Control Department |
Tender No | e-Nit No 01/RCC Upper/RTIC Kathua 2022-23 |
Funded By | Self-Funded |
Country | India , Southern Asia |
Contract Value | 16,133 |
Work Detail |
Petty Works To Be Executed At Site As Per The Necessity / Demand / Emergent Nature For Up-Keeping Main Ravi Canal Rd 14312-24492M Incl Distributary, D- 1 And 2, Including Minors, Lakhanpur Pump House And Ravi Colony Kathua-Expression Of Interest For Maintenance Work Including Petty Works To Be Executed At Site As Per The Necessity / Demand / Emergent Nature For Up-Keeping Main Ravi Canal Rd: 14312-24492M Incl Distributary, D- 1 & 2, Including Minors, Lakhanpur Pump House & Ravi Colony Kathua- 1 Clearing Jungle Including Uprooting Rank, Vegetation, Grass, Brush Wood, Trees And Sapling Of Girth Upto To 30Cm Measured At A Height Of 1M Above Ground Level Andremoval Of Rubbish Upto A Distance Of 50M. Outside The Periphery Of The Area Cleared. 2 Weed Clearance From Canal Including Extraction Of Roots 3 Silt Clearance From Canals. Inclusive Of Initial Lead And Lift ( 50M & 1.5M Respectively ) ( A ) Dry 4 Silt Clearance From Canals. Inclusive Of Initial Lead And Lift ( 50M & 1.5M Respectively ) ( B ) Wet 5 Removal Of Dead Animals And Disposal At Safe Place Far From Locality As Per Direction Of Engineer In Charge 6 Deployment Of Jcb Machine Including Pol Charges For All Sorts Of Works, Not Measurable. 7 Earth Work In Rough Excavation Banking Excavated Earth Inlayers Not Exceeding 20Cm In Depth Breaking Clods Watering, Rolling Each Layers With 1 / 2 Tones Roller Or Wooden Or Steel Rammers, And Rolling Every 3Rd And Top Most Layer With Power Roller Of Minimum 8Tones And Dressing Up In Embankment For Roads, Flood Banks And Marginal Banks And Guide Banks Or Filling Up Ground Depressions, Level Up To 50M Andlift Up To 1.5M ( Excluding Rolling And Watering ) 8 Surface Dressing Of The Ground Including Removing Vegetation And In-Equalities Not Exceeding 15Cm Deep And Disposal Of Rubbish, Lead Upto 50M And Lift Upto 1.5M In All Kinds Of Soil 9 Supply Of Labour For All Sort Of Works As Per Requirement For Canal Syphons, Canal Section And Drainage Structure And Survey Work 10 Carriage / Disposal Of Mulba / Earth From The Peripherry Of Silt Cleared To Dumping Area Lead Upto 2.0 Kms 11 Earthwork In Excavation By Manual Means Over Areas ( Exceeding 30 Cm And Upto 1.5 M In Depth, 1.5 M In Width As Well As 10 M^2 On Plan ) Including Disposal Of Excavated Earth Upto 1 M From Cutting Edge, Disposed Earth To Be Leveled And Neatly Dressed ( In All Kind Of Soil ) 12 Filling E.C Bags With Sand / Earth, Including Cost Of Sewing And Strings, Excluding Cost Of Bags And Earth / Sand 13 Unloading Sand / Earth Filled Bags From Boatsa ) Placingin Dry 14 Unloading Sand / Earth Filled Bags From Boatsb ) Placingin Wet 15 Slip Clearance In Ordinary Soils Disposal Lead Upto 50M And Lift Upto 1.50M Respectively 16 Supply Of Stones 17 Providing And Layingcement Concrete1:2:4 ( 1 Cement:2 Coarse Sand : 4 Graded Stone Agg. 20Mm Nominal Size ) . Excluding The Cost Ofshuttering In Foundation Plinth 18 Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centring Andshuttering-All Work Upto Plinth Level. 1:3:6 ( 1 Cement : 3 Coarse Sand : 6 Graded Stone Aggregate 20 Mm Nominal Size ) Crushed. 19 Dumping Stone Excluding Cost Of Stones In Horizontal On Level. 20 Centering And Shuttering Incl. Strutting, Propping Etc And Removal Of Form Work For:A ) Foundations, Footings Bases Of Columns Etc For Mass Concrete. 21 Constructing Muthu Bunds, Comprising Boulders And Wood Bushes In Alternate Layes , Including Working In Water Situations. 22 Carriage Of Sand And Stone Aggregates From Source To Site Of Workav. Lead 10 Kms By Mechincal Transport 23 Carriage Of Nallah Stone From Source To Site Of Work Av. Lead 10 Kms By Mechincal Transport 24 Pumping Outwater Caused By Springs, Tidals Or River Seepage , Broken Water Mains Or Drains And The Like 25 Painting And Writing Of Gauges On Main Ravi Canal And Its Distributory 26 Cost Of Ec. Bags |
Key Dates |
|
Contract Date | 29 Jun 2022 |
Contact Information |
||||||||||||||||||||||||||||||||||||||||
View Notice Now...Login with your Social Account for Instant Access to this notice
|