Request For Demo     Request For FreeTrial     Subscribe     Pay Now

Fabrication And Erection Jobs Of Nakodar Csm-2 Replacement Of Worn Out M.S. Vertical Suppo...


Contract Award Notice

TRR 7618797
Organization Department of Cooperation
Tender No Fabrication And Erection Jobs of Nakodar CSM
Funded By Self-Funded
Country India , Southern Asia
Contract Value 2 Million

Work Detail

Fabrication And Erection Jobs Of Nakodar Csm-2 Replacement Of Worn Out M.S. Vertical Supporting Channels & Side Plate Of Final Molasses Storage Tank No. 2 With M.S Plate And Channels. 3 Strengthening Of Pans Shell With Angle And Channels In Round Shape With Ms Angle 75X75mm And Dia 4.34 Mtr. ( Two Rounds ) 4 Strengthening Of Evaporator Shell With Angle And Channels In Round Shape With Ms Angle 75X75mm And Dia 2.80 Mtr. ( Two Rounds ) 5 Dismantling, Fabrication, Erection Of Top Cone Below Save All Of Evaporators. 6 Dismantling, Fabrication, Erection Of Complete Save All ( Existing Design ) Of 2Nd Body Evaporators Including Top Plate, Inner And Outer Shell. 7 Dismantling, Fabrication, Erection Of Save All ( Existing Design ) Inner Plate Of 2Nd Body Evaporators 8 Dismantling, Fabrication, Erection Of Umbrella Of Save All Evaporator 4Th Body As Per Existing Design Including All Supporting. 9 Dismantling, Fabrication And Erection Of Quad Condensate Tank Including All Connection.Size Dia509mmxlength 1800Mm 10 Dismantling, Fabrication, Erection Of Hot Water Receiving Tank Of Water Weighing Scale. The Erection Work For This Job Will Also Include All Connections Which Are Dismantled During Dismantling. 11 Dismantling, Fabrication & Erection Of Juice Feed Boxes Of Juice Heater Double Bead Valve. The Erection Work For This Job Will Also Include All Connections Which Are Dismantled During Dismantling. 12 Dismantling, Fabrication & Erection Of Absorption Tower Of Syrup Sulphiter. The Erection Work For This Job Will Also Include All Connections Which Are Dismantled During Dismantling 13 Dismantling, Fabrication & Erection Of Worn Out Stainer Of Juice Sulphiter Pump. 14 Dismantling, Fabrication & Erection Of Worn Out Portion Of Bottom Cone Of Juice Sulphiter 15 Dismantling, Fabrication And Erection Of Melter Of Sulphur Furnace As Per Existing Design. This Work Include Dismantling And Erection Of All Connections, Man Hole, Flanges Etc. 16 Dismantling, Fabrication And Erection Of Scrubber Of Sulphur Furnace As Per Existing Design. This Work Include Dismantling And Erection Of All Connections, Man Hole, Flanges Etc . 17 Dismantling, Fabrication & Erection Of Dorr Coils ( Nipple / Flange / Reducer Rates As Per General Fabrication, Erection Rates ) 18 Dismantling, Fabrication & Erection Of Dorr Compartment Shell With Ms Plate Channel Angles. The Erection Work For This Job Will Also Include All Connections Which Are Dismantled During Dismantling. 19 Dismantling, Fabrication & Erection Of Dorr Compartment / Chamber Roof With Ms Plate Channel Angles Supports. The Erection Work For This Job Will Also Include All Connections Which Are Dismantled During Dismantling. 20 Dismantling Fabrication And Erection Of Base Plate Of Mud Boot Of Dorr To Make It Leak Proof. 21 Replacement Of Sealing Ring Of Dorr Mud Boot 22 Dismantling, Fabrication And Erection Of Mud Tank Below Rvf Including All Connections. 23 Dismantling, Fabrication And Erection Of Clear Juice Feed Box Along Its Telescopic Valve Of Dorr. 24 Dismantling, Fabrication And Erection Of Worn Out Heavy / Light Vacuum Tank Of Rvf Including All Connections. 25 Dismantling, Fabrication And Erection Of Base Plate Of Dorr Compartment With Their Supporting Angle / Channel Etc 26 Dismantling, Fabrication & Erection Of Filter Juice Sealing Bottles Of Receiving Pit For Vacuum Filter. The Erection Work For This Job Will Also Include All Connections Which Are Dismantled During Dismantling. 27 Dismantling Fabrication And Erection Of Ms Barometric Condenser Of Rvf. This Job Will Include All Connections Which Are Dismantled During Dismantling. 28 Dismantlingfabrication And Erection Of Bagacillo Pipeline From Ms Plate 3Mm 29 Dismantling, Fabrication & Erection Of Bagacillo Cyclone. 30 Dismantling, Fabrication & Erection Of Bagacillo Chute. 31 Dismantling, Fabrication & Erection Of Bottom Trough Of Mud Mixer For Rvf 32 Dismantling, Fabrication & Erection Of Screw Conveyor Of Mud Mixer 33 Dismantling, Fabrication And Erection Of Ms Vapour Pipe Of Different Sizes.1 ) Dia- 1050Mm 34 1 ) Dia - 900Mm , 35 2 ) Dia - 720Mm 36 3 ) Dia – 620Mm 37 4 ) Dia – 520Mm 38 Dia – 420Mm 39 Dismantling, Fabrication & Erection Vapour / Exhaust Pipe Bend 900Mm Dia 40 Dismantling, Fabrication And Erection Of Distance Piece Of Ms Vapour Pipe Length Up To 1.5 Mtr.1 ) Dia- 1050Mm 41 1 ) Dia - 900Mm , 42 2 ) Dia - 720Mm 43 3 ) Dia – 620Mm 44 4 ) Dia – 520Mm 45 Dia – 420Mm 46 Dismantling Of Ms / Ci Condenser Cone Of Pans 47 Fabrication Of Ms Condenser Cone Ofpans 48 Erection Of Ms / Ci Condenser Cone Of Pans 49 Dismantling, Fabrication, Erection Of Umbrellas Of Pan Save All As Per Existing Design Including All Supporting. 50 Replacement Of Worn Out Portion Of Bottom, Side Plate & Supporting Angle / Channel Of Syrup And Molasses Tank At Pan Station 51 Replacement Of M.S Plate Gutter Of Crystallizer Station And Other Factory Units. 52 Replacement Of Worn Out Portion Ofpan Soucer 53 Dismantling, Fabrication And Erection Of Downtake Of Pan From 10 / 12Mm Plate 54 Replacement Of Feed Box Of Pans Including All Connections 55 Dismantling, Fabrication And Erection Distributor Of Pans 56 Dismantling, Fabrication & Erection Of Worn Out Portion Of Molasses Conditioner. This Work Includes Dismantling And Erection Of All Connection Pipes And Their Drive Unit. 57 Dismantling, Fabrication And Erection Of Worn Out Bottom Portion Of Crystallizer 58 Fabrication And Erection Of Catcher For C-Vacuum Crystallizer. 59 Replacement Of Crystallizer Arms Along With Supports From 75X75mm M.S Angle. ( A ) Dismantling 60 ( B ) Fabrication 61 ( C ) Erection 62 Dismantling, Fabrication & Erection Of Cooling Coils Of Crystallizer Including All Connections. 63 Dismantling And Erection Of Branch Pipes Of Spray Pond. This Work Include All Connections Of Clusters, 64 Dismantling Of Ci / Ms Main Pipeline Spray Pond 65 Dismantling Fabrication & Erection Of Suction Pipes Of Injection Pumps With Stainer. 66 Dismantling Fabrication & Erection Of Suction Pipes Of Spray Pumps With Stainer. 67 Dismantling , Fabricationerection Of Worn Out Bottom Half Portion Of B Magma Mixture Including Allconnections. 68 Dismantling, Fabrication And Erection Of Worn Out Bottom Half Portion Of A Pug Mill Including All Connections. 69 Dismantling, Fabrication And Erection Of Worn Out Portion Of Sugar Hopper Along With Its Alignment. Size 4’ Wide X 2 Mtr Length 70 Dismantling, Fabrication And Erection Of Sugar Melter Pump Stainer Including All Connections 71 Fabrication And Erection Of Bed For Pump And Motor Of Magma Mixture Along With Suction And Delivery Pipe Line Connections, Alignment Of Motor With Pump Etc. 72 Modification Of Bagacillo Screen For Easy Operation With Fitting Of Ball Bearings, Wheels & Guides In All Respects. 73 Dismantling, Fabrication And Erection Of Bottom Discharge Chute Of Continuous Centrifugal Machine 74 Fabrication And Erection Of New Syrup Tank At Pan Station Including All Connections. 75 Dismantling, Fabrication And Erection Of Ammonia Coils Of Pans From Ms Pipedia 3”Including All Connection 76 Dismantling And Erection Of Tube Plate ( Top And Bottom ) 2Nd Evaporator Body Including Fabrication & Erection Of Downtake Including All Connections 77 Dismantling And Erection Of Calendria With Tube Plate ( Top And Bottom ) Of Pan No. 4 Including All Connections Alongwith Fabrication & Erection Of Downtake And Dismantling & Erection Of Distributor. 78 Fabrication And Erection Of Beds For Pump And Motor Etc. 79 Dismantling And Erection Of Crystallizer Shaft Including Arms And All Connections, Fittings. 80 Dismantling, Fabrication And Erection Of Internal Platesof Catcher Forsemi Kestner 81 Dismantling And Erection Of Fabricated Globe Valve 30 “ In Exhaust Line Of Vapour Cell. 82 Dismantling, Fabrication And Erection Of Quad Body Outer Shell Including All Connections. 83 Dismantling, Fabrication And Erection Cane Cutter Hoods From 8-10Mm Thick Plate With Ms Angles Etc. 84 Dismantling And Erection Of Expansion Joint Of Power Turbine Exhaust Line. 85 Replacement Of Side Plates Of Cane Carrier Chain / Rbc And Trough Of Rbc / Bagasse Elevator. 86 Replacement Of Channel And I-Beam Of Rbc / Cane Carrier / Bagasse Elevator / Cross Rbc Runner 87 Dismantling, Fabrication Erection Of Juice Tray Of Mill No. 2 From Ms Plate 88 Fabrication Of Screw Conveyor Of Mill House 89 Dismantling, Fabrication Erection Of Ash Hopper Of Boiler ( Pyjamas ) Cone With Chute Bottom Portion ( Cone Tapper Portion Size 15” Approximate ) 90 Dismantling, Fabrication Of Trough Of Screw Conveyor, Assembly Of Screw Conveyor With Trough & Its Erection. 91 Repair Of Rotary Bagasse Feeders Of Boilersa ) Body 92 B ) Rotor 93 Replacement Of Side Plate 3Mm / Old Ms Plate Of Boiler ( With Ms Plate & Supporting Angle / Flat ) 94 Dismantling, Fabrication & Erection Of Worn Out Ducting Of Boiler & Apcd Including Angle, Channel, Flats& Flanges 95 Dismantling, Fabrication & Erection Damper Of Boiler Ducting 96 Dismantling Fabrication & Erection Of Expansion Jointof Boiler Ducting ( 3.360 Mtr X 1.260 Mtr ) 97 Replacement Of Ms Gutter Of Apcd Plant From Wet Scrubber To Ash Pits 98 Dismantling Fabrication & Erection Of Damper Of Rotary Bagasse Feeder 99 Dismantling, Fabrication & Erection Of Worn Out Portion Of Id And Apcd Fan Casing 100 Replacement Of Sieve Plates Of Apcd Scrubber. This Job Also Includes 10 / 12Mm Holes ( 324 Holes Per Square Ft. ) Drillingin Plates 101 Baffle Plates ( Ms Flat 65 X 6Mm ) Of Demister In Wet Scrubber 102 Repair / Replacement Of Wornout Portion Of Wet Scrubber Of Boiler No. 1 & 2 103 Dismantling Fabrication And Erection Of Receiving Tank / Sum Tank / Sealing Tank Of Wet Scrubber. 104 Replacement Of G.I Sheet Gutter Of Factory Building 105 Replacement Of Worn-Out Of M.S. Runner Of Inter Carrier, Elevator, Rbc , Cross Carrier & Cane Carrier Chains 106 Juice Heater / V.L.J.H. Tubes A ) Dismantling 107 B ) Fitting 108 Semi Kestner Tubes A ) Dismantling 109 B ) Fitting 110 Quad Bodies Ss Tubes1st To 4Th A ) Dismantling 111 B ) Fitting 112 Pans Tubesss 1St To 5Th A ) Dismantling 113 B ) Fitting 114 Welding Joints Of Water , Juice , Vapor And Exhaust Pipe Line Of Exhaust Pipe Lines Of All Sizes. 115 Ms Pipe Line 1 / 2 To 12” Diaa ) Dismantling 116 B ) Erection 117 Ss Pipe Line 1 / 2 To 12” Diaa ) Dismantling 118 B ) Fabrication 119 C ) Erection 120 Ci Pipe Line 1 / 2 To 12” Diaa ) Dismantling 121 B ) Erection 122 Ms Pipe Line Above 12” Dia From Ms Plate ( Other Than Vapour Pipe Of Pan And Quad ) A ) Dismantling 123 B ) Fabrication 124 C ) Erection 125 A ) Ms Bend Upto 12” Dia A ) Dismantling 126 B ) Fabrication 127 C ) Erection 128 B ) Ms Bend Above 12” Dia From Ms Plate ( Other Than V.P. Pans & Quad ) A ) Dismantling 129 B ) Fabrication 130 C ) Erection 131 Ci Bends Sizes 1” To 6”A ) Dismantling 132 B ) Erection 133 Dismantling, Fabrication& Erection Of M.S ( All Sizes ) A ) Tee, 134 B ) Nipples, 135 C ) Crosses 136 D ) Reducers 137 E ) Elbow 138 Dismantling, Fabrication& Erection Of S.S ( All Sizes ) A ) Tee, 139 B ) Nipples, 140 C ) Crosses 141 D ) Reducers 142 E ) Flange 143 F ) Elbow 144 G ) Bend 145 Replacement Of Wornout Ms Cone ( All Sizes ) 146 Ms Flanges ( All Sizes ) A ) Dismantling 147 B ) Fabrication 148 C ) Erection 149 Dismantling , Fabrication And Erection Of Manholes ( All Sizes ) 150 A ) Dismantling Of Platform Plate 151 B ) Fabrication & Erection Of Platform Plate 152 M.S. Tankhaving Round & Conical & Rectangular Bottomsa ) Dismantling 153 B ) Fabrication 154 C ) Erection 155 M.S Structure Trusses, Perlins, Columns & Beams ( Factory Building ) A ) Dismantling 156 B ) Fabrication 157 C ) Erection 158 Platform Railing From Old Pipe & Angle A ) Dismantling 159 B ) Erection 160 Patch Work Of Any Part Of Any Equipment With 3Mm To 10Mm Thick Plate Max. Upto 1 Sq Meter 161 Dismantling Of Sluice Valve / Angle Valve / N.R.V. 162 Erection Of Sluice Valve / Angle Valve / N.R.V. , Butterfly Valve 163 Replacement Of Rail Line Of Caneunloaderwith 50Mm Square Bar

Key Dates

Contract Date 17 Jun 2022

Contact Information

Company Name
Awarded Bids List
S.No Bid Number Bidder Name Awarded Currency Awarded Value
1 415697 Riyajul Contractor INR 0.00
2 415698 Mohd Wahid Industries INR 0.00
Contract Value 2 Million
Contract Date 17 Jun 2022

Complete details of the selected Tender
Organisation Name : Vijaya Bank
Organisation Type : Public Sector Banks Ministry : Ministry of Finance
Tender Ref. No : DIT/DELHIARMB/07052016/1
Tender Title : E-Auction Sale Notice for the properties of M/s Guru Kripa Iron Trading Pvt Ltd, mortgaged to Vijaya Bank and taken possession under the provisions of SARFAESI Act 2002.
Product Category : Land/Building
Sub Category :
Tender Value (INR if not mentioned):
Rs 1,62,00,000/-
EMD :
1620000
Document Cost :
0
Tender Type : Auction
Location : Delhi
First   
Announcement Date :
5-July-2016  
Publication Date on Portal: 5-July-2016 At : 8:03:09 PM  
Last Date of Document Collection :  
8-August-2016 Up To : 5:00 PM  
Last date for  
Submission :
8-August-2016 Up To : 5:00 PM  
Opening Date : 10-August-2016 At : 11:00 AM  
Work Description :
Pre-Qualification :
PreBid Meet Date : --
Tender Document : View Document *
Bid Document : Document Not available
Tech. Document : Document Not available
Sector : Banking, Finance & Insurance
State : Karnataka
 
For further Information Contact:
Name : Santhosh Aili
E-Mail : cbsprog11@vijayabank.co.in
Phone Office : 08025584066
Fax : 08025582747
Address :
City : Bangalore

  download Adobe® Reader®
Adobe® and Get Adobe® Reader® logo are trademarks or registered trademarks of Adobe Systems Inc. in the US and/or other countries.

View Notice Now...

Login with your Social Account for Instant Access to this notice


Tell us about your Product / Services,
We will Find Tenders for you