Request For Demo     Request For FreeTrial     Subscribe     Pay Now

Fabrication And Erection Jobs Of Bhogpur Csm- 1 Bhogpur Csm 2 Fabrication And Erection ...


Contract Award Notice

TRR 7444332
Organization Department of Cooperation
Tender No Fabrication And Erection Jobs of Bhogpur CSM
Funded By Self-Funded
Country India , Southern Asia
Contract Value 8 Million

Work Detail

Fabrication And Erection Jobs Of Bhogpur Csm- 1 Bhogpur Csm 2 Fabrication And Erection Of Cane Unloader Bridge Platform 3 Dis, Feb, & Errection Of Umbrella Of Pan Along With Its Supports. 4 Dismantling, Fabrication & Erection Of Vapour Pipe 700Mm And 900Mm& 1000 Mm From 8 / 10Mm Thick Plate. 5 Rmp Pipes & Clusters Replacement Of Spray Pond.Pipe 6 B ) Cluster 7 C ) Reducer 8 D ) Blind 9 Dismantling Of Spray Pump Header, Fabrication, Erection And Fitting Ofpumps Etc 10 Fabrication & Erection Of Bagasse Elevator Stair Case & Platform 11 Replacement Of Brass / Ss Tubes Of Pans 12 Dismantling And Erection Of Various Sizes Of Ms And Gi Pipe Lines Up To 1 3 / 4 Dia 13 Dismantling And Erection Of Various Sizes Of Ms / Gi Pipe Lines From 2’’To12” Dia. 14 Dismantling, Fabrication And Erection Of Ms Pipe Above 12’’ Dia From Msplate And Shifting / Dragging It As Per Direction. 15 Fab.And Fitting Of Ms Flange Complete With Holes By Drilling Up To 12’’Dia 16 Fab.And Fitting Of Ms Flange Complete With Holes By Drilling Above 12’’Dia 17 Dis. And Cleaning Of Ms Flange From Old Pipe Lines. 18 Fabrication And Erection Of Following Items From Ms Pipe Up To 12” Dia.A ) Ms Nipple 19 B ) Ms Bend 20 C ) M S Tee 21 D ) Ms Cross 22 E ) Ms Reducer 23 F ) M S Cone 24 Fabrication And Erection Of Following Items From Ms Pipe Up To 12” Dia.A ) Ms Nipple 25 B ) Ms Bend 26 C ) M S Tee 27 D ) Ms Cross 28 E ) Ms Reducer 29 F ) M S Cone 30 Dismantling And Fitting Of Gi / Acc Sheet.Dismantling 31 Fitting 32 Dismantling Of Machinery And Structure As Instruction Of Ce 33 Fabrication And Erection Of Machinery And Structure. 34 Erection Of Machinery 35 Patch Work Of Different Equipments Such As Cane Carrier, And Intercarrier. 36 Dismantling And Erection Of Worn-Out Runners Of Cane Carrier, Rbc, Bagasse Elevator And Inter Carrier 37 To Straight The Old Damaged Vapour Pipe And Round Tank For Platform. 38 Dis, Feb, & Errection Of Steam Coil Of Molasses Storage Tank At Pan Stationsize 1” To 2”. 39 Dis, Feb, & Errection Of Juice Coil Of Juice Clarifier Size 4”, 5” & 6” Alongwith Its Nipple. 40 Dis, Feb, & Errection Of Open & Closed Crystallizers Arms 41 Dis.Feb & Eraction Of Wt. Juice Sulphited Juice Stainer 42 Dismantling, Fab. & Erection Of Ss Pipe Up To 12’’ 43 Dismantling, Fab. & Erection Of Following Items Upto 12’’ Of Ssss Nipple, 44 Ss Bend 45 Ss Tee 46 Ss Cross 47 Ss Reducer 48 Ss Cone 49 Dismantling, Fab. & Erection Of Ms Flat ( Runner ) , Cane Carrier, Rbc Chainetc. 50 Dismantling, Fab. & Erection Of Motor Bed With Alignment 51 Dismantling Of Complete Exiting Calendria 600 M2 H.S. & Each Tube Alsocomplete To Be Dismantling. 52 Erection Of Milk Of Lime New Hopper Along With Staging , Platform &Drive. Fitting Of Wooden Strips 53 Fabrication & Erection Of 30 Tons Capacity Sugar Melter Completescope Of Worka- Work To Be Completed As Per Drawing.B- Fabricate & Erection Of Ms 10 Mm Thick Plate Of App Size:3.5Mx3.5 Mc- Fitting Of Stirrer Drive.D- Fitting Of Perforated Plates Having Hole Dia 1.5 Mm Allalong The Platese- Drive Stirrer To Be Mounted Along With Shaft & Ss Ball 2.0Inch Ball.F- Fabricate & Erect Of Steam Coil 02 Nos. Periphery Insidethe Drumg- Fabrication Of Staging On Which Drum To Be Mounted.H- Outlet Pipe 12.0 Inch Dia Tobe Provided.I- Steam Coil Along With Nrv & Valves To Be Fitted.J- Hot Water Connection To Be Made Along With Valves.K- Dismantling Of Reduction Gear & Motor & To Be Fitted On Itfrom Old Mill.L- Alignment Of Reduction Gear To Be Made With Motor.M- Repair Of Reduction Gear.N- Water Trial Of Complete Unit.O- Fabrication & Erection Of Platform 54 Magma Mixture For Brown Sugar Reprocessingscope Of Worka- Dismantle The Magma Mixture From Old Mill And To Erect Atsuitable Place At New Mill.B- Dismantle & Erection Of Magma Pump, Molasses Pumpalong With Pump Beds.C- Fabrication Of Staging And Platforms Along With M.S. Stairs.D- Dismantle Of Stirrer Drive And Erection Of It Along Withmotor.E- Trial Of Complete Unit. 55 Dismantling & Fitting Of Ss Tubes In Calendriasize: 45Mm Odx1.2Mm Thickx2010mm Long 56 Size:98 Mmodx1.6Mm Thickx905 Mm Long 57 Dismantling, Fabrication And Erection Of Pansave-All Top Plate 58 Shifting & Erection Of Seed Mixture At New Millscope Of Worka- Dismantle Of Dry Seed Mixture From Old Factory.B- Erection Of Same Along With Drive At The Top Of Dry Seedcrystallizer At New Millc- Proper Staging To Be Made.D- Hot Water Connection To Be Made. 59 Dismantling, Fabrication And Erection Of Drain Gutter Of Sugar Drierhouse 60 Replacement Of Sugar Hopper Plates Of All 03 Nos.Scope Of Worka- Dismantle Of Old Worn Out Plates.B- Fabricate Of New Plate Of Hopper Of 05 Mm Thick According Toexisting Size.C- Proper Strengthening Of Plates.D- Erection Of Complete Hopper Along With Accessoriese- Fitting Of Crank Shaft With Crank Shaft.F- Fitting Of Rori Jail Along With Frame.G- Fitting Of Powder Sugar Jali With Frame. 61 Shifting Of Old Sugar Hopperscope Of Worka- Dismantling Of Old Sugar Hopper From Old Factory Along Withdrive.B- Erection Of Hopper At New Mill Site In Dryer House.C- Refurbishment Of Hopper Plates.D- Fitting Of Wooden All Stripse- Erection Of Connecting Rod Along With Drive.F- Accessories To Be Made Relating To Hopper 62 Planetary Gear Boxerection Of Planetary Gear Box At Crystallizer 63 Replacement Of Central Shaft.Fabrication & Erection Of Shaft, Along With Helis Type Stirrer Of B Vacuumcrystallizer 64 Erection Of Gear Operated Butterfly Valve In Place Of Discharge Valve Inpans 65 Fabrication & Erection Of Pneumatic Shoot 66 Erection Of Pneumatic Clamps 67 Replacement Of Old Gate Valve With New Gate Valve Of Crystallizers 68 Dismantling Of Double Beat Valve And Erection Of Same Of Juice Heater At Existing Site. 69 Shifting Of Nk-1100 Continuous Centrifugal Machine Along With Pug Mill, Magma Mixture, Magma Pump, Molasses Pump And Pipe Line From Oldplant To New Plant.Scope Of Work:A- Dismantling Of Nk-1100 Continuous Centrifugal Machine Fromold Mills At Existing Site Along With Magma Pump, Molassespump, Drive, Motor, Foundation Beds, Pipe Lines , Pugmill Alongwith Drive, Magma Pump Along With Its Drive From Old Mills.B- Dismantle Of Existing Staging Of Machine, Pug Mill, Magmamixture Etc.C- Erection Of Nk-1100 Continuous Centrifugal Machine Along Withaccessories At Mill At Suitable Place.D- Rebufbishment Of Any Parts Seems Weak To Be Carried Out.E- Water Level To Be Madef- Erection Of Motor Bed Along With Motor.G- -Erection Of Pugmill, Magma Mixture, Magma Pump, Molassespump Along With All Drives , Foundation Bed Relating To Machine.H- Proper Platform To Be Made.I- Complete Water Trial Of Unit 70 Shifting & Erection Of Cfw Continuous Centrifugal Machine From Old Millto New Millscope Of Worka- Dismantling Of Pug Mill Along With Drive.B- Dismantling Of Centrifugal Machine Along With Motor.C- Dismantling Of Magma Mixture Along With Drive.D- Dismantling Of Magma Pump & Molasses Pump Along With Foundation Bed.E- Erection Of Machine In New Mill Along With Motorf- Erection Of Pug Mill Along With Drive.G- Erection Of Magma Mixture Along With Drive.H- Erection Of Magma Pump & Molasses Pump Along With Drive.I- Erection Of Staging & Platform To Be Done.J- Complete Trial Of Units. 71 Shifting & Erection Of Air Compressors & Super Heater Wash Watersystem From Old Mill To New Millscope Of Work:A- Dismantling Of Air Compressors Along With Motors.B- Dismantling Of Its Pumps & Motorc- Dismantling Of All Accessoriesd- Erection Of Air Compressors Along With Motorse- Erection Of Pumps And Motors 72 Shifting & Erection Of Injection Pump With Motor From Old Mill Tonew Plant. 73 Dismantling Of Mud Mixture From Old Mill And To Erect The Same Innew Mill At Vacuum Filter Station Along With Accessories With Related Connection. 74 Dismantling Of Transient Heater From Old Mill And To Erect Thesame In New Mill At Centrifugal Station Along With Accessories Withrelated Connection. 75 Dismantling , Fab.& Erection Patch Work Of Inter Rake Carrier Side Plate 76 Dismantling , Fab.& Erection Main Bagasse Carrier Trough & Side Plate 77 Fabrication & Erection Of Bagasse Elevator Stair Case &Platform 78 Fabrication & Erection Of Factory Structure Complete Window ( Frame &Grills ) 79 Dismantling , Fab. & Erection Of Mill House & Boiler House Plate Form 80 Modification, & Erection Of Mill House Rotary Screen Inlet Juice Tank& Platform 81 Fabrication And Erection Of Excess Bagasse Carrier To Rbc As Per Thedirction Of Ce Scope Of Work ( A ) Fabrication And Erection Of Column And Structure For Belt Conveyor , Along With Drive System And Discharge Chute To Rbc Column And Steelstructure 82 ( B ) Dismantling Of Belt Conveyor And Its Structure Along With Drivecomplete In All Respect 83 Dismantling , Shifting & Erection Of Old Plant Bagasse Yard Shed To New Plant Bagasse Yard 84 Fabrication And Erection Of Cooling Tower Structure And Shed 85 Shifting & Erection Of Cane Unloder Trolly Gear Box With Motor Old Plant To New Plant 86 Fabrication And Erection Of Excess Bagasse Carrier To Rbc As Per The Dirction Of Ce Scope Of Work 87 Dismantling & Erection Of Following Items From C.I Pipe Up To 12” Dia.A ) C.I Bend 88 B ) C.I Tee 89 C ) C.I Cross 90 Dismantling And Erection Of Various Sizes Of C.I Pipe Lines From 2’’To 12” Dia. 91 Dismantling , Shifting & Erection Of Old Plant Cane Carrier Unloader Shed To New Plant Unloder Shed 92 Dismantling , Fab. & Erection Of Mbc Motor Bed With Alignment 93 Fab. & Erection Of Electrical Poll 94 Modification, & Erection Of Boiler Prds Line 95 Modification Of Mud Mixture Scope Of Worka- To Increase Length 1.2 Meter Of Mud Mixture Shell.B- To Increase Stirrer Length 1.2 Meter Lengthc- To Erect All Connecting Pipe Lines.D- To Fabricate & Erect Scroll Up To The Length Of Mud Mixture.E- Shifting Of Outlet Mud Withdrawal Pipes. 96 Filtrate Juice Receiving Tank Scope Of Worka- Filtrate Juice Tank Dia1900mmx1260mm Height To Be Fabricated And Erected To Increase The Height Of Tank.B- All Connecting Pipe Lines ( Having 3.0Dia ) To Be Re-Erected After Dismantling Of Lines, Valve Etc Which Were Dismantled.C- All Suction Connections Of Pumps To Be Made. 97 Dismantling Of Syrup Pipe Line And Re-Fitting After Cleaning The Same. A- Dismantling 98 B- Refitting 99 Sugar Hopper ( App.45Meter ) A-Dismantling 100 B ) Fabrication 101 C ) Erection 102 Butterfly Valvea- Dismantling 10Inch Dia To 16.0 Inch Dia 103 B- Erection 10Inch Dia To 16.0 Inch Dia 104 Sluice Valvea- Dismantling 10Inch Dia To 16.0 Inch Dia 105 B- Erection 10Inch Dia To 16.0 Inch Dia 106 A- Dismantling And Erection Of Transient Heater From Old Mill To New Mill 107 B- Dismantling Of Transient Heater From Existing Site At New Mill 108 Fabrication Of Multi Tray Of Sugar Hopper Wide 1.5 Meter 109 Erection Of Top &Bottom Tube Plates Of Evaporator Body Along With Tie Rods. 110 Fabrication & Erection Of Calendria Shell Of 600 Square Meter Along With Down Take, Vapour Pipe, Non Condensable Gas Pipe Line, Clear Juice Inlet Outlet Juice Connection. 111 Dismantling Of Reduction Gear, Motor, Stirrer Shaft Of Juice Sulphiter From Old Mill To New Mill. 112 Fabrication And Erection Of Monkey Ladders 113 Erection Of Flow Meter Valve Dia 6.0 Inches 114 Erection Of Sludge Pump Along With Pumps Size: 4X4 Inches 115 :6X6 Inches 116 Dismantling, Fabrication & Erection Of Gate Valve Of Crystallizersize: 08 Inches 117 Size :10 Inches Dia 118 Dismantling , Fabrication And Erection Of Distributor Of Pan 119 Fabrication & Erection Of Wire Netting Frame And Its Wire Netting 120 Fabrication & Erection Of Sugar Tray Of Hopper Under Neath Hopper No.3. 121 Dismantling , Erection Of Butterfly Valves In Place Of Old Discharge Valve Along With Modifications Of Massecuite Gutter. 122 Erection Of Chimney Of Juice Sulphiter ( 8.0 Inch Dia ) And Clarifier ( 10.0 Inch Dia ) 123 Modification Of Juice Box Of Clarifier Juice Outlet Pipes To Be Decreased By 200Mm Dia Height ( 104 Nos Pipes ) 124 Modification Of Syrup Sulphiter Scope Of Worka- Holes To Be Increased From Existing Perforated Plates 03 Nos. Plates Of Recovery Tower ( 600Mm Dia Plate ) B- Holes To Be Increased From Existing Plates Of Drums ( Big &Small Plates ) .C- So2 Gas Pipe Lines To Be Modified.D- Spurger Of So2 Gas Inside The Drum To Be Modified.E- Flanges To Be Provided Inside The Ss. Pipes.F- Man Holes Having Dia 500 Mm 03 Nos. To Be Provided.G- Dismantling Of 2.0 Inches Dia. Pipes And Erection Of 4.0 Inches Dia To Be Erected . ( App. Length. 18 Meter ) H- Dismantling And Erection Of Bend Of Outlet Syrup Lines ( 12.0 Inches Dia ) 125 Sulphur Furnacescope Of Worka- Dismantling Of Top Cover Of Furnace To Be Opened.B- Baffle Plate To Be Shifted 400 Mm From Existing Site .C- New 6.0 Inches Widex1200 Mm Plate To Be Fitted.D- Dismantling And Erection Of Ms After Burner.E- Dismantling, Repair And Erection Of Coolers 02 Nos. Of So2 Pipesf- Dismantling And Erection Of Distributor Pipeg- Dismantling And Erection Of So2 Pipes 126 Side Catcher Of Juice Sulphiterscope Of Worka- Dismantling & Refitting Of Old Top Coverb- Dismantling Of Internal 12 Inches Pipe Up To Length Of Catcher.C- Dismantling, Fabrication , Erection Of Manhole Along With Cover 500Mm Dia. 127 Pans- 6 Nos Scope Of Worka- Brass Tubes To Be Taken Out After Breaking Out From Expand.B- Fitting Of Ss Tubes And To Make Leak Proof From Expand.C- All Tubes To Be Made Leak Proof From Expand.D- Calendria To Be Hand Over After Testing Of Normal Pressure For Hydraulic Testing To Mill Fitter. 128 M.S. Manhole With Blind Coversdismantling 129 B ) Fabrication 130 C ) Erection 131 Scroll For Mud Mixture App 3.0 Meter Long And Scroll Dia 600 Mma- Dismantling 132 B ) Fabrication 133 C ) Erection 134 Fabrication & Erection Of Deflection Cone In Centrifugal Machines With Proper Angle 135 Fabrication Of Water Header Along With Nipples For Supply Of Hot Or Cold Water To Centrifugals 136 Vapour Line Juice Heaterscope Of Worka- Blind To Be Provided In Both Inlet And Outlet Vapour Pipe Of Quad.B- Hydralic Testing To Be Done.C- After Testing Of Vljh , Blind To Be Taken Out. 137 Fabrication Of Window With Double Door Along With Hinges And Kundi 138 Pan Condensate Tankscope Of Worka- Dismantling Of Old Condensate Tank From Old Mill.B- Shifting This Tank From Old Mill To New Mill.C- Dismantling Of Worn Out Pan Condensate Tank From Existing Site Of New Mill.D- Erection Of Pan Condensate Along With Modification . 139 Spray Pump 2000 M3 / Hrscope Of Worka- Dismantling Of Old Spray Pump From Old Millb- Erection Of Same At New Mill.C- Modification Of Strainer Of Tail Pipe.D- Dismantling Of Ms Pipe App Lengthe- Erection Of Ms Pipe Pipe.F- Erection Of Butterfly Valve. 140 Modification In Sugar Grader Scope Of Gradera- Modification In Ss Wirenetting Framesb- Dismantling Of Worn Out Of Sealing Plates , Fabrication And Erection At Existing Place.C- Modifications In Hooks. 141 Shifting Of Ms Stairs With Modification Of Sugar Grader 142 Dismantling Of Stairs From Unloader Side Old Mill And Erection At Sugar Grader At New Mill After Modification 143 Fabrication Of Erection Of Double Beat Valve Flange 8.0 Inches Dia 144 Juice Sulphiter Receiving Tanka- Fabrication And Erection Of Cover Plateb- Fabrication And Erection Of Man Hole With Blind Cover 500 Mmdia.C- Ladder To Be Providedfrom Ground Floor Uptothe Height Of Receiver. 145 Erection Of Railing 146 Dismantling & Shifting Of Valves From Old Mills And Fitting At New Mills 08, 10, 12, 14, 16, 18, 20, 22, 24 , 26, 28, 30 Inches Diaa- Dismantling 147 B ) Fabrication 148 C ) Erection 149 Modification In Telescope Valve Of Mud Side, Replacement Of Worn Out Bottom Plate. 150 Cold Air Blowera- Modification In Bed 151 B- Dismantling And Erection Of Blower 152 Strengthening Of Angle Iron Channel 153 Erection Of Angle Channel In Side The Sugar Elevator / Dry Seed Elevator. 154 Shifting Of Pan Condenserscope Of Worka- Dismantling Of Old Pan Condenser Alongwith Tail Pipe From Old Millb- Dismantling Of Existing Condenser Of Pan No. 5 From New Mill.C- Erection Of Same In Place Of Pan Condenser Of Pan No.5 At New Mill. 155 Dismantling & Erection Work Of M / C Gutter 156 Dismantling & Erection Of Air Compressor Tank 157 Erection Of Sugar Elevator Window Both Side 158 Fabrication And Erection Of Shed For Etp Station Electrical Panel And Motor Pump 159 Fabrication And Erection Of Shed For Dryer Housesize 85Feet X35 Feet 160 Shifting And Erection Of Continuous Centrifugal Machines Without Pug Mill And Magma Mixture From Old Mill To New Mill.Scope Of Work.A- Dismantling Of Centrifugal Machines Along With Motor.B- Erection Of Machines In New Mill Along With Motorc-Erection Of Staging & Platform To Be Doned- Complete Trial Of Machines.E- Rotate The Magma Mixture 90 Degree.F- Water Connection To Be Made.G- Dismantling Of Magma Pumps, Molasses Pumps Along With Pump Beds From Old Mill.H- Erection Of Magma Pumps, Molasses Pumps Along With Pump Beds At New Pump.I- Complete Trials Of The Unit. 161 Erection Of Molasses Pump. Scope Of Work.A. Fabrication New Structure Bed.B. Erection Of Molasses Pumps Along With Valves And Complete Pipe Line ( 6” ) From Centrifugal Section To Pan Floor Receiving Tank.C. Complete Trial Of Molasses Pumps. 162 Dismantling & Erection Of M / C Gutter Size- 510Mmx490mm. 163 Dismantling , Fabrication & Erection Modification Of Structure Of Reduction Gear Box Grader With Alignment 164 Modification In Drive Foundation Bed Of Reduction Gear Box And Motor Sugar Elevator. 165 Job Work Of Juice Sulphiter Modification Revised Scope Of Worka- Work To Be Completed In Side The Drum As Per Drawingb- Dismantling Of Existing 1.5 Meter Dia Inside First Drum.C- Dismantling Of Existing 2.5 Meter Dia Inside Second Drum From Juice Sulphiterd- Perforated Ms Plates Having 3.0 Meter Dia 03 Nos Along With 2.0 Inch Hole Dia To Be Made To Be Fitted At Site.E- M.S. Channels 100 Mm To Be Fitted Inside The Drum.F- Stirrer Shaft To Be Mounted Along With Bearing Housing With 2.0 Inches Ball.G- Erection Of Reduction Gear Of Stirrer Drive.H- Alignment With Reduction Gear & Motori- Dismantling Of Reduction Gear & Motor From Old Mill Juice Sulphiter.J- 03 Nos.Manhole To Be Provided At Suitable Positionk- Modify Of Sperger And Its Dome.L- Rearranging Of So2 And Juice Lines 166 Modification In Juice Heaterscope Of Work1. Dismantling / Removal Of All Tubes Of Juice Heaters By Breaking Of Expand From Top & Bottom Tube Plates.2. Length Of All Tubes To Be Reduced From 4460Mm To 4000Mm.3. Cut Down The Bottom Tube Plate4. Calendria Shell Length To Be Reduced From 4660Mm To 4000 Mm5. Erection Of Bottom Tube Plate With The Shell According To The Length Of Tubes.6. Bottom Cover To Be Set Right.7. Hydraulic Testing Of Calendria To Be Done At 60 Psig. Complete Water Trials. 167 Dis Of Ms Pipe Line 168 Dismantling, Fab. & Erection Of Inter Rake Carrier As Per Direction Ce. Scope Of Worka. Dismantling , Fabrication & Erection Of Inter Rake Carrier Side Plate B .Dismantling & Fabrication Of Inter Rake Carrier Dive &Tail Shaft Sprocket Distance Pecsc .Dismantling , Fabrication & Erection Of Inter Rake Carrier Runner Boxd. Complete Trials Of Inter Rake Carrier 169 Fitting Of G.I Coler Coated Trapezoidal Sheet 12 Mtr 170 Do---- 6 Mtr 171 Dismantling, Fab. & Erection Of Structure Colum Binder 172 Repair Of Structure Colum Binder 173 Dismantling, Fab. & Erection Of Ms Angle & Channel 174 Dismantling, Fab. & Erection Of Perling / Stress Hannel 100X50 175 Fabrication & Erection Of Shed Gutter Size 1’X1’X’1’ Plate 3Mm Thk. 176 Shifting , Dismantling , Fabrication And Erection Of Gantry For Rbc Sprocket And Gear 177 Modification Of Both Side Chain Sprocket Bed For Mbc And Rbc 178 Cleaning & Double Coat Painting For Cane Unloader Shed Structure 179 Dismantling , Fabrication And Erection Of Runner Box For Mbc, Rbc, And Bagasse Elevator 180 Fabrication And Erection Of Chute For Mill To Mill Bypass System 181 Modification In Hot Air Blowerscope Of Worka. Dismantling Of Air Blowerb. Modification In Bedc. Erection Of Blower.

Key Dates

Contract Date 01 Jun 2022

Contact Information

Company Name
Awarded Bids List
S.No Bid Number Bidder Name Awarded Currency Awarded Value
1 413922 IDRIS AHMAD INR 0.00
2 414502 APW ENTERPRISES INR 0.00
Contract Value 8 Million
Contract Date 01 Jun 2022

Complete details of the selected Tender
Organisation Name : Vijaya Bank
Organisation Type : Public Sector Banks Ministry : Ministry of Finance
Tender Ref. No : DIT/DELHIARMB/07052016/1
Tender Title : E-Auction Sale Notice for the properties of M/s Guru Kripa Iron Trading Pvt Ltd, mortgaged to Vijaya Bank and taken possession under the provisions of SARFAESI Act 2002.
Product Category : Land/Building
Sub Category :
Tender Value (INR if not mentioned):
Rs 1,62,00,000/-
EMD :
1620000
Document Cost :
0
Tender Type : Auction
Location : Delhi
First   
Announcement Date :
5-July-2016  
Publication Date on Portal: 5-July-2016 At : 8:03:09 PM  
Last Date of Document Collection :  
8-August-2016 Up To : 5:00 PM  
Last date for  
Submission :
8-August-2016 Up To : 5:00 PM  
Opening Date : 10-August-2016 At : 11:00 AM  
Work Description :
Pre-Qualification :
PreBid Meet Date : --
Tender Document : View Document *
Bid Document : Document Not available
Tech. Document : Document Not available
Sector : Banking, Finance & Insurance
State : Karnataka
 
For further Information Contact:
Name : Santhosh Aili
E-Mail : cbsprog11@vijayabank.co.in
Phone Office : 08025584066
Fax : 08025582747
Address :
City : Bangalore

  download Adobe® Reader®
Adobe® and Get Adobe® Reader® logo are trademarks or registered trademarks of Adobe Systems Inc. in the US and/or other countries.

View Notice Now...

Login with your Social Account for Instant Access to this notice


Tell us about your Product / Services,
We will Find Tenders for you