Fabrication & Erection Jobs ( Budhewal Csm ) - 1 Budhewal Csm 2 Pipe Linem.S1” To 12” Diaa ) Dismantling 3 B ) Erection 4 Replacementofpipe Linem.Sabove 12” Dia ( Other Than Vapour Pipe Of Pan And Quad ) 5 Pipe Linec.I.1”To 12” Diaa ) Dismantling 6 B ) Erection 7 Ibr Steam Pipe Line .3”To 8” Diaa ) Dismantling 8 B ) Erection 9 A ) Bend M.Supto 12” Diaa ) Dismantling 10 B ) Erection 11 B ) Bend M.S.Above 12” Dia ( Other Than Vapour Pipe Line Ofpans & Quad ) A ) Dismantling 12 B ) Erection 13 Bendofm .S.Upto 12” Dia ( Other Than Vapour Pipe Line Ofpans & Quad ) A ) Dismantling 14 B ) Erection 15 Nippleofm .S.Upto 12” Dia ( Other Than Vapour Pipe Line Ofpans & Quad ) A ) Dismantling 16 B ) Erection 17 Reducerofm .S.Upto 12” Dia ( Other Than Vapour Pipe Line Ofpans & Quad ) A ) Dismantling 18 B ) Erection 19 Bend, Nipple, Reducer Ofm .S. Above 12” Dia ( Other Than Vapour Pipe Line Ofpans & Quad ) 20 Man Holes Of All Sizesa ) Dismantling 21 B ) Fabrication 22 C ) Erection 23 Flanges Of All Sizea ) Dismantling 24 B ) Fabrication 25 C ) Erection 26 M.Steea ) Dismantling 27 B ) Erection 28 M.Snipplea ) Dismantling 29 B ) Erection 30 M.Scrossa ) Dismantling 31 B ) Erection 32 M.Sreducers A ) Dismantling 33 B ) Erection 34 M.Sblind A ) Dismantling 35 B ) Erection 36 Dismantling, Fabrication And Erectionm.Scoil Of2” To 4” Dia 37 Replacement Platform Of Any Type 38 M.S. Structure Work ( Factory Building ) Replacement 39 M.S.Tank Having Round &Rectangular Bottomsreplacement 40 Trusses, Perlins, Columns & Beams ( Factory Building ) Replacement 41 Platform Pipe Line Railing Of All Sizes A ) Dismantling 42 B ) Erection 43 Electric Panel, Db And Other Machinery Shed Gi / Acc / Ms Sheeta ) Dismantling 44 B ) Fabrication 45 C ) Erection 46 Dismantling, Fabrication And Erection Of Pump And Motor Bed Of All Size 47 Valves Sluice / Angle / N.R. / Butterflydismantling 48 B ) Erection 49 Conefromm.Splatea ) Dismantling 50 B ) Fabrication 51 C ) Erection 52 Gutter From M.S Plate 5Mm A ) Dismantling 53 B ) Fabrication 54 C ) Erection 55 Crystallizerslide Gatevalvea ) Dismantling 56 B ) Fabrication 57 C ) Erection 58 Fabrication And Erection Of M. S Terminal Box Of Any Type 59 Patch Workof Boiling House / Mill House 60 Replacementof Sulphurfurnace Scrubberfrom M. S. Plate From 10Mm ( Including All Connections With Pipe Lines ) 61 Replacementofsulphurfurnace Melter / Receiver From M. S. Plate From 10Mm ( Including All Connections With Pipe Lines ) 62 Sulphurfurnace Chamberfrom M. S. Plate From 10Mm ( Including All Connections With Pipe Lines ) Dismantling , Fabrication&Erection 63 Dismantling , Fabrication & Erection Of Sulphur Furnace Nipples, Bends 64 Juice Heater Outer Shellfrom M.S. Plate 10Mm Including Hydraulic Testing At 50 Psi For Each Juice Heatera ) Dismantling 65 B ) Fabrication 66 C ) Erection 67 Fabrication & Erection Of Mud Mixture Scroll & Side Plateswith Proper Alignment & Commissioning 68 Juice Clarifier Inside Compartment Coil From M.S. Pipe 5” With All Connections Complete Job ( As Where It Is ) Dismantling, 69 B ) Fabrication 70 C ) Erection 71 Dismantling, Fabrication & Erectionof Juice Heater Angle Valves , Distance Piece From M.S. Plate 10Mm Of Diameter 12” 72 Dismantling, Fabrication & Erection Of Juice Heater ( Top & Bottom ) Compartment Partition Plate With Rubber Fitting Channels From M.S / En-8 Square Bar & Rubber Seal Fitting To Make It Leak Proof ( To Avoid Short Circuiting ) I ) Top Compartment 73 Ii ) Bottom Compartment 74 Dismantling Fabrication & Erection Of Ms Channel Of Rubber Strips Of Juice Heater Compartments With M.S / En-8 Square To Avoid Short Circuiting 75 Quad Body Shell From M. S. Plate12mm Dismantling 76 B ) Fabrication 77 C ) Erection 78 Top Conefrom M. S. Plate12mmdismantling 79 B ) Fabrication 80 C ) Erection 81 Umbrelllafrom M.S. Plate10mm Dismantling 82 B ) Fabrication 83 C ) Erection 84 Down Take From M.S. Plate12mmdismantling 85 B ) Fabrication 86 C ) Erection 87 Save –Allfrom M.S. Plate10mmdismantling 88 B ) Fabrication 89 C ) Erection 90 Pan ( Capacity 40 Ton ) Body Shell From M. S. Plate12mm Dismantling 91 B ) Fabrication 92 C ) Erection 93 Top Conefrom M. S. Plate12mmdismantling 94 B ) Fabrication 95 C ) Erection 96 Umbrelllafrom M.S. Plate10mm Dismantling 97 B ) Fabrication 98 C ) Erection 99 Down Take From M.S. Plate12mmdismantling 100 B ) Fabrication 101 C ) Erection 102 Save –Allfrom M.S. Plate10mmdismantling 103 B ) Fabrication 104 C ) Erection 105 Vapour / Exaustpipe Line Of Quad And Pan From M.S Plate 8Mma ) Dismantling 106 B ) Fabrication 107 C ) Erection 108 Dismantling , Fabrication & Erection Of Distance Piece Of Vapor Pipe Of Pan / Quad & Injection Header Length Upto 1.5 Mtra ) Dia-1000Mm 109 B ) Dia-900Mm 110 C ) Dia-720 Mm 111 D ) Dia – 620 Mm 112 E ) Dia-400Mm 113 Dismantling, Fabrication & Erectionof Steam Jacket Of Evaporator / Semi-Kestner Including Nipple, Flange If Any 114 Syrup / Molasses Tank From M.S Plate 8Mm Along With Strengthening With M.S Angle A ) Dismantling , Fabrication &Erection 115 Replacement / Patch Work Of Worn Out Body Shell Of Final Molasses Storage Tankwith M.S. Plate 116 Replacement / Patch Work Of Worn Out Roof Of Final Molasses Storage Tankwith M.S. Plate 117 A. Dismantling, Fabrication & Erection Of Suction Pipes Of Injection / Spray Pumps Including Reducer 118 B. Dismantling, Fabrication & Erection Of Strainersof Injection / Spray Pumps . 119 Dismantling, Fabrication & Erection Of Cooling Coilsof Crystallizers Including Connection Pipe If Any 120 Dismantling , Fabrication And Erection Water Weighing & Receiving Tanks 121 A ) Dismantling, Fabrication, Erectionof Magma Mixturebodyincludingdriving Units Complete 122 B ) Patch Work Of Any Magma Mixture / Pug Mill 123 Replacement Of Worn Out Round Portion Of Crystallizer Body 124 Repairandfitting Of Bush To Crystallizer ‘S Central Shaft 125 Replacementofworn Out Condensatejuice Receiving Bottleswith All Connection 126 Dismantling, Fabrication & Erection Of Completescrapper Hinge Of Juice Clarifier 127 A ) Dismantling, Fabrication & Erection Of Dorr’ S Scrapper 128 B ) Dismantlingfabrication & Erection Of Flash Tank Of Dorr With All Nipple Etc. 129 Replacement Of C.Itailpipe Of Pan & Quad With Ms Pipe Line 130 Replacementofcondenser Jet Box 131 Dismantling, Fabrication & Erectionof The Bottom Portion Of Pug Mill ( Centrifugal Machine ) 132 Replacement Of The Outer Shell Of The Dorr Clarifier 133 Replacement / Repair Of Worn-Outportionof Sugargraderside Plates & Chutes 134 Replacement / Repair Of Worn-Out Portionofhopper 135 Replacement Of Air Tray Of Hopper 136 Dismantling, Fabrication & Erection Of Worn-Out Shaft Of Crystallizerincludingcomplete Gear Arrangement With Complete Commissioning 137 Dismantling , Fabrication & Erection Of Ribbon Type Arms Of Crystallizer 138 Complete Replacement Of Ribbon Type Arms Of Crystallizer 139 Dismantling , Fabrication & Erection Of Vacuum Filter Condenser 140 Dismantling , Fabrication & Erection Distribution Plate Of Central Shaft Of Juice Clarifier 141 Dismantling , Fabrication & Erection Mud Boot Of Juice Clarifier 142 Dismantling& Erection Of Spraypump With All Connection Including Distance Piece 143 Vacuum Filter Trough& Agitator Repair / Patch Work 144 Dismantling, Fabrication & Erection Of Vacuum Filter Trough 145 Strengthening Of Umbrella Of Pan / Quad Body 146 Strengthening Of Save All Of Pan / Quad Body 147 Dismantling, Fabrication & Erection Of Juice Sulphitor Chimney 148 Dismantling, Fabrication & Erection Ofcomplete A-Magma Mixtureincluding Fitting Of Central Shaftwith Arms & Gear Arrangement With Commissioning 149 Dismantling & Erection Of Pug Mill Gear Arrangement& Replacement Of Bush , Works Includes Fitting Of Radicons & Commissioning 150 Modification Of Exhaust Blower Including Strengthening Of Bed & Commissioning 151 Modification Of Dry Seed Elevator Bottom Chute To Avoid Breakdown / Jamming 152 Dismantling, Loading & Transportation Of Discharge Valve Of Pan From Csm Patiala & Unloadingat Csm Budhewal 153 Dismantling &Erection Of Discharge Valveof Pan No-4 Withmodification If Any Including Trials & Commissioning At Csm Budhewal 154 Re-Tubing Of Evaporator Body ( Approx.1600Tube ) Including Hydraulic Testing At 50 Psi 155 Dismantling &Erection Of Tube Plates Of 3Rd Body Of Evaporator 156 Dismantling & Erection Of Transient Heater With All Connection Of Pipe Lines, Valveswith Modification If Any Including Trials & Commissioning 157 Dismantling, Loading & Transportation Of Transient Heater From Csm Patiala & Unloading At Csm Budhewal 158 Dismantling , Fabrication & Erection Of Venturi Of Condenser 159 Dismantling, Fabrication & Erection Of Bottom Sourcer Of Pan No-4 160 Dismantling, Fabrication& Erection Of Chute Of 5’ Widthgrader For Leak Proof Working 161 Repair / Replacement Of Bagacillo Perforated Plate Of Bagacillo Blower For R.V.F 162 Modification Job Of Bottom Saucer Of Evaporator 163 Dismantling , Fabrication & Erection Of Ammonia Coil Of Pan / Quad 164 Sulphur Furnace Heating Element Repair / Replacement Of Jacketsincluding Nipples 165 Dismantling & Erection Of Partition Box Of Juice Heater 166 Replacement Of Worn-Out Of M.S. Runner Of Inter Carrier, Elevator, Rbc, Cross Carrier & Cane Carrier Chains 167 Replacement Of Rail Line Of Cane Unloader With 50Mm Square Bar 168 Replacement Of Worn Out Ducting Of Boiler & Apcdincluding Angle, Channel, Flats & Flanges 169 Replacement Of Side Plates Of Cane Carrier Chain / Rbc Trough / Cross Elevator / Bagasse Elevator 170 Leveling Of Cross Elevator Chain Trough 171 Mill House Screw Conveyor Assembly ( Complete With Bearings ) Dismantling , 172 B ) Fabrication 173 C ) Erection 174 Replacement Of Worn Out Portion Of Apcd Includes Casing / Scrubberand Flue Gas Entry Connected To Chimney Portion Etc. 175 Cane Cutter Hood And Chopper Top Plate From 12 Mm Thickm.S Platea ) Dismantling 176 B ) Fabrication 177 C ) Erection 178 Dismantling, Fabrication & Erection Of Worn Out Portion Of Chute Cane Carrier To 1St Mill 179 Replacement Runner ( Flat Size 50X8mm ) Of Cane Carrier / Cross Elevator / Rbc / Baggase Elevator 180 Dismantling, Fabrication, Erection Of Juice Tray Of Mill No. 1 & 2 From M.S Plate 8Mm 181 10 Mm 182 Dismantling, Fabrication, Erection Of Juice Tray Of Mill No. 1 & 2 From S.S Plate 8Mm 183 10 Mm 184 Repair Of Rotary Bagasse Feeders Of Boilersa ) Body 185 B ) Rotor 186 Replacement Of Casing Of Boiler ( Both Plate & Supporting Angle ) 187 I.D. Fan Worn Out Casing Of Both Boilersdismantling 188 B ) Fabrication 189 C ) Erection 190 Replacement Of The Expansion Joints Of Boilers 191 Replacement Of Worn Out Ductingthe Boilers 192 Erection And Fabrication Ofany -Thingfrom Scrap 193 Replacement Of Inter Carrier Side Plates 194 Replacement Of Scraper Barside Platessize :- 1 Meter Square 195 Replacement Of The Casing Of Air Heater 196 Replacement Of Worn-Out Of M.S. Runner Of Inter Carrier, Elevator, Rbc, Cross Carrier & Cane Carrier Chains 197 Replacement Of Rail Line Of Cane Unloader With 50Mm Square Bar 198 Replacement Of Worn Out Ducting Of Boiler & Apcdincluding Angle, Channel, Flats & Flanges 199 Replacement Of Side Plates Of Cane Carrier Chain / Rbc Trough / Cross Elevator / Bagasse Elevator 200 Leveling Of Cross Elevator Chain Trough 201 Mill House Screw Conveyor Assembly ( Complete With Bearings ) Dismantling , 202 B ) Fabrication 203 C ) Erection 204 Replacement Of Worn Out Portion Of Apcd Includes Casing / Scrubberand Flue Gas Entry Connected To Chimney Portion Etc. 205 Cane Cutter Hood And Chopper Top Plate From 12 Mm Thickm.S Platea ) Dismantling 206 B ) Fabrication 207 C ) Erection 208 Dismantling, Fabrication & Erection Of Worn Out Portion Of Chute Cane Carrier To 1St Mill 209 Replacement Runner ( Flat Size 50X8mm ) Of Cane Carrier / Cross Elevator / Rbc / Baggase Elevator 210 Erection And Fabrication From Scrap 211 Replacement Of Inter Carrier Side Plates 212 Replacement Of Inter Cane Carrier Plates 213 Replacement Of Scraper Barside Platessize :- 1 Meter Square 214 Replacement Of Air Heater Tubes ( Approx.555Tubes ) Including Hydraulic Testing
|