Piling, Civil And Structural Works Naphtha Pipeline Works In Cpcl Manali Piling, Civil And Structural Works For Routing Cdu Ii And Dhds Naphtha To Cdu I Splitter In Manali Refinery Of Cpcl , Construction ( Boring, Providing & Installing ) Of Bored Cast-In-Situ R.C.C. Straight Shafted Pilesof 500 Mm Diameter And Specified Length Below The Pile Cap With M35 Grade Concrete, Using Ordinary Portland Cement ( Opc ) 53 Grade Conforming To Is: 12269 ( Latest Rev. ) Of Approved Makewith A Minimum Cement Content Of 400Kg / Cu.M. And Stone Chips Of 20Mm And Down Size, Through All Types Of Stratato Carry A Safe Working Load Not Less Than Specified Including Confirming That Pile Rests On Hard Strata Having Nvalue Greater Than Or Equal To 100, Excluding The Cost Of Steel Reinforcement But Including The Cost Of Boring With Tractor Mounted Drilling Rigs Using Direct / Reverse Mud Circulation Method, Maintaning Borehole Sides In Position By Bentonite Slurry By Direct Mud Circulation Method, Tremie Concreting And Temporary Casing Of Appropriate Length For Setting Out And Removal Of Same And The Length Of The Pile To Be Embedded In The Pile Cap Etc. This Also Includes Supply Of Necessary Material Including Admixtures, Plastisizers If Required ( Quantity As Permix Design Report Recommendation ) & Carrying Out Any Ancillary Work Adjunct To Piling Work, Disposal Of Surplus Materials Including Earth, Muck At Designated Places Within The Refinery Premises Upto A Lead Of 3Km With All Leads And Lifts, Shifting Plant And Equipments From One Pile Location To Another, Mobilising & Demobilising Of Required Number Of Piling / Boring Rigs & Ancillary Equipments, Tools, Tackles & Labour All Complete, As Per Specifications, Drawings & Directions Of Engineer-In-Charge Etc.Note: 1 ) Payment Length Shall Be Measured Below The Cut Off Level.Maximum Cut Off Level Will Be 3M From The Egl.No Payment Shall Be Made For The Empty Boring Made Above Cut Off Level . , Supplying And Placing In Position High Strength Deformed Steel Bars Reinforcement ( Conforming To Is:1786, Grade Fe500 ) , For 500Mm Dia Rcc Bored Cast-In-Situ Piles For Full Length Of Pile, With Helical Ties, Including Transporting The Steel, Straightening, Cleaning, Decoiling, Cutting, Bending To Required Shapes And Lengths As Per Details, Binding It In Positionby 16 Swg Black Soft Annealed Binding Wire, At Every Intersection, Supplying And Placing With Proper Cover Blocks, Supports, Chairs, Overlaps, Spacers, Inner Rings Welding To Main Longitudinal Rods To Form A Rigid Cage For All Heights And Depths, Guide Bar Etc. Complete As Per The Specifications And Directions Of Engineer-In-Charge. , Conducting Standard Penetration Tests In Soil, Weathered Rock, Soft Rock And Hard Rock During Boringfor 500Mm Diameter Pile As Directed, At Every Change In Stratum Or At Intervals Of Not More Than 1.5M Which Ever Is Less, Starting At 15M Below Ground Level As Directed By Engineer-In-Charge, Including Using A New Spt Shoe For Each Test. , Cutting The Heads Of Rcc Piles Of500mm Dia And A Length Not Exceeding 600Mm Including Exposing / Cleaning, Bending Of The Reinforcements Making Site Clean For Casting Of Pile Cap, Removal And Disposal Of Debris At Designated Place Within The Refinery Premises Up To A Lead Of 3Kmall Complete As Per The Specifications And Directions Of Engineer-In-Charge. , Earthwork Excavationby Mechnical / Manual Means Below Ground Level For All Kinds Of Works In All Types Of Soils Except Soft Rock And Hard Rock As Classified In Specification For A Depth Up To 1.5M Including Removal Of Vegetation, Shrubs And Debris, Removal Of Surface / Rain Water, Cutting And Dressing Of Sides In Slopes, Levelling, Grading And Ramming Of Bottoms And Keeping The Surface Dry For Subsequent Works And Disposal Or Stacking Of Excavated Material Within A Lead Of 100M Including Providing Shoring & Strutting If Required, Providing Temporary Supports To Existing Service Lines Like Water Pipes, Sewage Pipes, Electric Cables, Ows / Crws Pipes, Chambers, Storm Water Drain Walls Etc; All Complete As Directed By Engineer-In-Charge. , Same As Item No:50 Above But For Depths Beyond 1.5M And Upto 3M. , Backfilling After Execution Of Work To Proper Grade And Level With Selected Materials From Available Excavated Soil From Soil Heaps Within A Lead Of 100M, Including Re-Excavating The Deposited Soil Excavated Earlier, Breaking Clods, Laying At All Depths & Heights In Layers Of Thickness Not Exceeding 150Mm Watering, Rolling And Ramming By Manual Methods / Mechanical Compactors, Dressing, Trimming, Etc., In Foundations, Trenches, Pits, Etc. Including All Labours, Tools & Tackles Etc All Complete As Per The Specifications And Directions Of Engineer-In-Charge. , Transporting & Disposing The Surplus Earth & Debris Including Shrubs And Vegetations From Construction Area ( Beyond The Initial Lead Of 100M ) To The Designated Area Within The Refinery Premises Up To A Lead Of 3Km Including Re-Excavating The Deposited Soil Excavated Earlier, Transportation, Loading, Unloading, Laying At All Depths & Heights, Stacking, Levelling And Dressing Both Areas ( Viz., From Where The Earth Is Transported And Where It Is Deposited ) To Required Levels And Slopes Complete With All Lifts As Directedby Engineer In Charge. ( Note: If Measured By Stacks 30%Voids Will Be Deducted. ) , Supplying And Filling Approvedm- Sand Of Specified Quality Under Floors, Foundations, Pile Caps Etc. For All Depths & Heights Including Cost Of Sand, Royalties, Taxes, Handling, Loading, Unloading, Transportation To Site For All Leads & Lifts, Stacking, Spreading In Layers Of Loose Thickness Not Exceeding 150Mm, Watering, Ramming, Compacting With Mechanical Compactors And / Or Other Equipment To The Specified Levels , Including Preparation Of Subgrade To The Required Slope, Providing Testing Apparatus And Testing The Degree Of Consolidation, All Complete As Per Drawings, Specifications And Directions Of Engineer-In-Charge. The Rates Shall Be Inclusive Of The Cost Of Labour, Tools And Tackles, Etc. All Complete. , Providing, Mixing And Laying Of Pcc 1:4:8 ( 1 Cement: 4 M-Sand : 8 Coarse Aggregate ) Nominal Mix Using 40Mm And Downgraded Coarse Aggregate Andordinary Portland Cement 53 Grade For Any Thickness Belowfoundations, Pile Cap, Raft, Grade Slab Etc.Including Shuttering, Tamping, Ramming, Vibrating, Curing, Etc., All In Any Shape, Position, Thickness And Finishing The Top Surface Rough Or Smooth As Specified And Directed All Complete, As Per Drawings, Specifications And As Directed By Engineer-In-Charge. , Providing, Mixing And Laying In Position Rcc Of Grade M25 With 20Mm And Down Graded Coarse Aggregates & M-Sand As Per Is 456:2000 Using 53 Grade Ordinary Portland Cement In Sub-Structure For All Depths And Upto 1.5M Above Ground Levelincluding Cost Of Admixtures If Used, Labour Charges, Tools And Tackles, Providing Pockets, Openings, Recesses, Chamfering Etc., Wherever Required, Vibrating, Tamping, Curing And Rendering If Required To Give A Smooth & Even Surface And Providing Neat Cement Wash Etc., ( Excluding The Cost Ofreinforcement And Shuttering ) , Etc. All Complete As Specified And Directed By Engineer-In-Charge. , Providing And Fixing Centering & Shuttering In Sub-Structures For All Depthsand Upto 1.5M Above Ground Level Including Strutting, Bracing, Propping, Keeping The Same In Position During Concreting And Removal Of The Same After Specified Period, Application Of Mould Releasing Agents Ofapproved Make, For Straight / Inclined Shuttering, Keeping Necessary Provision For Inserts, Projecting Dowels, Anchor Bolts Or Any Other Fixture, Etc., All Complete And As Specified And Directed By Engineer-In-Charge. , Supplying And Placing In Position High Strength Deformed Steel Bars Reinforcement ( Conforming To Is:1786, Grade Fe 500 ) , For Rcc Work Including Transporting The Steel, Straightening, Cleaning, Decoiling, Cutting, Bending To Required Shapes And Lengths As Per Details, Binding With Contractors Own 16 Swg Black Soft Annealed Binding Wire At Every Intersection, Supplying And Placing With Proper Cover Blocks, Supports, Chairs, Overlaps, Welding, Spacers, Fanhooks, Scaffolding Etc. For All Heights And Depths Etc., All Complete As Per Specifications And Directions Of Engineer-In-Charge. , Grouting Pockets, Holes, Pipe Sleeves Of Any Shape Or Size, Column Bases, Machine Bases Etc.Using Non Shrink Grout Of Approved Quality Including Supply Of Material, Roughening Surface, Cleaning With Compressed Air / Water Jets, Ramming, Curing, Labour Charges Etc.All Complete As Directed By Engineer-In-Charge. , Providing And Applying Approved Epoxy Resinfor Bonding Of Fresh Concrete To Old Concrete In All Types Of Structures Such As Extension Of Existing Sleepers & Pipe Supports Etc., At All Depths And Heights Including Cleaning Of Concrete Surfaces, Removing Of All Loose Concrete Pieces, Making Rough By Chiselling, Taking Off The Skin Of Concrete, Application Of Epoxy Resin System As Per Manufactures Recommendations Taking All Safety Measures, Etc.Complete As Specified And Directed By Engineer-In-Charge. , Providing And Laying Brick Masonryinsubstructureusing Cement Mortar 1:5 ( 1 Cement:5 M Sand ) And Class 5.0 Bricks At All Depths Including The Cost Of Materials, Labour, Tools And Tackles, Scaffolding / Staging, Sampling And Testing, Soaking Of Bricks, Cutting And Laying Of Bricks, Providing Recesses, Finishing The Joints Flush Below Ground Level , Curing, Etc. All Complete As Per Specifications, And As Directed By Engineer-In-Charge. , Proividing Plain Cement Plaster Of 15 Mm Thickness In Cement Mortar 1:4 ( 1 Cement: 4 M Sand ) On Brick Wall Surfaces Including Cleaning, Hacking Of Concrete Surfaces, Scaffolding, Finishing, Curing, Cement Cost Etc. For All Heights Complete And As Directed Byengineer-In-Charge. , Supplying, Transporting, Storing, Fabricating & Erecting In Position Bolted And / Or Weldedstructural Steel Works Like Angles, Channels, Beams, Plates Confirming To Is: 2062 Etc.At All Heights & Levels And Locations Including All Builtup Sections / Compound Sectionsmade Out Of Rolled Sections And / Or Plates / Bent Plates Inexisting / New Structural Pipe Supports, Frames, Etc., Cutting To Required Size, Straightening / Bending If Required, Edge Preparation, Cleaning, Scrapping & Welding Ofunsoundjoints In Existing Structural Members, Preheating, ( Including Sealing Of Box Section With Continuous Welding ) Finishing Edges By Grinding , Fixing In Line And Level With Temporary Bracings, Including Providing Staging, Scaffoldings, & Working Platforms At All Heights, And Removal Of Same After Erection, Including Preparing The Surface For Painting , Grit Blasting, Surface Cleaning, Wire Brushing, Removal Of Mill Scale, Dust, Rust, Oil Or Grease Etc Complete Along With Providing Paint System As Follows: ( A ) Applying Inorganic Zinc Silicate Coat 75 Micron Dft ( B ) Two Coats Of Epoxy Primer Paint 75 Micron Dft Each ( C ) Two Coats Of Anti Rust Epoxy Top Coat Paint 100 Micron Dft Each As Per Manufacturers Specifications And As Directed By Engineer-In-Charge. Note:-One Coat Of Zinc Silicate And One Coat Of Epoxy Primer Shall Be Applied On Structural Steel Surfaces After Grit Blast Cleaning In Workshop Prior To Erectionas Specified & Directed By Engineer-In-Charge. Supply Of All Materials In Contractors Scope. , Supplying, Transporting, Storing, Fabricating And Fixing In Position M.S. Steel Inserts ( Withlugs ) Asshownin Drawing Including Fabrication To Any Shape Made Out Of Flats, Plates, Rolled Sections, Sleeves, Pipes Etc. Providing Necessary Templates, Staging, Cutting, Straightening, If Required, Bolting, Welding As Required And Embedding In Position On Both Plain, Reinforced Cement Concrete Members Inclusive Of Adjusting Shuttering & Reinforcement / Any Other Fixture, Welding Where Ever Necessary, Tying And Holding To Correct Level, Line And Position, Any Auxilliary Dummy Structures To Support The Heavy Inserts, & Painting With One Shop Coat Of Inorganic Zinc Silicate Primer And Finsihing With Two Coats Of Anti Rust Epoxy Paint Of Approved Brand And Colour , Etc Complete As Perdrawing, Specification And Direction Of Engineer-In-Charge. , Supplying, Fabricating, Delivering And Fixing In Position At Site Anchor Bolts, Nuts / Lock Nuts, And Anchor Bolt Assemblies, Including Necessary Templates Etc. Complete As Per The Drawings And As Directed By Engineer-In-Charge. ( Templates Required For Fixing Shall Not Be Paid Separately ) . , Demolishing Brick Masonry In Lime Or Cement Mortar ( Taking All Necessary Safety Precautions ) For All Depths And Heights Below And Above Plinth Level Including Supply Of All Tools And Tackles, Necessary Scaffolding, Propping, Underpinning, Cleaning And Disposal Of Unserviceable Material Atdesignated Place Within The Refinery Premises Up To A Lead Of 3Km As Per Specifications And As Directed By The Engineer-In-Charge . , Demolishing Plain Cement Concreteof All Grades ( Taking All Necessary Safety Precautions ) For All Depths And Heights Below And Above Plinth Level Including Supply Of All Tools And Tackles, Necessary Scaffolding, Propping, Underpinning, Cleaning Anddisposal Of Unserviceable Material Atdesignated Place Within The Refinery Premises Up To A Lead Of 3Km As Per Specifications And As Directed By The Engineer-In-Charge . , Demolishing Reinforced Cement Concrete ( Taking All Necessary Safety Precautions ) For All Depths And Heights Below And Above Plinth Level Including Supply Of All Tools & Tackles Labours, Necessary Scaffolding, Propping, Underpinning, Cleaning And Including Cutting, Straightening, Scrapping Of Rebars And Disposal Of Unserviceable Material Including Reinforcements Atdesignated Place Within The Refinery Premises Up To A Lead Of 3Km As Per Specifications And As Directed By The Engineer-In-Charge . , Providing And Laying Of Reinforced Cement Concrete ( Rcc ) 1:1.5:3 By Volume ( 1Cement: 1.5 M Sand:3 Aggregate ) With Opc 53 Grade And 20Mm And Down Size Graded Crushed Stone Aggregate Materials For Sub Structure Upto Plinth Beam Levelfor All Depths Including Pavement, Machine Mixing, Curing, Consolidating With Vibrator, Cement Cost Etcall Complete As Per Instructions Of Engineer-In-Charge Excluding Cost Of Shuttering And Reinforcement. , Supply Of Jcb On Hire Basis On All Days Including Sundays On 8 Hrs.Shift Including Driver, Assistant / Fuel / Oil / Lubricants / All Consumables Etc. Complete. The Quoted Rate Should Include Mobilization, Operator Crews / Driver / Assistant Cost, Tools, Tackles Etc., As Directed By The Engineer-In-Charge. , Supply Of Unskilledlabourto Carry Out Petty Works Not Assessable For Measurements / Minor Repair Works, On Day-To-Day Basis. The Rates Shall Include Esi, Pf, Payroll Cost And Allowances, Fringe Benefits, Overhead Supervision, Profits Andhand Tools. , Excavating Trial Pits Manually Of Required Size & Depth Upto 3M At Locations As Specified With Necessary Shoring, Dewatering & Backfillingas Required, Etc. Complete As Per Specifications And As Directed By Engineer In Charge.
|