Contract Award Notice |
|
TRR | 5338063 |
Organization | Official name: Klinikum Lippe GmbH |
Tender No | 415237-2021 |
Funded By | |
Country | Germany , All Region |
Contract Value | Plz Refer Document |
Work Detail |
Contract Award For Germany-Detmold: Lift and escalator installation work The Clinicum Lippen GmbH intends to rebuild the component C as an extension to the existing hospital at the DETMOLD location of the new building is built from 2UG to the 2OG and includes the following functional areas: OP area, endoscopy, intensive care, bed stations, storage / logistics areas, changing as well Technology Centers A later increase is planned1x passenger access galleries without engine room, with gearbox drive in the shaft head, vibration-insulated on the guide rails Assembled execution according to elevator policy 2014/33 / EU and DIN EN 81-20 / 50/70 for OP-Personal- 15 persons - 3 floors Dynamic fire control according to DIN EN 81-73 system for ventilation and smokeing Bay1x Fire brigade thrust as passenger lift lift system, fire brigade occupancy Passenger lifts without machine room with gearbox drive, vibration-insulated on the guide rails mounted according to EN 81-20 / 50/70 Firefighing elevator according to EN 81-72: 2020- 11 As a smoke managment comes a pressure lubrication NG for use this is to be considered in the design of the components (eg hanging cables, microphones, shaft doors) - 14 persons - 8 floors-dynamic fire control according to DIN EN 81-73 firefighters with appropriate chess equipment1x elevator group 2 pieces bed lift lift system, bed lift Passenger lift with bed transport without Machine room with gearbox drive, vibration insulated on the guide rails Mounted execution according to elevator policy 2014/33 / EU and DIN EN 81-20 / 50/70This elevator system is built on this order for 5 floors (2ug to 2og), for a later building upstead to 4OG If all system-relevant components are to be interpreted for 7 floors The two elevators are to be operated as a common elevator group to optimize transport performance The controllers must be combined accordingly - 34 persons - 5 floors-dynamic fire control according to DIN EN 81-73 system for aeration and smokeback Shower-smoking to Lbo NRW and ENEV system for smokeing / ventilation for bed expense OP Elevator for adhering to LBO NRW and EnEV high-voltage monitoring instructions and extension Extra lift monitoring as an overarching system of elevators in stock and new construction BT-C |
Key Dates |
|
Contract Date | 02 Aug 2021 |
Contact Information |
|||||||||||||||||||||||
View Notice Now...Login with your Social Account for Instant Access to this notice
|