Contract Award Notice |
|
TRR | 4268067 |
Organization | HINDUSTAN PETROLEUM CORPORATION LTD |
Tender No | 18000070-HB-11991 |
Funded By | Self-Funded |
Country | India , Southern Asia |
Contract Value | 4 Million |
Work Detail |
Tender For Electrical Amc 19-20 -Services Of Electrical Supervisor In General Shift Having Valid Supervisory License In Week Days.For More Details Refer Scope Of Job & Terms & Conditions.Highly Skilled Type, Services Of Electrician In General Shift With Valid Electrical License In Week Day(4 Electricians In General Shift).For More Details Refer Scope Of Job & Terms & Conditions.- Skilled Type, Services Of Electrician With Valid Electrical License In All Days ( 3 Shifts X 1 = 3 ).Rate Includes Services Of Leave & Weekly Off Reliever For The Electricians In Three Shift 24X7.For More Details Refer Scope Of Job & Terms & Conditions.Skilled Type, To Carry Out Earth Pit Testing As Per The Ie Rules, Oisd 137 And Bis Standards By Disconnecting From The Equipments And Grid With Electrodes At A Distance Of 15M Each. Checking The Efficiency Of Earthing Connections And Earth Pits (Around 300 In Numbers, Actual Number May Vary.) Of Tanks, Pumps, T/T Gantry, Tm/ Gantry, Flood Light Towers, Buildings Etc. Twice A Year (As Per The Schedule Given By Hpcl Oic) &Submitting Reports In Duplicate To Hpcl Officer In-Charge, Twice A Year Preferably Once In Summer And Once In Winter. Necessary Instruments & Manpower To Be Brought By The Party With Valid Calibration Certificate. There Should Be Full Earthing Continuity Between Bodies Of The Equipment & Earth Pit, Resistance Should Be Less Than 1 Ohm. If More, Corrective Action To Be Taken By The Contractor To Rectify The Earth Pits. Checking The Electrode Resistance, I.E., The Resistances Of The Grounding Pipe Itself, After Disconnecting With The Grid. Checking The Resistance Of The System In Grid. Rectification Of Earth Pit Like Tightening/Cleaning Of Bolts & Connections & Filling The Pit With Salt & Charcoal To Bring The Resistance To Specified Range & Paste Value & Due Dates, Tested Date Details On The Board Of Individual Earth Pits. If Required Changing Of Display Boards To Be Done, Etc. |
Key Dates |
|
Contract Date | 11 Mar 2019 |
Contact Information |
|||||||
View Notice Now...Login with your Social Account for Instant Access to this notice
|