Subscribe     Pay Now

Contract Award For Erect A New Guard House At The Schools Main Entrance . Appointed Site E...


Contract Award Notice

TRR 21412937
Organization Anglo-Chinese School (Independent)
Tender No INDACIETQ24000115
Funded By Self-Funded
Country Singapore , South Eastern Asia
Contract Value 65,048

Work Detail

Contract Award For Erect A New Guard House At The Schools Main Entrance . Appointed Site Engineer / Supervisor / Project Manager With Minimum Bcss To Liaise With Estate Dept In Applying Relevant Work Documents. , Provision Of S$1 Million Public Liability Insurance That Exclusive For Acs (Independent). [ To Include School Name In It ] And Workmen Injury Compensation Insurance As Well As Statutory Required Documentations And Signages Within 1 Week After Loa , Provide Labours, Tools And Transportation To Carry Out Daily Housekeeping And Disposal All Wastes In Accordance To Client And Statutory Requirements. , Necessary Protection Before Work Commencement. This Including The Necessary Safety Cordoning And Coverage When The Work Is On-Going. , Submission Of Relevant Data Sheet And O&M Manuals. , Civil Work: Clear The Site Of All Vegetation, Debris, And Rubbish That May Hinder Construction Activities Or Compromise The Foundation. , Civil Work: Provide Labour, Tools, And Materials To Remove The Brc Fence, Including 3 Fence Poles At The Perimeter Fence And Dispose All Wastes. , Civil Work:Ground Slab/ Foundation Works , Civil Works: Construction Of Floor Slab Foundation , Civil Work: Construction Of Walls, Windows Glass Panel And Doors , Civil Works: Roofing Works , Civil Works: Drainage- , Civil Works: Ceiling Works , Civil Work: Installation Of Vinyl Tiles , Civil Work Pathway: Construct A 45M (L)X 1.4M (W) Pathway With Raised Kerbs On Both Sides, Leading From The Visitor Car Park To The New Guard House. Ensure Durable Materials Are Used. , Civil Work Pathway: Construct A Pathway With Kerb On Both Sides From New Guard House To Linkway. , Civil Work Pathway: Levelling Of Ground For Pathway 45M (L) X 1.4M (W) , Civil Work Pathway:Levelling Of Ground For Pathway 5M (L) X 1.4M (W) , Civil Work Pathway: Drainage System For Pathway 45M (L) X 1.4M (W) , Civil Work Pathway: Drainage System For Pathway 5M (L) X 1.4M (W) , Electrical Works:3 Pcs X (2X 13A) Sockets With Pvc Cable + Earth In Pvc Conduit/ Pvc Trunking . , Electrical Works: 3 Pcs X Lighting Points With Switch Control C/W Pvc Cable + Earth In Pvc Conduit/ Metal Trunking + 3 X Double 4 Ft T5 Led Tube. , Electrical Works; Supply And Install 1 X 20 Wall Fans With New Fan Point. , Electrical Works: Ir Fixed Dome Network X 1 ( In New Guard House) , Electrical Works: Ir Fixed Dome Network X 1 ( In Existing Guard House) , Electrical Works: Ir Fixed Dome Network (At The Main Gates Trunstile) , Electrical Works:Ir Fixed Dome Network (At Back Gates Turnstile) , Electrical Works: Supply And Install Video Intercom System Consisting Of 2 Call Stations And 1 Video Monitor. Location Of 2 Call Stations Are Turnstile At Main Gate. , Electrical Works: Supply And Install 1 X 20A Distribution Panel Isolator At New Guard House. , Electrical Works: Lay New Cable And Conduit Underground For Power Supply Form Distribution Board To New Guard House. , Electrical Works: Supply And Install Main Cable For New Guard House. , Electrical Works: Tap Telephone Line For Existing Guard House. Install A Telephone Point In New Guard House. , Electrical Works: Install A Lightning Protection System With Cable, 4 Lightning Protector Stock And Earth Pit. , Electrical Works: Supply And Install Utp Cat 6 Cables With The Necessary Gi Conduit, Whether Concealed Or Exposed, And Containment, Whether Indoor Or Outdoor, From The Turnstile To The New Guard House Or Estate Office. , Electrical Works: Updating Of Single Line Diagram With Lew Endorsement. , Landscape: Cutting And Removal Of : , Landscape: Reinstatement For Grass And Plants On Affect Areas Surrounding Visitor Car Park. , Remove A 2-Meter Long Metal Beam At The Linkway. Smoothen Any Sharp Edges. (Refer To Appendix B-3) , Pe Endorsement Letter Confirming The Removal Of The 2-Meter Metal Beam At The Linkway. , Provide Skip Tanks For Disposal Of Debris. , Apply A High-Quality Protective Paint Finish To The Interior And Exterior Surfaces Of The Guard House And Linkway, Ensuring Appropriate Surface Preparation, Priming, And Application Of Multiple Coats For Durability And Aesthetic Finish. , Technical Support For Duplication Of Vehicular Flap Control System At New Guard House. , Drawing Charges. , Commissioning Works: Perform Interfacing Work, Including Programming And Connecting The New Equipement Eg Intercom, Cctv To The Existing System. , Warranty Coverage For 12 Months Including Defect Liability Period (Dlp).

Key Dates

Contract Date 01 Nov 2024

Contact Information

Company Name Kang Kang Kreative Pte. Ltd.
Contract Value 65,048
Contract Date 01 Nov 2024

View Notice Now...

Login with your Social Account for Instant Access to this notice


Tell us about your Product / Services,
We will Find Tenders for you