Contract Award For Installation Of Full Height Turnstiles Including Supply And Installation Of Biometric System . Appointed Site Engineer / Supervisor / Project Manager With Minimum Bcss To Liaise With Estate Dept In Applying Relevant Work Documents. , Provision Of S$1 Million Public Liability Insurance That Exclusive For Acs (Independent). [ To Include School Name In It ] And Workmen Injury Compensation Insurance As Well As Statutory Required Documentations And Signages Within One Week After Loa. , Provide Labors, Tools And Transportation To Carry Out Daily Housekeeping And Disposal All Wastes In Accordance To Client And Statutory Requirements. , Necessary Protection Before Work Commencement. This Including The Necessary Safety Cordoning And Coverage When The Work Is On-Going. , Submission Of Relevant Data Sheet And O&M Manuals. , Install Full-Height Security Turnstile For Ib Building Block F Side Gate , Construct And Erect Of Security Rain Cover Shelter With Necessary Supports And Accessories- Ib Building Block F Side Gate , Supply And Install Led Outdoor, Ip 65, Motion Sensor 15W - 30W Flood Light For Ib Building Block F Side Gate , Supply And Install Biometric Readers, Cepas Card Access Terminals, Ensure The Integration With Current Biometric Systems For Ib Building Block F Side Gate. , Supply Labour, Tools, And Materials To Level And Widen Pavement To Estimated Width1400mm For Ib Building Block F, Side Gate , Supply Labour, Tools, And Materials For Touch-Up Work, Including Reinstatement The Surrounding At The New Turnstile, Painting, And Coating, Upon Completion For Ib Building Block F Side Gate , Supply And Install Cabling With Necessary Containment Or Gi Conduits From The Nearest Distribution Panel To The New Turnstile. Ensure The Cable Is Durable And Suitable For Both Outdoor And Underground Use For Ib Building Block F, Side Gate , Supply And Install Utp Cat 6 Cables With The Necessary Gi Conduit, Whether Concealed Or Exposed, And Containment, Whether Indoor Or Outdoor, From The Existing System To The New Turnstile For Ib Building Block F, Side Gate , Commissioning Works: Perform Interfacing Work, Including Programming And Connecting The New Turnstile To The Existing System For Ib Building Block F Side Gate , Warranty Coverage For 12 Months Including Dlp For All Works Done At Block F, Side Gate , Updating Of Single Line Diagram With Lew Endorsement For Ib Building Block F, Side Gate , Install Full-Height Turnstile For School Main Entrance , Construct A Composite Panel Shelter With Support And Accessories To Link From Shelter Outside Turnstile To New Turnstile To Existing Shelter Near Main Gate. , Remove Existing Main Gate Including 3 Hinges , Supply And Install Led Outdoor, Ip 65, Motion Sensor 15W - 30W Flood Light For Main Gate , Supply And Install Biometric Readers, Cepas Card Access Terminals, Ensure The Integration With Current Biometric Systems For Main Gate. , Supply Labour, Tools, And Materials To Level Pavement At Main Gate With Estimated Dimension: 12000Mm (Length) X 1400Mm (Width) , Supply Labour, Tools, And Materials For Touch-Up Work For Main Gate, Including Reinstatement The Surrounding At The New Turnstile, Painting, And Coating, Upon Completion. , Supply And Install Utp Cat 6 Cables For Main Gate With The Necessary Gi Conduit, Whether Concealed Or Exposed, And Containment, Whether Indoor Or Outdoor, From The Existing System To The New Turnstile. , Commissioning Works For Main Gate: Perform Interfacing Work, Including Programming And Connecting The New Turnstile To The Existing System. , Warranty Coverage For 12 Months Including Defect Liability Period (Dlp) For All Works Done At Main Gate , Link To Our Fire Alarm Main Panel Located At Level 1 Of Ib Block Near To The Foyer Area. During Fire Alarm Activation, The Turnstile Must Be Able To Release And Allow All To Access Or Exit For Side Gate. , Link To Our Fire Alarm Main Panel Located At Level 1 Of Ib Block Near To The Foyer Area. During Fire Alarm Activation, The Turnstile Must Be Able To Release And Allow All To Access Or Exit For Main Gate.
|