Contract Award For Revamping Existing Toilets At Old Block, New Block & Boarding School . ...


Contract Award Notice

TRR 20785398
Organization Anglo-Chinese School (Independent)
Tender No INDACIETT24000005
Funded By Self-Funded
Country Singapore , South Eastern Asia
Contract Value 498,292

Work Detail

Contract Award For Revamping Existing Toilets At Old Block, New Block & Boarding School . Appointed Site Engineer / Supervisor With Minimum Bcss To Liaise With Project Manager In Applying Relevant Work Documents. (For Estate) , Provision Of S$2 Million Public Liability Insurance Exclusive To Acs (Independent) For Estate , Provide Labours, Tools And Transportation To Carry Out Daily Housekeeping And Disposal All Wastes In Accordance To Client And Statutory Requirements. (For Estate) , Protection Works / Safety Measures , Contractors Are Required To Submit Relevant As-Built Drawings And O&M Manuals. (For Estate) , Toilets Works - Old Block Staircase A (9 Toilets) , Toilets Works - Old Block Staircase A (9 Toilets) , Toilets Works - Old Block Staircase A (9 Toilets) , Toilets Works - Old Block Staircase A (9 Toilets) , Toilets Works - Old Block Staircase A (9 Toilets) , Toilets Works - Old Block Staircase A (9 Toilets) , Toilets Works - Old Block Staircase A (9 Toilets) , Toilets Works - Old Block Staircase A (9 Toilets) , Toilets Works - Old Block Staircase A (9 Toilets) , Toilets Works - Old Block Staircase A (9 Toilets) , Toilets Works - Old Block Staircase A (9 Toilets) , Toilets Works - Old Block Staircase A (9 Toilets) , Toilets Works - Old Block Staircase A (9 Toilets) , Toilets Works - Old Block Staircase A (9 Toilets) , Toilets Works - Old Block Staircase A (9 Toilets) , Toilets Works - Old Block Staircase A (9 Toilets) , Toilets Works - Old Block Staircase A (9 Toilets) , Toilets Works - Old Block Staircase A (9 Toilets) , Toilets Works - Old Block Staircase C (10 Toilets) , Toilets Works - Old Block Staircase C (10 Toilets) , Toilets Works - Old Block Staircase C (10 Toilets) , Toilets Works - Old Block Staircase C (10 Toilets)- Individual Tempered Non-Distortion Rim Mirrors. (Sizes Will Subjected To The Existing Toilet Layout) , Toilets Works - Old Block Staircase C (10 Toilets) , Toilets Works - Old Block Staircase C (10 Toilets) , Toilets Works - Old Block Staircase C (10 Toilets) , Toilets Works - Old Block Staircase C (10 Toilets) , Toilets Works - Old Block Staircase C (10 Toilets) , Toilets Works - Old Block Staircase C (10 Toilets) , Toilets Works - Old Block Staircase C (10 Toilets) , Toilets Works - Old Block Staircase C (10 Toilets) , Toilets Works - Old Block Staircase C (10 Toilets) , Toilets Works - Old Block Staircase C (10 Toilets) , Toilets Works - Old Block Staircase C (10 Toilets) , Toilets Works - Old Block Staircase C (10 Toilets) , Toilets Works - Old Block Staircase C (10 Toilets) , Toilets Works - Old Block Staircase C (10 Toilets) , Toilets Works - Old Block Staircase D (6 Toilets) , Toilets Works - Old Block Staircase D (6 Toilets) , Toilets Works - Old Block Staircase D (6 Toilets) , Toilets Works - Old Block Staircase D (6 Toilets) , Toilets Works - Old Block Staircase D (6 Toilets) , Toilets Works - Old Block Staircase D (6 Toilets) , Toilets Works - Old Block Staircase D (6 Toilets) , Toilets Works - Old Block Staircase D (6 Toilets) , Toilets Works - Old Block Staircase D (6 Toilets) , Toilets Works - Old Block Staircase D (6 Toilets) , Toilets Works - Old Block Staircase D (6 Toilets) , Toilets Works - Old Block Staircase D (6 Toilets) , Toilets Works - Old Block Staircase D (6 Toilets) , Toilets Works - Old Block Staircase D (6 Toilets) , Toilets Works - Old Block Staircase D (6 Toilets) , Toilets Works - Old Block Staircase D (6 Toilets) , Toilets Works - Old Block Staircase D (6 Toilets) , Toilets Works - Old Block Staircase D (6 Toilets) , Toilets Works - Old Block Staircase D (6 Toilets) , Toilets Works - Old Block Near Living Water Staff Lounge (1 Toilet) , Toilets Works - Old Block Near Living Water Staff Lounge (1 Toilet) , Toilets Works - Old Block Near Living Water Staff Lounge (1 Toilet) , Toilets Works - Old Block Near Living Water Staff Lounge (1 Toilet) , Toilets Works - Old Block Near Living Water Staff Lounge (1 Toilet) , Toilets Works - Old Block Near Living Water Staff Lounge (1 Toilet) , Toilets Works - Old Block Near Living Water Staff Lounge (1 Toilet) , Toilets Works - Old Block Near Living Water Staff Lounge (1 Toilet)- Plastic Blade Pull Switch Wall Fan 16 Inch (Each Toilet) , Toilets Works - Old Block Near Living Water Staff Lounge (1 Toilet)- Motion Detector , Toilets Works - Old Block Near Living Water Staff Lounge (1 Toilet)- Hand Dryer (Each Toilet) , Toilets Works - Old Block Near Living Water Staff Lounge (1 Toilet) , Toilets Works - Old Block Near Living Water Staff Lounge (1 Toilet) , Toilets Works - Old Block Near Living Water Staff Lounge (1 Toilet) , Toilets Works - Old Block Near Living Water Staff Lounge (1 Toilet) , Toilets Works - Old Block Near Living Water Staff Lounge (1 Toilet) , Toilets Works - Old Block Near Living Water Staff Lounge (1 Toilet) , Toilets Works - Old Block Staff Room (5 Toilets) , Toilets Works - Old Block Staff Room (5 Toilets) , Toilets Works - Old Block Staff Room (5 Toilets) , Toilets Works - Old Block Staff Room (5 Toilets) , Toilets Works - Old Block Staff Room (5 Toilets) , Toilets Works - Old Block Staff Room (5 Toilets) , Toilets Works - Old Block Staff Room (5 Toilets) , Toilets Works - Old Block Staff Room (5 Toilets) , Toilets Works - Old Block Staff Room (5 Toilets) , Toilets Works - Old Block Staff Room (5 Toilets) , Toilets Works - Old Block Staff Room (5 Toilets) , Toilets Works - Old Block Staff Room (5 Toilets) , Toilets Works - Old Block Staff Room (5 Toilets) , Toilets Works - Old Block Staff Room (5 Toilets) , Toilets Works - Old Block Staff Room (5 Toilets) , Toilets Works - Old Block Staff Room (5 Toilets) , Toilets Works - Old Block Staff Room (5 Toilets) , Toilets Works - Ib Block A (6 Toilets) , Toilets Works - Ib Block A (6 Toilets) - Push Button Self Closing Tap , Toilets Works - Ib Block A (6 Toilets) - Vanity Top , Toilets Works - Ib Block A (6 Toilets) - Individual Tempered Non-Distortion Rim Mirrors. , Toilets Works - Ib Block A (6 Toilets) - Wall-Hung Urinal , Toilets Works - Ib Block A (6 Toilets) - Wall-Mounted Urinal Partition Divider , Toilets Works - Ib Block A (6 Toilets) - Pedestal Water Closet , Toilets Works - Ib Block A (6 Toilets) - Bidet Toilet Spray Gun Set For All Cubicle , Toilets Works - Ib Block A (6 Toilets) - Dual Flush Wc Sensor Flush Valve With Manual Bypass & Cam Lock (Can Be In Any Shape) , Toilets Works - Ib Block A (6 Toilets) - Plastic Blade Pull Switch Wall Fan 16 Inch , Toilets Works - Ib Block A (6 Toilets) - Motion Detector (Each Toilet) , Toilets Works - Ib Block A (6 Toilets) - Hand Dryer (Each Toilet) , Toilets Works - Ib Block A (6 Toilets) - Exhaust Fan (Each Toilet) , Toilets Works - Ib Block A (6 Toilets) - Bypass Switch To Interface With Exhaust Fan, Led Lightings And Wall Fans. , Toilets Works - Ib Block A (6 Toilets) - Mechanical Keyless Entry Door Lock With Handle , Toilets Works - Ib Block A (6 Toilets) - Toilet Doors (Each Toilet) , Toilets Works - Ib Block A (6 Toilets) , Toilets Works - Ib Block A (6 Toilets) , Toilets Works - Ib Block E (2 Toilets) - Ceramic Bathroom Basin (Oval Shape Under Counter Basin) , Toilets Works - Ib Block E (2 Toilets) - Push Button Self Closing Tap , Toilets Works - Ib Block E (2 Toilets) - Vanity Top (Each Toilet) , Toilets Works - Ib Block E (2 Toilets) - Individual Tempered Non-Distortion Rim Mirrors. , Toilets Works - Ib Block E (2 Toilets) - Wall-Hung Urinal , Toilets Works - Ib Block E (2 Toilets) - Wall-Mounted Urinal Partition Divider , Toilets Works - Ib Block E (2 Toilets) - Pedestal Water Closet , Toilets Works - Ib Block E (2 Toilets) - Bidet Toilet Spray Gun Set For All Cubicle , Toilets Works - Ib Block E (2 Toilets) - Dual Flush Wc Sensor Flush Valve With Manual Bypass & Cam Lock (Can Be In Any Shape) , Toilets Works - Ib Block E (2 Toilets) - Plastic Blade Pull Switch Wall Fan 16 Inch (Each Toilet) , Toilets Works - Ib Block E (2 Toilets) - Motion Detector (Each Toilet) , Toilets Works - Ib Block E (2 Toilets) - Hand Dryer (Each Toilet) , Toilets Works - Ib Block E (2 Toilets) - Exhaust Fan (Each Toilet) , Toilets Works - Ib Block E (2 Toilets) - Bypass Switch To Interface With Exhaust Fan, Led Lightings And Wall Fans. , Toilets Works - Ib Block E (2 Toilets) - Mechanical Keyless Entry Door Lock With Handle (Each Toilet) , Toilets Works - Ib Block E (2 Toilets) - Toilet Doors (Each Toilet) , Toilets Works - Ib Block E (2 Toilets) - Toilet Cubicles , Toilets Works - Ib Block E (2 Toilets) - E27 Surface Mount Downlight Holder , (Block A Level 2 & Level 4 Male And Female Toilets) , The Contractor Needs To Undertake Necessary Plastering And Repairs Before Applying Paint [2 Layers] (Paint Colour Should Match The Existing Colour Scheme, Resist Moisture & Mildew) (Each Toilet) Total 39 Toilets , The Contractor Is Responsible To Reinstatement The Water Heater, Baby Changing Station, Hand Soap Dispenser, Toilet Roll Dispenser, Air Freshener, Paper Hand Towel Dispenser. And Other Items Found In Some Toilets. (Total 39 Toilets) , Lux Level Test With Report In Accordance To Ss531 - Old Block Staircase A,C, D, Living Water Staff Lounge, Staff Rooms, Ib Block A & Ib Block E. (Total 39 Toilets) , Testing And Commissioning Of Electrical System For Old Block Staircase A, C, D, Living Water Lounge, Staff Room, Ib Block A & Ib Block E (Total 39 Toilets) , Testing And Commissioning Of Plumbing System - Old Block Staircase A, C, D, Living Water Lounge, Staff Room, Ib Block A & E (Total 39 Toilets) , Testing And Commissioning Of Exhaust Fan System - Old Block Staircase A, C, D, Living Water Lounge, Staff Room, Ib Block A & E (Total 39 Toilets) , 12 Months Warranty Coverage And Defect Liability Period (Dlp) - Old Block Staircase A , 12 Months Warranty Coverage And Defect Liability Period (Dlp) - Old Block Staircase C , 12 Months Warranty Coverage And Defect Liability Period (Dlp) - Old Block Staircase D , 12 Months Warranty Coverage And Defect Liability Period (Dlp) - Old Block Living Water Staff Lounge , 12 Months Warranty Coverage And Defect Liability Period (Dlp) - Old Block Staff Room , 12 Months Warranty Coverage And Defect Liability Period (Dlp) - Ib Block A , 12 Months Warranty Coverage And Defect Liability Period (Dlp) - Ib Block E , Optional Cost - , Appointed Site Engineer / Supervisor With Minimum Bcss To Liaise With Project Manager In Applying Relevant Work Documents. (For Boarding School) , Provision Of S$2 Million Public Liability Insurance Exclusive To Acs (Independent) Boarding School , Provide Labours, Tools And Transportation To Carry Out Daily Housekeeping And Disposal All Wastes In Accordance To Client And Statutory Requirements. (Boarding School) , Protection Works / Safety Measures (For Boarding School) , Contractors Are Required To Submit Relevant As-Built Drawings And O&M Manuals. , Toilet Works - Hall 6 Level 3 (5 Toilets) - Dual Flush Water-Closet (Oval-Shaped) , Toilet Works - Hall 6 Level 3 (5 Toilets) - Electric Heater With Shower Accessories , Toilet Works - Hall 6 Level 3 (5 Toilets) - Mirrors , Toilet Works - Hall 6 Level 3 (5 Toilets) - Taps (Basin) , Toilet Works - Hall 6 Level 3 (5 Toilets) - Taps (Shower) , Toilet Works - Hall 6 Level 3 (5 Toilets) - Basins , Toilet Works - Hall 6 Level 3 (5 Toilets) - Pvc Bottle Trap , Toilet Works - Hall 6 Level 4 (5 Toilets) - Dual Flush Water-Closet (Oval-Shaped) , Toilet Works - Hall 6 Level 4 (5 Toilets) - Electric Heater With Shower Accessories , Toilet Works - Hall 6 Level 4 (5 Toilets) - Mirror , Toilet Works - Hall 6 Level 4 (5 Toilets) - Taps (Basin) , Toilet Works - Hall 6 Level 4 (5 Toilets) - Taps (Shower) , Toilet Works - Hall 6 Level 4 (5 Toilets) - Basin , Toilet Works - Hall 6 Level 4 (5 Toilets) - Pvc Bottle Trap , Toilet Works - Hall 7 Level 3 (5 Toilets) - Dual Flush Water-Closet (Oval-Shaped) , Toilet Works - Hall 7 Level 3 (5 Toilets) - Electric Heater With Shower Accessors , Toilet Works - Hall 7 Level 3 (5 Toilets) - Mirror , Toilet Works - Hall 7 Level 3 (5 Toilets) - Taps (Basin) , Toilet Works - Hall 7 Level 3 (5 Toilets) - Taps (Shower) , Toilet Works - Hall 7 Level 3 (5 Toilets) - Basin , Toilet Works - Hall 7 Level 3 (5 Toilets) - Pvc Bottle Trap , Toilet Works - Hall 7 Level 4 (5 Toilets) - Dual Flush Water-Closet (Oval-Shaped) , Toilet Works - Hall 7 Level 4 (5 Toilets) - Electric Heater With Shower Accessories , Toilet Works - Hall 7 Level 4 (5 Toilets) - Mirror , Toilet Works - Hall 7 Level 4 (5 Toilets) - Taps (Basin) , Toilet Works - Hall 7 Level 4 (5 Toilets) - Taps (Shower) , Toilet Works - Hall 7 Level 4 (5 Toilets) - Basin , Toilet Works - Hall 7 Level 4 (5 Toilets) - Pvc Bottle Trap , Toilet Works - Hall 8 Level 5 (10 Toilets) - Dual Flush Water-Closet (Oval-Shaped) , Toilet Works - Hall 8 Level 5 (10 Toilets) - Electric Heater With Shower Accessories , Toilet Works - Hall 8 Level 5 (10 Toilets) - Mirror , Toilet Works - Hall 8 Level 5 (10 Toilets) - Taps (Basin) , Toilet Works - Hall 8 Level 5 (10 Toilets) - Taps (Shower) , Toilet Works - Hall 8 Level 5 (10 Toilets) - Basin , Toilet Works - Hall 8 Level 5 (10 Toilets) - Pvc Bottle Trap , Not To Remove The Vanity Tops, Patch Back The Holes After Removing The Existing Basins To Modify & Prepare The Vanity Tops For Countertop Basins. (For Hall 6 Level 3 & 4, Hall 7 Level 3 & 4 & Hall 8 Level 5 - Total 30 Toilets ) Price Quoted Per Toilet , Clean The Bathroom Tiles (Wall, Floor & Vanity Top) To Remove Yellow Stains, Tile Grout, Mould And Mildew From The Tile Surface (For Hall 6 Level 3 & 4, Hall 7 Level 3 & 4, Hall 8 Level 5 Total- 30 Toilets) Price Quoted Per Toilet , Apply Epoxy Paints After Surface Cleaning For Vanity Tops, Wall Tiles And Floor Tiles , Patch The Cracked Tiles In All Toilets, Plastering By Applying Cement Screed To Smooth The Surface, And Then Paint Over With A Closer Paint Colour Before Proceeding With Epoxy Painting For All 30 Toilets , To Dismantle And Reinstall Necessary Accessories Such As Shampoo Racks, Towel Rails, Toilet Paper Holders, Shower Curtain Rods And Other Items Found In Some Toilets (For Total 30 Toilets) , 12 Months Warranty Coverage And Defect Liability Period (Dlp) For Boarding School (Total 30 Toilets)

Key Dates

Contract Date 18 Sep 2024

Contact Information

Company Name Galaxy Studio Interior Pte. Ltd.
Contract Value 498,292
Contract Date 18 Sep 2024

Complete details of the selected Tender
Organisation Name : Vijaya Bank
Organisation Type : Public Sector Banks Ministry : Ministry of Finance
Tender Ref. No : DIT/DELHIARMB/07052016/1
Tender Title : E-Auction Sale Notice for the properties of M/s Guru Kripa Iron Trading Pvt Ltd, mortgaged to Vijaya Bank and taken possession under the provisions of SARFAESI Act 2002.
Product Category : Land/Building
Sub Category :
Tender Value (INR if not mentioned):
Rs 1,62,00,000/-
EMD :
1620000
Document Cost :
0
Tender Type : Auction
Location : Delhi
First   
Announcement Date :
5-July-2016  
Publication Date on Portal: 5-July-2016 At : 8:03:09 PM  
Last Date of Document Collection :  
8-August-2016 Up To : 5:00 PM  
Last date for  
Submission :
8-August-2016 Up To : 5:00 PM  
Opening Date : 10-August-2016 At : 11:00 AM  
Work Description :
Pre-Qualification :
PreBid Meet Date : --
Tender Document : View Document *
Bid Document : Document Not available
Tech. Document : Document Not available
Sector : Banking, Finance & Insurance
State : Karnataka
 
For further Information Contact:
Name : Santhosh Aili
E-Mail : cbsprog11@vijayabank.co.in
Phone Office : 08025584066
Fax : 08025582747
Address :
City : Bangalore

  download Adobe® Reader®
Adobe® and Get Adobe® Reader® logo are trademarks or registered trademarks of Adobe Systems Inc. in the US and/or other countries.

View Notice Now...

Login with your Social Account for Instant Access to this notice


Tell us about your Product / Services,
We will Find Tenders for you