Contract Award For Provision & Installation Of Security Gates And Biometric System Including Authority Submission Of Fire Safety Cert . Appointed Site Engineer / Supervisor/Project Manager With Minimum Bcss To Liaise With Boarding School In Applying Relevant Work & Documents. , Provide Labours, Tools And Transportation To Carry Out Daily Housekeeping And Disposal All Wastes In Accordance To Client And Statutory Requirements. , Necessary Protection Before Work Commencement. This Including The Necessary Safety Cordoning And Coverage When The Work Is On-Going. , Staging In Term Of Scaffolding If Necessary For Work At Heights. This Involves Ensuring The Availability Of Personnel Trained For Working At Heights. , Authority Submissions Entail Qualified Persons (Qp) Evaluation, Updating Of Building Plan, Calculations, Inspections, And Endorsements As Required. , The Contractor Shall Provide All Necessary Resources, Including Labour, Materials, Transport, And The Purchase Of Drawings From Bca For Submission To Scdf/Fsb Including All Fees For Plan Submissions And Any Subsequent Fees To Scdf/Fsb. , Submission Of Relevant As-Built Drawings, Bp Plan, Certificates And O&M Manuals. (Om&M Template To Follow School Requirement Including Before And After Photos). , Interfacing Works For Installation Of Metal Gates: , Supply Labour, Materials, And Tools For The Below Works: , 12 Months Warranty Coverage For The Reinstatement And Installation Works Including Dlp For 5 Gates , Option No. 2- Gate Installation Works In Material: Mild Steel Painting For Hall 1 Main Staircase , Option No.2- Gate Installation Works In Material: Mild Steel Painting For Hall 4 , Option No. 2- Gate Installation Works In Material: Mild Steel Painting For Hall 5 , Option No. 2- Gate Installation Works In Material: Mild Steel Painting For Hall 8 To Track Field , Option No. 2- Gate Installation Works In Material: Mild Steel Painting For Hall 8 Main Staircase , Provision Of S$1 Million Public Liability Insurance That Exclusive For Acs (Independent). [To Include Schools Name In It ] And Workmen Injury Compensation Insurance As Well As Statutory Required Documentations And Signages Within One (1) Week From Loa , Installation Of Biometric System: Hall 1 Main Staircase- Quantity: 1 In/Out Biometric Reader , Installation Of Biometric System: Hall 4 -Quantity: 1 In/Out Biometric Reader , Installation Of Biometric System: Hall 5 -Quantity: 1 In/Out Biometric Reader , Installation Of Biometric System: Hall 8-Main Staircase Quantity: 1 In/Out Biometric Reader , Installation Of Biometric System: Hall 8 To Track Field -Quantity: 1 In/Out Biometric Reader , Installation Of Biometric System: Two Additional Biometric Locks In 1St Floor Near To Dining Hall Quantity: 2 In/Out Biometric Readers , Testing And Commissioning Of The Interfacing Works For Biometric System Including Cabling Works , Builder Work For Supply And Installation Of Biometric System , 24 Months Warranty Coverage For The Reinstatement And Installation Works Including Dlp For 7 Units Of Biometric System , Other Works Deemed Necessary
|