Contract Award Notice |
|
TRR | 16668449 |
Organization | City Of Rapperswil-Jona |
Tender No | |
Funded By | Self-Funded |
Country | Switzerland , Western Europe |
Contract Value | 4 Million |
Work Detail |
Contract Award For BKP 250 Sanitary Facilities The Sanitary Facilities Are Integrated Into Lightweight Construction Walls. On The Ground Floor There Is A Spacious Production Kitchen Supplied With Nitrogen Gas To Operate A Packaging Plant. The Water Treatment Includes A Counter-Osmosis System And A Softening System. The Domestic Hot Water Is Provided Via A Contracting Center And Kept Warm By An Intelligent Circulation System. On The Nursing Floors There Are A Total Of 13 Bedpan Combinations And A Nursing Tub. The Dirty Water Is Drained Out Of The Building Via A High-Level Pipe. In Order To Drain The Basement, A Lifting System Is Required To Pump The Wastewater Above The Gravity Level. The Two Inner Courtyards In The North And South Wings Have Separate Drainage Systems. The Rainwater In The Building Is Directed To The Basement And From There Via Overhead Pipes To The Infiltration Areas. In Addition, A Fountain Will Be Installed In The Inner Courtyard. |
Key Dates |
|
Contract Date | 17 Jan 2024 |
Contact Information |
|||||||||||||||||||||||
View Notice Now...Login with your Social Account for Instant Access to this notice
|