Contract Award For Aue Power Plant – Revision Of Machine Group 2 – Lot Turbine The Aue ...


Contract Award Notice

TRR 14674270
Organization Limmatkrafte AG
Tender No
Funded By Self-Funded
Country Switzerland , Western Europe
Contract Value 772,204

Work Detail

Contract Award For Aue Power Plant – Revision Of Machine Group 2 – Lot Turbine The Aue River Power Plant Consists Of A Control Center, A Three-Field Weir And A 300 M Long, Upstream Power Plant Canal. In 2024 It Is Planned To Overhaul And Modernize Machine Group 2. The Turbine Revision MG2 Lot Includes The Dismantling, Revision, Modernization By Installing Existing New Impeller Blades, Reassembly And Commissioning Of The Following Turbine: Type: Kaplan Gear Shaft Tubular Turbine Double Regulated With Transmission Gear Nominal Water Volume: 36 M3/S Net Gradient: 5.55 M Nominal Power Turbine (Incl. Gearbox ): 1740 Kw Impeller Diameter: 2700 Mm Nominal Speed Turbine: 136.4 Rpm Nominal Speed Of Generator: 1000 Rpm Burning Speed Of Turbine/Generator: Approx. 415/3045 Rpm Installation Site: 351.80 M Above Sea Level. (Middle Of Impeller) Min. Underwater Level: 351.14 M Above Sea Level. Min. Suction Height: Approx. +0.66 M The Gearbox Will Neither Be Removed Nor Revised As It Is In Good Condition. Any Necessary Revision Of The Generator Is A Separate Lot.

Key Dates

Contract Date 17 Aug 2023

Contact Information

Company Name Kochendörfer Hydroelectric Power Plants
Contract Value 772,204
Contract Date 17 Aug 2023