Request For Demo     Request For FreeTrial     Subscribe     Pay Now

United States Procurement News Notice - 75389


Procurement News Notice

PNN 75389
Work Detail Standards survey identifies key requirements needed for new transmission systems International accredited registrar and classification society DNV has concluded the first phase of its HVDC Standards joint industry project (JIP), which was convened to identify deficiencies in standards for high voltage direct current (HVDC) transmission systems in the US. In the opening stage of the JIP a high-level survey was conducted to identify the requirements and codes needed to implement HVDC transmission systems. Four types of standards emerged as priorities: Performance/Grid Code; manuals for regional transmission organization (RTO) and independent system operators (ISO); Utility Interconnection Manuals; and Offshore Design Requirements. The survey found some functionalities, such as active power control, reactive power control, fault ride-through, dynamic voltage control, and frequency control, have been at least partially addressed in the existing US Grid Code. However, several other functionalities, including control modes, islanded operation, and adaptive control are not covered, it discovered. Even for those functionalities that are included in the US Grid Code, there remain significant gaps, the survey concluded. Over the next three years Oslo-headquartered DNV and JIP partners including Atlantic Shores Offshore Wind, EDF Renewables, Equinor, Invenergy, National Grid Ventures, Ocean Winds, PPL TransLink WindGrid, RWE, Shell and TotalEnergies, will delve deeper into the identified gaps, focusing primarily on the first three types of standards. These focus on setting formal electrical standards or rule makings for RTOs and utilities. This work will consist of three distinct phases, each roughly a year in length. During the first year, DNV, JIP participants, and an advisory committee will conduct a HVDC standards gap analysis and prioritise the relative importance of the identified gaps. In 2025 and 2026, study participants will establish and implement a plan to address the identified gaps. These recommendations will likely include proposals to initiate NERC SAR or IEEE PAR proceedings and updates to RTO rules and offshore wind solicitation requirements, said the Norwegian outfit. “The speed at which we can bring about the transition to clean energy depends very much on the modernisation of the US transmission grid,” said region president, Energy Systems North America at DNV, Richard S Barnes. “Incorporating HVDC will increase the reliability and capacity of the transmission system, and it is essential that the current US Grid Code has performance standards that will ensure the safe and effective operations.” The timely setting of performance standards for HVDC transmission is imperative given the expected growth in both electricity demand and renewable energy generation, said DNV. According to its 2023 Energy Transition Outlook North America, the grid must increase its capacity 2.5 times by 2050 to be able to support the projected influx of renewable energy resources. Currently 98% of transmission lines in North America are HVAC, but the report forecasts that the share of HVDC lines will increase to 10%, given the lower expense and ability to transmit high capacity at low levels of loss, especially undersea cables connecting offshore wind. Codifying performance standards will enable this projected expansion of HVDC transmission lines in the US and beyond.
Country United States , Northern America
Industry Energy & Power
Entry Date 31 Aug 2024
Source https://renews.biz/95383/dnv-completes-first-stage-of-us-hvdc-project/

Tell us about your Product / Services,
We will Find Tenders for you