2. The Subject Of The Order Is The Revitalization And Development Of The Areas Next To The Blocks Of Flats At Ul. Legionów 16-18 On Plot 437 Rev.214; Street Bohaterów Westerplatte 3-5 On The Plot 1865/2 Rev.207; Street Bohaterów Westerplatte 5-7 On The Grounds 1868/2 Rev. 207; Street Marii Skłodowska-Curie 2 On The Plot Of 1642, Rev.207; Street Hetmańska 14-16 On Plot 1448/8 Rev.207. The Aim Is To Deconcrete The Space For Green Areas, As Part Of The Co-Financed Project Fenx 2021-2027. The Scope Of Works Includes: - Geodetic Measurements And Surface Surveys - Removal Of Asphalt Surfaces Together With The Substructure; Dismantling Of Concrete Slabs, Subsequent Leveling Of The Area - Dismantling And Installation Of Benches, Garbage Bins, Parklet; The Elements Must Have Approvals And Certificates Allowing The Device For Public Use - In Places Designated For Planting, The Native Soil Should Be Removed And Replaced With A Planting Substrate, It Should Be Free Of Pests, Weeds, Pathogens, Stones Or Garbage, Fertile, Humus, And Properly Permeable, Contain A Sufficient Amount Of Material - Purchase And Fertilization Of Fertile Soil (10 Cm Thick Layer), Taking Into Account The Work And Materials Necessary For Proper Execution - Recultivation Of The Area At The Site Of Earthworks, Use A Mixture Of Grasses With Increased Resistance To Temporary Water Shortages And Insufficient Fertilizer Doses, At The Same Time, The Species Used In The Mixture Are To Create A Durable And Dense Turf Resistant To Traffic Pollution - Cleaning The Area, Digging Up The Soil , Adjusting Soil Properties, Weeding - Laying Agrotextile With A Weight Of 70-100G/M2 With A Uv Stabilizer 100% Polypropylene With Pvc Pins 9 Min (5 Pcs/M2) Attached To The Ground, Which Allows Water To Pass Through In Both Directions And Ensures Adequate Air Circulation, While Preventing The Growth Of Weeds - Installation Of A Pvc Lawn Edging Made Of Plastic, Black, 6-7 Cm High With Pins Min. 3 Pcs Per 1 Meter - Covering The Area Under The Planted Plants With Medium-Ground Pine Bark Of A Fraction Of 20-50 Mm, Natural Color, Composted - Thick Layer. 5Cm Lined With Fiber - Export, Waste Disposal; Purchase And Transport Of Necessary Materials And Elements - Clearing Debris From The Area, Delivering Soil, Leveling The Area, Rolling - Digging A Trough In The Pedestrian Area And Making A Mineral-Resin Surface With An Edge Made Of Metal Strips With Substructures - Digging Space For 100X40x10cm Slabs; Laying Slabs Imitating Wood (Ul. Marii Skłodowskiej-Curie 2) - Planting Plants In The Form Of Trees, Shrubs, Grasses And Perennials, Which Are Native, Nursery Species, Must Have A Label With The Full Name, Plant Passports, Appropriate Size And Be Compliant With Required Parameters - Designating The Location Of Plantings In Accordance With The Design Documentation And So Drzew In Appropriate Clusters And Distances Per M2 - Securing The Area Against Use Until The Grass Grows, In The Event Of No Grass Seeds Germinating Or T
|