Renovation Of The Street Ignacy Skorupka Along With Adjacent Roads In Leszno.1) In The Scope Of The Implementation Of The Task Of Renovation Of The Street Ks. Ignacy Skorupka Together With Adjacent Roads In Leszno, It Is Planned To Perform, Among Others: A) Demolition Of The Existing Surface And Vertical Markings, B) Construction Of A Trough For The Road Surface Structure, C) Installation Of Concrete Edges And Curbs On A Footing With Resistance, D) Execution Sewage From Concrete Cubes On A Concrete Footing, E) Profiling And Compaction Of The Substrate, F) Making The Base Base From The Mixture C5/6 Or C3/4 In Accordance With The Design Documentation, G) Construction Of A Surface Made Of Concrete Cubes On A Cement-Sand Ballast, H) Construction Of A Storm Sewage System With A Diameter Of Dn315 Mm, I) Construction Of Storm Drains With A Diameter Of Dn160 Mm, J) Installation Of Prefabricated Wells Dn1000 Mm, K) Installation And Construction Of Manholes For Rain Inlets Dn500mm, L) Carrying Out And Documenting Possible Works Archaeological Note: • The Above Scope Of The Subject Of The Order Applies To The Streets Marked In The Documentation As: O Ul. Priest Ignacego Skorupki (Km 0+000.00 - Km 0+136.50) Section 1 - Ul. Hans Christian Andersen (Km 0+000.00 - Km 0+051.30) Section 2 - Ul. Hans Christian Andersen (Km 0+000.00 – Km 0+034.05) At Ul. Złotnicza (Km 0+000.00 - Km 0+057.00)• When Carrying Out Construction Works, Existing Trees That Do Not Interfere With The Planned Investment Should Be Protected Against Damage In Accordance With Annex No. 12 To The Swz.• In The Event Of Any Damage To The Trees, The Person Responsible For Investor Supervision Should Be Notified Immediately.• Construction Works Related To Compacting The Subsoil And Surface Structure Layers In The Vicinity Of Plot No. 263 Ares. Maps 136 Of District 0005, Registration Unit 306301_1 Should Be Carried Out Without The Use Of Equipment That Could Negatively Affect The Buildings Located On The Above-Mentioned Property. The Detailed Scope Of Works And The Method Of Their Implementation Are Described In The Architectural And Construction Designs, Executive Designs, Technical Specifications For The Execution And Acceptance Of Construction Works, And Bills Of Quantities. The Above-Mentioned Documentation Constitutes Annex No. 9 To The Swz. The Contractor Himself Will Assess The Final Scope Of Works Based On The Designs, Illustrative Cost Estimate, Stwiorb And On-Site Visit.
Contact Information
Address
Miasto Leszno,Leszno,64-100,Wielkopolskie,Pl417 - Leszczyński
Email
inf-in@leszno.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 90070595
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.