Other Building Completion Work – Dek-1450 Energetic Modernization Of Pszich.Institute. The Overall Goal Of The University Of Debrecen Is That During The Renovation Of The Buildings Belonging To It, In Connection With The Development Of The Infrastructure, Compliance With Environmental Protection Requirements, Including Those From A Climate Perspective, Is Realized. The University Of Debrecen Has Set Itself The Goal Of Energetically Modernizing The Building Of The Institute Of Psychology, Thus Moving Forward In The Field Of Energy-Efficient Operation. The External Energetic Renovation Works Are In Progress, And Within The Framework Of This Investment, The Goal Is The Internal Energetic Renovation Of The Building. An Additional 10% Energy Savings Can Be Achieved During The Internal Energy Renovation. Planned Design: The Planned Investment Includes The Internal Energy Renovation Of The Building Of The Institute Of Psychology, Dóczy József Street, During Which The Following Will Be Implemented: - The Construction Of A New Heat Pump Heating And Cooling System, - The Construction Of Building Automation, - The Modernization Of The Entire Electrical System, - The Construction Of A Low Current System, ( Reconstruction Of Fire Alarm System, It System, Renovation Of Existing Alarm And Access Control), - Partial Accessibility, - External Facade Installation Of Blinds - Necessary Aesthetic Restoration Of The Interior After The Completion Of The Electrical And Mechanical Renovation Works Building Data: The Area Of The Plot: 2197 M2 The Net Floor Area Of The Building Is 1874.31 M2 (Fsz: 802.47 M2, 1St Floor: 738, 11 M2, 2Nd Floor: 333.73 M2) Existing Installation: 936.93 M2=42.65% Existing Building Height: 8.98 M Existing Green Area: 664.1 M2=30.23% The Main Items And Quantities Related To The Investment: - Floor Covering: 102 M2 - Wall Covering: 226 M2 - Indoor Placement Of Doors: 65 - Placement Of Heat Pumps, Commissioning: 2 Pcs - Installation And Commissioning Of Air Convectors: 93 Pcs - Installation Of Electric Wires: 17,195 M - Placement Of Light Fixtures: 304 Pcs Further Details Of The Investment To Be Implemented Are Contained In The Public Procurement Documents (Technical Description, Plans And Unpriced Budgets). Any Type Name, Brand Name, Etc. Mentioned In Public Procurement Documents. It Only Serves The Exact Delimitation. 321/2015. (X.30.) Based On The Provisions Contained In § 46, Paragraph (3) Of The Government Decree, The Equivalent Performance Is Accepted.
Contact Information
Contact No.
+36 52512700-73067
Email
varga.agnes@fin.unideb.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 89746044
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.