Prior Information Notice For Overhaul And Refurbishment Work - Public Procurement Of Construction Works For ... in Lithuania
Tender Notice
TenderID
88740314
Tender Brief
Prior Information Notice For Overhaul And Refurbishment Work - Public Procurement Of Construction Works For Water Improvement Facilities And Their Infrastructure
Prior Information Notice For Overhaul And Refurbishment Work - Public Procurement Of Construction Works For Water Improvement Facilities And Their Infrastructure. In Order To Ensure Water Supply To The Settlements Of The Sez Of Kaunas, Karmėlava, Ramučiai, Neveronii, It Is Necessary To Design And Install A Water Body, Water Improvement Facilities (Hereinafter - Vgį) And Water Supply Networks. In This Section, Together With Technical Requirements And Specifications, The Following Areas Of Work Are Included: • Engineering Studies • Designing And Supervision Of Project Implementation • Installation Of Water Site • Construction Of Water Improvement Facilities • Construction Of Water Supply Networks • Installation Of Scada System • Testing, Commissioning And Trial Operation Of Constructed Structures • Operation And Preparation Of Maintenance Instructions • Personnel Training • Warranties The Contractor Will Have To Carry Out Engineering Geological And Topographical Surveys, Prepare Design Proposals For The Construction Of Water Bodies, Water Improvement Facilities And Water Supply Networks (Including Publicity) And Other Documents Necessary To Obtain A Construction Permit Document, Carry Out Project Expertise, Prepare Technical Work Project. The Contractor Will Have To Obtain The Connection And Other Conditions Necessary For The Preparation Of The Project (The Customer Will Grant Authorization). After Submitting Comments To The Prepared Design Proposals Or Technical Work Project, The Contractor Must Correct The Documents Based On The Reasonable Comments. Expertise Services Are Purchased And Paid For By The Customer. When Planning His Work, The Contractor Must Provide Realistic Deadlines For Negotiations With Third Parties Responsible For Permits, Etc. The Contractor Is Responsible For Obtaining And Checking The Data Required For The Design, Design, Construction, Production (Including That Carried Out By Its Suppliers), Installation, Maintenance, Training Of The Customers Employees, On-Site Inspection, Testing Of The Equipment And Commissioning Of Individual Facilities And Vgu.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88740314
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.